Current work update from Tunnel T4 to Dehar village @ Kiratpur- Nerchowk four lane project.

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 ก.พ. 2025

ความคิดเห็น • 86

  • @ursengineerdost7639
    @ursengineerdost7639  ปีที่แล้ว +2

    Plzzz subscribe my channel for such videos

  • @kamleshsharma408
    @kamleshsharma408 ปีที่แล้ว +2

    Good informative video, I like it. I often use this road from Panjperi to Jarol twice in a month, T4 and T5 tunnel should be open quickly for public so that jurney could be easily to their destination. Thanks a lot for this video.

  • @Joginder-ey1jk
    @Joginder-ey1jk ปีที่แล้ว +1

    Nice work

  • @shanu338
    @shanu338 ปีที่แล้ว +1

    Sabse achi videos aur information aap hi dete ho❤

  • @davindersharma9635
    @davindersharma9635 ปีที่แล้ว +1

    Thanks for sharing latest video.

  • @rameshchauhan5373
    @rameshchauhan5373 ปีที่แล้ว +1

    Thanks Nice

  • @deepakraj2400
    @deepakraj2400 ปีที่แล้ว +1

    Good update.. Keep it up sir.

  • @HarishKumar-jh4mj
    @HarishKumar-jh4mj ปีที่แล้ว +1

    You always very good👍

  • @rkdhiman1962
    @rkdhiman1962 ปีที่แล้ว +1

    Bahut badhiya

  • @kapilsharma-fm2zo
    @kapilsharma-fm2zo ปีที่แล้ว +1

    Bahut badia 👏👏

  • @rahulkapil653
    @rahulkapil653 ปีที่แล้ว +1

    Please upload latest video kenchimod to jagatkhana.

  • @amarveersaini6332
    @amarveersaini6332 ปีที่แล้ว +2

    Next video ?

  • @sonujapan3786
    @sonujapan3786 ปีที่แล้ว +1

    bhai 7 din ho Gaye, koi new update video post karo.

  • @santoshchauhan662
    @santoshchauhan662 ปีที่แล้ว +1

    good update,

  • @pratapsharma4008
    @pratapsharma4008 ปีที่แล้ว +1

    Thank u so much for this information bhai bas ek vedio aur bana do jaha se traffic chalu है map me bhi dikhae

  • @RAJA8990
    @RAJA8990 ปีที่แล้ว +1

    Sir if possible please give update thapna tunnel

  • @Rajivsharma-dx4mt
    @Rajivsharma-dx4mt ปีที่แล้ว +1

    I am going to visit Manali in 1st week of April 2023. Please suggest me the four lane route. Thanks

  • @NavrajRajLostSouls
    @NavrajRajLostSouls ปีที่แล้ว +2

    Bhai full road ko abhi 3 month lag jayega.

  • @himachalimunda4267
    @himachalimunda4267 ปีที่แล้ว +1

    Sir barmana bridge kb joint hoga

  • @SamSen-um8tc
    @SamSen-um8tc ปีที่แล้ว +1

    Mandi to kiratpur will be 84kms I guess?

  • @praveenanand4591
    @praveenanand4591 ปีที่แล้ว +1

    Aapne kuch months pehle Jo drone video banayi thi total project ki that was simply superb please make that video again with latest progress and please add your commentry in that ,last time it was silent

  • @bantythakur100
    @bantythakur100 ปีที่แล้ว +1

    Soil stabilization k liye side wall proper kyo nhi karte. Just want to know. Because baris me yhi se landslide sru honge

  • @niksmanali
    @niksmanali ปีที่แล้ว +1

    Sir in todays newspaper Amar Ujala news of inauguration has come 15 May 2023 by PM Modi/ Nitin Gadkari ji hoga

    • @ursengineerdost7639
      @ursengineerdost7639  ปีที่แล้ว +1

      Koshish to poori kr rhe h bhai , baaki thoda bahut late ho sakta h

  • @prakashchand7761
    @prakashchand7761 ปีที่แล้ว +1

    कैंची मोड़ से नेरचौक रोड का उद्घाटन कब होगा

  • @sunhighlander3465
    @sunhighlander3465 ปีที่แล้ว +1

    Mandi to ropar ka total stretch kab Tak full operational ho jayega

  • @sonujapan3786
    @sonujapan3786 ปีที่แล้ว +1

    kab tak yeh tunnel traffic ke liye khol di jayegi?

