Demolition: 6896 Laurel Street (Part 3)

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 ม.ค. 2025

ความคิดเห็น • 23

  • @constructionwatcher5381
    @constructionwatcher5381 2 ปีที่แล้ว +5

    Thanks, John.
    The operator of the clam-shell rig seems a lot more aggressive than the one operating the shear. He's constantly in motion, and seems to know just what he going to do next all the time, unlike the other rig.

  • @Salguine
    @Salguine 2 ปีที่แล้ว +6

    This operator moves like he's afraid of damaging the building.

  • @dentonthaves5216
    @dentonthaves5216 2 ปีที่แล้ว +5

    This excavator operator is way to slow in demolishing that building.

  • @David-yk9hm
    @David-yk9hm 2 ปีที่แล้ว

    If you look closely you can see some stuff is still in the building. Like some pictures and some furniture.

  • @inescividanes2403
    @inescividanes2403 2 ปีที่แล้ว +2

    É humanamente impossive3l assistir uma demolição mcom esse operador

  • @David-yk9hm
    @David-yk9hm 2 ปีที่แล้ว

    Also they are supposed to remove all the electrical wiring and plumbing.

  • @normanhopkins6114
    @normanhopkins6114 6 หลายเดือนก่อน

    Must be a Government Time and Materials contract.

  • @sergiobetancurgutierrez2304
    @sergiobetancurgutierrez2304 2 ปีที่แล้ว

    Lamentablemente no se escuchan los sonidos al caer los escombros, solamente se escucha el sonido de la máquina atomizadora de agua.

  • @kaywilliams5461
    @kaywilliams5461 2 ปีที่แล้ว

    I have never seen A Operator WAIST SOW MUCH TIME !

  • @_nelson
    @_nelson 2 ปีที่แล้ว +1

    This 1939 building material.
    Not use today
    Today Building materials totally different

    • @constructionwatcher5381
      @constructionwatcher5381 2 ปีที่แล้ว +2

      Actually, what you see in this video is much newer than 1939. The old parts of the building were shown in the earlier parts of this series.

  • @cmbk
    @cmbk ปีที่แล้ว

    Sad to see such recent and sturdy construction torn down just to make a quick buck!

  • @DirkSommerfeld
    @DirkSommerfeld ปีที่แล้ว

    Der Baggerfahrer sollte nochmal zur Schule gehen. Mir wurde mal erklärt das beim Abriß das Gebäude geschwächt wird bis es zusammenfällt

  • @clausb.2032
    @clausb.2032 2 ปีที่แล้ว +1

    immer noch keine neue zange!!

  • @clausb.2032
    @clausb.2032 2 ปีที่แล้ว

    ab eine stunde geht es aber fix..

  • @jimmydickson8854
    @jimmydickson8854 ปีที่แล้ว

    Just keep cutting beams mate the rest will follow time is money

  • @k.c.beagle7102
    @k.c.beagle7102 2 ปีที่แล้ว

    long reach operator needs to go back to school , never seen so much wasted moves, the man is confused

  • @kurthuck2630
    @kurthuck2630 2 ปีที่แล้ว

    I like watching these videos but some move at a snail’s pace!🐌🐌🐌🐌🐌🐌🐌

  • @transilvanischervampir666
    @transilvanischervampir666 ปีที่แล้ว

    Was spielt der darum? 🧐🫣

  • @gregcummins2529
    @gregcummins2529 ปีที่แล้ว

    This operator is ridiculously slow. In my country, if you took so much time to achieve so little, you'd be given the flick. Cut through the upright steel beams and let gravity do its thing. Total time waster!

  • @inescividanes2403
    @inescividanes2403 2 ปีที่แล้ว +1

    Eu já vi operador de maquina ruim , mas esse é pessimo. Ele tem que melhorar muito pra ficar ruim.

  • @mauriciomendieta6079
    @mauriciomendieta6079 2 ปีที่แล้ว

    Que operador tan malo.

  • @gigi6595
    @gigi6595 2 ปีที่แล้ว

    Operatore troppo lento e macchinoso.gioca soltanto!