Installation Of 4-Point Mounting System | GreenTec Spider and Scorpion 6 & 8 series

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 ต.ค. 2024
  • Installation of 4-point mounting system for the GreenTec Spider and Scorpion 6 & 8 series:
    1. Drive the tractor towards the machine
    2. Connect both lift arms
    3. The Scharmüller frame is fitted to the tractor
    4. Mounted in the top link attachment or K80
    5. The PTO shaft and Danfoss joystick are installed
    6. Lower stabilization is mounted to the tractor
    7. Connect it to the drawbar or K80
    8. 4-point mounting is done and 100% stable

ความคิดเห็น •