  • @Rathour0102
    @Rathour0102 ปีที่แล้ว +1

    Thank u for the update....ye rock cutting mein approx kitna tym lagega?

  • @praveenanand4591
    @praveenanand4591 ปีที่แล้ว +1

    I eagerly await your videos,you give quite elaborate knowledge of route and tunnels progress,i have a question for u,if I am correct there are 5 tunnels in this project so after 5 th tunnel will be reach pandoh and will it bypass Mandi and bilaspur ,i have a confusion regarding total route from kiratpur to Manali when going through these 5 tunnels ,could u please explain me the route

    • @ursengineerdost7639
      @ursengineerdost7639  ปีที่แล้ว +1

      Thank you brother, yes there are 5 Tunnels in this project.
      This four lane will provide connectivity from kainchi mod to Nerchowk via Jagatkhana,Bharari,bhaged and dehar
      This route bypass Bilaspur
      If you want to go Bilaspur,you have to go from Bharari or from bhaged

    • @niksmanali
      @niksmanali ปีที่แล้ว +1

      @PraveenAnand - Mandi bypass doesn't fall under this part .. wo alag package me chala hai kaam
      1 ) Kiratpur - SunderNagar bypass - Nerchowk .... 2) Nerchowk - Mandi Bypass ( 2 Tunnels) - Pandoh ... 3) Pandoh - Takoli ... 4) Takoli - Kullu .... 5) Kullu - Manali

    • @praveenanand4591
      @praveenanand4591 ปีที่แล้ว

      @@niksmanali Thanks very much bro ,but i need a further information
      1.After we move out from tunnel 5 of kiratpur - nerchowk project we will move to Mandi bypass road ,is that part completed and are there any tunnels in this section and their status?
      2.There was a news sometime back that 5 tunnels of pandoh section will be opened shortly,have these tunnels opened and from when you expect the kiratpur - nerchowk section to opened, pls reply

    • @niksmanali
      @niksmanali ปีที่แล้ว

      @@praveenanand4591 Mandi bypass is not ready as of now 2 Twin Tube Tunnels are there in that part .
      Pandoh - Aut tunnel status - 5 Tunnels /10 not opened as of now … company has planned to open it in the month of April .

    • @LearnerDotCom-YT
      @LearnerDotCom-YT ปีที่แล้ว +1

      ​@@niksmanali As we are traveling next week from Chandigarh to Mandi, is there any part of the new fourlane highway can be used to travel as of now by car?

  • @Incognito.5804
    @Incognito.5804 ปีที่แล้ว +2

    Harabaag to Bilaspur 15-20 din m open ho jana chahiye?

  • @imvikasgautam
    @imvikasgautam ปีที่แล้ว

    What will be the total distance from Kiratpur to Ner- chowk ??

    • @SamSen-um8tc
      @SamSen-um8tc ปีที่แล้ว

      Sundernagar to kiratpur 61km and nerchowk to kiratpur 74

    • @ursengineerdost7639
      @ursengineerdost7639  ปีที่แล้ว

      Approximately 76 km

    • @SamSen-um8tc
      @SamSen-um8tc ปีที่แล้ว

      @@ursengineerdost7639 me and mandi to chandigarh will be 163km sir?

    • @SamSen-um8tc
      @SamSen-um8tc ปีที่แล้ว +1

      I mean mandi to chandigarh

  • @MaanSingh-yf7di
    @MaanSingh-yf7di ปีที่แล้ว +1

    Sar kya Kiratpur wali tunnel ko chhodkar Baki Sabhi tunnel single tube hi hai

  • @SuperManaswin
    @SuperManaswin ปีที่แล้ว +1

    When will Jarol to Kainchi maur stretch be open for general public?

  • @omitpanwar7411
    @omitpanwar7411 ปีที่แล้ว +1

    Bahi ji tunnel 1 ka flyover to lagta hai ki within a month complete ho jaayega or tunnel 1 se tunnel 2 ka kaam kab tak complete ho sakta hai any idea bhai or uski bhi video laao agar possible ho to

  • @tarunrana9754
    @tarunrana9754 ปีที่แล้ว +1

    Project total length ???

  • @neelkamalgupta8299
    @neelkamalgupta8299 ปีที่แล้ว +1

    Sir ji Tunnel T3 ko public ke liye kab khole ge.

  • @tarunrana9754
    @tarunrana9754 ปีที่แล้ว +1

    Total tunnel???