Sydney Trains Vlog 2284: Sydney Terminal Reconfiguration Project Update - December 2024

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ก.พ. 2025

ความคิดเห็น • 42

  • @tacitdionysus3220
    @tacitdionysus3220 หลายเดือนก่อน +2

    Hi, Phil. Great update, as is your habit. Wouldn’t change anything you are doing.
    There’s a place for all sorts of clip makers, from detailed descriptions of big projects, well researched historical treatises, people inviting debate about issues (very brave with cranky old responders like me around), and plenty of people learning the craft and getting better and better at it.
    Yours are always so frequent, well paced, well informed, and in a wholly natural style. It’s like having a mate who sends out regular “Hey, have a look at this” clips. I always look forward to them. Sheer gold. No need to change a thing.
    Oh, and as for a possible name change to STV, whatever floats your boat.

    •  หลายเดือนก่อน

      That weird jaguar introduction needs to go.

    • @tacitdionysus3220
      @tacitdionysus3220 หลายเดือนก่อน

      Hmmm. Maybe a close up of his coffee being made, with an image of a train, tracks or lollipop sign being created by the barista across the froth.

  • @RGC198
    @RGC198 หลายเดือนก่อน

    Hi Phil, excellent video. Great seeing all the progress happening at Central Station. Hopefully, everything there will be completed on time and it will be a smooth opening of the new platforms. Anyway, all the very best. Rob in Melbourne Australia.

  • @09SEP2009
    @09SEP2009 15 วันที่ผ่านมา

    Finally, those platforms are open. Its amazing how long it takes. I was hoping they'd be open by October 2024.

  • @ForTheBirbs
    @ForTheBirbs หลายเดือนก่อน +3

    Coffee, check. Central update, check! Cheers, Phil

  • @GamingWithMacca001
    @GamingWithMacca001 หลายเดือนก่อน

    Great Video Phil.

  • @transportvlogs
    @transportvlogs หลายเดือนก่อน +2

    Went to Central on Wednesday afternoon and saw that they were putting up the overhead. I came back yesterday afternoon and saw that the overhead is now up on platforms 12 & 14 and they were under way putting the overhead up on platform 13

  • @bengray976
    @bengray976 หลายเดือนก่อน +7

    I filmed at every single light rail station today between westmead and Carlingford

    • @sydneytrainsvlogs
      @sydneytrainsvlogs  หลายเดือนก่อน +2

      Well done! :)

    • @bengray976
      @bengray976 หลายเดือนก่อน

      @@sydneytrainsvlogs thank you

    • @AbitLippy
      @AbitLippy หลายเดือนก่อน +2

      I caught it from Dundas to Parramatta today to go to the guitar shop. Turns out the station is right at the front door 😊

    • @bengray976
      @bengray976 หลายเดือนก่อน

      @AbitLippy cool

  • @scrapzgd1343
    @scrapzgd1343 หลายเดือนก่อน +2

    seeing Central be so empty is something so unreal to me, maybe i should explore train stations in early/late hours, sounds peaceful

    • @SamSitar
      @SamSitar หลายเดือนก่อน

      off topic: sydney central would make a nice quake map. :)

  • @rkomgm3932
    @rkomgm3932 หลายเดือนก่อน +2

    Why are platforms 24 and 25 NOT being renovated? 😮

    • @sydneytrainsvlogs
      @sydneytrainsvlogs  หลายเดือนก่อน

      They are ok for the time being

    • @rkomgm3932
      @rkomgm3932 หลายเดือนก่อน +1

      @ they are disgusting dirty embarrassing not ok for the time being I ride this line shame on state rail

  • @peterd5300
    @peterd5300 หลายเดือนก่อน +1

    Well they renovate the old concourse passageway?

