Foundation Techniques_1BHK Building Rcc Column Footing Reinforcement|Rcc Column Foundation
ฝัง
- เผยแพร่เมื่อ 18 ม.ค. 2022
- This video content by,
Column Footing Reinforcement _1BHK building Rcc Footing Reinforcement on perfect work|Foundation Techniques/Basement Construction/Column Reinforcement
all about Construction works granite works tiles works plastering works bricklaying works all elevation works all construction tips and tricks all to my Chanel keeping your support friends
SUBSCRIBE 🛎 ; / @sumiconstruction
Any,
like
share
comment
on this video
#footing
#foundation
#column
#rcc
#reinforcement
#1bhk
#house
***************************************
Thanking you all 🙏 - วิทยาศาสตร์และเทคโนโลยี
Its wrong construction procedure, bricks are not acceptable for the columns shuttering there is no strength in columns, curing will not sufficient for columns so its not acceptable the work...
Excelente trabajo en equipo 👏 👍 saludos y que dios los bendiga y acompañe siempre 🙏 👍
Nice video
Good mantap👍👍🙏🇮🇩
great Congratulation Everyone
Rong dcisen
Ap pune maharstra me construction kar sakte ho kya?
very good word
Super bhai
Super
Pura galat kam
This 12mm bar?
It's worng construction plan
very true...boukder must be
Kachda😂
Waste of money it may be danger of human life also
12 mm road strong irukuma
S bro
Not properly done BCC
why wrong?
Not curing and packing
THIS is Wrong Technic .
It's very wrong construction. Because, please refer the following below,
1. Concrete pouring height should be maximum of 1.00 m only. In this video, it greater than that
2. PCC work must be done before footing is laid, which affects the settlement of the building after some years based on the soil conditions.
3. Line, plumb and level must be done before footing is done which leads to change in alignment of the columns.
4. Vibration or compaction must be done for concrete works in order to reduce the voids and segregation, honey combing in concrete .
5. Eccentric footing and Normal footing must be aligned or position as per the engineer standards.
6. Shuttering must be done for Column works.
7. Curing must be done properly.
8. Colums must have a minimum rod size of = >12mm only.