Derailed locomotive gets lifted onto the rails

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ม.ค. 2025

ความคิดเห็น • 44

  • @JustinSpencerRailVideos
    @JustinSpencerRailVideos 12 ปีที่แล้ว +1

    It was a mix of our crews and IC&E crews, plus the contractors that lifted the motor back on to the tracks. We weren't there very long though.

  • @JustinSpencerRailVideos
    @JustinSpencerRailVideos 12 ปีที่แล้ว +2

    Wow i was unaware of anyone filming that day, i was down there working that one at some point that day.

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    As stated in the description, this is at Ottumwa, Iowa.

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    I doubt it. You can see them picking up what they drove the treads over next to the rail around the 8:00 minute mark. Hulcher wouldn't be be called on as much as they are if their sidebooms tore up the track each time.

  • @okzoia
    @okzoia 11 ปีที่แล้ว +2

    Good job filming!

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    Yes. I remember he came to speak to our class once in Middle School.

  • @shayengineer10
    @shayengineer10 10 ปีที่แล้ว +4

    Where's Radar O'Reilly's house from there?

    • @karo55ronny
      @karo55ronny 7 ปีที่แล้ว

      shayengineer10

    • @48retrop
      @48retrop 5 ปีที่แล้ว +1

      I talked to Radar a few minutes before the derail. He said he called the yard and told them to get ready, but they just laughed at him.

  • @TrainzSpotter
    @TrainzSpotter 5 ปีที่แล้ว

    What would be reason that derailed Locomotives..?? Over speed..or.. tracks..??

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    Thank you.

  • @milkman6478
    @milkman6478 11 ปีที่แล้ว

    The Backhoe at 10:20 has BNSF written on the loader arm

  • @ATrainVideo
    @ATrainVideo  12 ปีที่แล้ว

    Wow, so they called in BNSF crews for this?

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    The Iowa, Chicago, & Eastern Railroad.

  • @bettyboop65340
    @bettyboop65340 11 ปีที่แล้ว

    where is this

  • @haroldsmith8698
    @haroldsmith8698 8 ปีที่แล้ว +1

    YOU CAN LOOK AT THE ENGINE SEE WHAT RAIL ROAD COMPANY IT BELONGS TO. IT IS N'T MUCH OF A WONDER THERE WHY THERE IS A DERAILMENT. THE TES ARE THERE TO HOLD THE RAILS WITH IN THE 4 FOOT 11 WHEN THE TIES ARE ROTTEN SPLIT THEY DON'T MUCH OF A JOB.. THIS HAS TO BE PAID FOR SOME WAY.

  • @ATrainVideo
    @ATrainVideo  11 ปีที่แล้ว

    An SD40-2 locomotives weighs 368,000 pounds.

    • @CosgroveNotts
      @CosgroveNotts 4 ปีที่แล้ว

      Pounds sounds bigger than tons

  • @frostgfx
    @frostgfx 7 ปีที่แล้ว

    That's some great job security if it takes 25 people to rerail a locomotive... Whatever happened to using hydraulic jacks. There are some neat machines that will lift the loco, move it over to the tracks and set it down... I guess the unions voted against that purchase. This reminds me just how bad PanAm Railways is... and how they keep having derailments in the yard throat in E Deerfield, MA.
    Just how much give does a train have before it rolls off the tracks? 4' 8" (+/-)???

  • @woodcutterdude
    @woodcutterdude 11 ปีที่แล้ว

    Attumwa, Iowa? That's where Radar O'Riley's from. You know, "MASH"

  • @robertgift
    @robertgift 12 ปีที่แล้ว +1

    Could not get closer or video from the side?
    Cause?

  • @ziobrik
    @ziobrik 11 ปีที่แล้ว

    ...alias "how to wreck a quarter mile of yard". Those pipelayers shouldn't be supposed to work over rails... cat 594, right?

    • @dahliathor4307
      @dahliathor4307 8 ปีที่แล้ว

      ziobrik 593 cat they don't tear up rail because of the rubber and polyurethane pads between the grouzers

    • @saddletramp1860
      @saddletramp1860 3 ปีที่แล้ว

      583

  • @gravelydon7072
    @gravelydon7072 9 ปีที่แล้ว

    Demote the sideboom operator on the left. Keep the one on the right. You never "two block" a cable setup and the left side one did.

    • @dahliathor4307
      @dahliathor4307 8 ปีที่แล้ว +1

      gravelydon we keep them tight to each other so they don't swing into the loco

    • @dtbanks42
      @dtbanks42 4 ปีที่แล้ว +1

      You do not have a two-block system call friction side boom cat 583.

    • @dtbanks42
      @dtbanks42 4 ปีที่แล้ว +1

      I should know cuz I work for hulcher for 5 years

  • @CosgroveNotts
    @CosgroveNotts 4 ปีที่แล้ว

    Do you have rail maintenance in Murica? Seems to be a common problem...

  • @garybulwinkle82
    @garybulwinkle82 5 ปีที่แล้ว

    Wow, ten guys, and only one guy's workin'........must be a union job!!!!

    • @rtp3962
      @rtp3962 4 ปีที่แล้ว

      Fy

    • @dtbanks42
      @dtbanks42 4 ปีที่แล้ว

      Nope

    • @tomcander3669
      @tomcander3669 2 ปีที่แล้ว

      Everyone on the Hulcher crew have a job...and that's what they do

  • @nonickname9930
    @nonickname9930 8 ปีที่แล้ว

    Harold Smith, if he try to run on 4 foot 11 inch gage, ye'll wreck pretty well every time. 56 1/2 inches is standard gage, 59 inches aint even good enough for yard tracks. Better brush up on FRA standards.

    • @mytfy1
      @mytfy1 8 ปีที่แล้ว

      if there is a yard that has 59" gage anywhere within that yard then derailments must be an everyday occurrence.

    • @nonickname9930
      @nonickname9930 8 ปีที่แล้ว

      +fermin benedetti Yeah fermin, the yards I worked in were 10mph on all tracks. CSX takes a track out of service for 58 inch gage. I ain't got a clue where Mr Smith came up with 59 inches. Little or no knowledge, like that, about railroads, is what feeds the news media to produce horror stories about railroads being detrimental to the safety of this country.

    • @mytfy1
      @mytfy1 8 ปีที่แล้ว

      Nonickname Where I worked the maximum allowable gage for class 1 track was (and i'm sure still is) 58". Any area of track that exceeded 58" upon discovery, was immediately repaired. Don't forget, the railroad industry is the "Backbone" of our country. If for some reason all RRs shut down today, our Nation would be starving in 2 weeks (i'm being generous) time. Cheers.

  • @bettyboop65340
    @bettyboop65340 11 ปีที่แล้ว

    who is ice?

  • @kikazz74
    @kikazz74 11 ปีที่แล้ว

    that is where my dad works it is now CP

  • @optimuscprime
    @optimuscprime 7 ปีที่แล้ว

    Yeah. an sd-40-2 being derailed is not a good thing.

  • @haroldsmith8698
    @haroldsmith8698 8 ปีที่แล้ว

    WHAT THEY NEED IS THE BIG HOOK LIKE THEY HAVE IN CANADA. THEY JUST BACK IT UP AND DOWN WITH THE HOOK AND

  • @sergiofrigo4054
    @sergiofrigo4054 11 ปีที่แล้ว

    2 caterpillar 594 poseurs de pipe line remettent une loco sur les rails

  • @pennywise1281
    @pennywise1281 6 ปีที่แล้ว

    Load trucks

  • @danielg.kellar1617
    @danielg.kellar1617 ปีที่แล้ว

    Amateurs