  • @peterbreis5407
    @peterbreis5407 หลายเดือนก่อน +1

    Change it to platform 9 and three quarters.
    Much better laid out than Southern Cross which is a mess, particularly with the signage.
    I understand how they thought they'd retain some of the historical feel of the old Central, but it really was pretty rubbish. Changing the platform roofs to the new modern design would complete the massive update appeal and help sell Sydney's transport.
    The suburban stations are all littered with the same unthinking over engineered rubbish and clutter. This is one case where new beats old no question. Get a new broom and clear it all out, to make commuting a pleasure instead of a pain.

  •  หลายเดือนก่อน

    The western end platform underpasses need to connect to the big open area.

  • @DMack6464
    @DMack6464 หลายเดือนก่อน

    I agree with your point of not renumbering the rest of the platforms, commuters have been using the station and platform numbers for as long as they've been alive, why change it?

  • @Nick-kz6dg
    @Nick-kz6dg หลายเดือนก่อน

    Now that the new overhead development has been canned, will any of the other platforms receive the new style canopies?

  • @qi-yf7tl
    @qi-yf7tl หลายเดือนก่อน

    Just wondering do u buy a coffee every weekdays u go to work

  • @joenewman1141
    @joenewman1141 หลายเดือนก่อน +1

    Is it privatisation?

    • @sydneytrainsvlogs
      @sydneytrainsvlogs  หลายเดือนก่อน

      No it’s just part of the upgrade :)

  • @TANSW1
    @TANSW1 หลายเดือนก่อน

    I've a request for a vid, travel to the stations that each letter for Christmas aligns to, eg C-Central and film update, H-Holsworthy, etc

  • @stevewoodroff6983
    @stevewoodroff6983 หลายเดือนก่อน

    Hi a.... It's been such a long time since I've seen Central... So, thanks for the update... Just one question... Why didn't they completely remove the unused third rail line between lines 8 and 9... Did they run out of money, or was it just the Ozzie thing... Couldn't be bothered...

    • @francesconicoletti2547
      @francesconicoletti2547 หลายเดือนก่อน +1

      Its a rail between platform 9 ( which the presenter is on ) and 10, which is still closed ( as you can see from the barricades at the stairway entrance early in the video and various bits of tape on the platform ) . One might infer from the closed state of platform that construction work, including taking up the redundant rails is not yet complete.

  • @cpaleolo
    @cpaleolo หลายเดือนก่อน

    Do you drink a Decaf Skim Cap or a Double shot Skim Cap ?

  • @Mediawatcher2023
    @Mediawatcher2023 หลายเดือนก่อน +1

    When is the completion date for Central Station the news there is no date

    • @sydneytrainsvlogs
      @sydneytrainsvlogs  หลายเดือนก่อน

      Should be my the 31st but may be later

    • @Mediawatcher2023
      @Mediawatcher2023 หลายเดือนก่อน

      @@sydneytrainsvlogs 31st of May Next year OK

  • @SamSitar
    @SamSitar หลายเดือนก่อน

    what does the reconfiguration allow? my voice sounds a bit strange to me as well.

    • @vincentgrinn2665
      @vincentgrinn2665 หลายเดือนก่อน

      it allows 10 car D sets which are 203m long, compared to the 8 car V sets 192m length
      compensating for the platforms getting shortened due to the northern concourse expansion
      cleaning up some parts of the yard and allowing for better flow
      better drainage in the dive
      some random improvements to signalling, overhead wires and what not

    • @aussiejohn5835
      @aussiejohn5835 หลายเดือนก่อน

      Our own voices sound different to all of us because what we hear in our heads is different to how others hear us and this is evident to us when we hear our voices played back on recordings and videos.

  • @jdouble-l19978
    @jdouble-l19978 หลายเดือนก่อน +1

    5:27- lol Please try the Kiwi accent more often! 😂

  • @sebe7570
    @sebe7570 หลายเดือนก่อน +1

    How are you doing Phil?

    • @sydneytrainsvlogs
      @sydneytrainsvlogs  หลายเดือนก่อน

      I’m good! How are you?

    • @sebe7570
      @sebe7570 หลายเดือนก่อน

      @@sydneytrainsvlogs You know us Gardeners are always busy this time of year