underhand stoping / animation / stoping methods / metal mining

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ก.ย. 2024
  • in this video i've discussed about the STOPING method i.e. UNDERHAND STOPING method with interactive animation in metal mine.
    HOPE THIS VIDEO WILL BE HELPFUL TO YOU!!!
    credit to our prestigious dignity - Prof. Neeraj Yadav
    #MININGMAFIA #STOPINGMETHOD #UNDERHANDSTOPING
    terminology of ug metal : • terminology | undergro...
    raising method in metal mine:
    - open raising : • OPEN RAISING METHOD / ...
    - two compartment : • two compartment method...
    - long hole drilling : • long hole drilling met...
    - alimak raising : • alimak raising method/...
    - raise borer : • RAISE BORER method/ani...
    stoping method:
    - overhand stoping : • overhand stoping / ani...
    - underhand stoping : • underhand stoping / an...
    - breast stoping : • Breast stoping / anima...
    - cut and fill stoping : • CUT & FILL stoping / a...
    Under hand stopping :
    WHEN THe underhand HOLES ARE USED FOR THE EXTRACTION OF STOPE, SUCH STOPE WORKING IS KNOWN AS UNDERHAND STOPING.
    THE HOLES IS MADE IN THE ORE BODY JUST BELOW FOOT. THE HOLE DRILLED IN DOWNWARD DIRECTION.
    It is used in working thin steeply dipping
    veins enclosed in strong wall rocks. In an underhand stope the face
    is below the driller who is supported partly by footwall. The stope is
    worked in a downward direction from upper main level to the lower
    main level commencing from a winze. A horizontal slice 2 to 2.5m
    high is started on top of an ore block. The ore is broken in horizontal
    slices. Miners stand on the steps formed and drill the shot holes
    downwards. It is a common practice to open new chutes as the
    stope is extended along the strike. Underground stopping is
    practiced relatively rarely. The transport of ore is somewhat difficult
    and blasting efficiency is poor as the blast has to lift the ore that is
    blasted. Ventilation is also not simple. Efficiency of miners in
    breaking the ore is however high.
    applicability:
    - ore body required strong
    - both hangwall and footwall should be storng
    - inclination - 45 to 85 deg
    - thickness is selected upto - 1.5m
    STOPE Preparation :
    - Started from last block near the boundary
    - lower level is prepared as haulage level
    - the arrangement of ventilation, additional manpower , additional handling of production and supply of material for safe working are made.
    - the ore block are divided into two halves by driving central raise/ winze in the ore body
    - the raise will be connect the lower level with upper level and the ore block will be ready for stoping operation after providing loading chute in central raise to load in lower level.
    STOPE Development :
    1. The ore body is approached from the shaft, inclines or adits.
    2. The ore body is further approached by cross-cuts, set regular
    interval (60-150m) from shaft and inclines.
    3. When cross-cut touch the ore body, the ore body is developed
    by driving the levels.
    4. These levels are inter connected at regular intervals, by raise
    or winzes.
    5. The raise and winzes are connecting the upper and lower level.
    6. When the development of two adjacent levels is complete the
    stopping operation is under taken.
    stope working:
    - block of ore divided into two halves
    - direction of excavation is downward
    - make heading from upper level to lower level
    - make benches by performing drilling & blasting
    - bench height - 1.5 to 2.5m
    - bench width - bench height
    - bench length - thickness of ore body
    - spacing - 1-2m,
    - burden - 1-2m
    - no. of holes - 2-5
    the stope is started from the upper level. the underhand benches are formed. the parameter of benches and shot hole given above. these holes are charged and blasted. the blasted ore is shoveled in the center raise. it act as a ore pass. the blasted ore is loaded in lower level through chute for further transport. the first bench is formed. the ladders are suspended from platform in the center raise and at both end of platform to lower the worker.
    ADVANTAGES:
    -WORKERS ARE STANDING ON STRONG AND SOLID ORE BODY.
    -THE MACHINES ARE KEPT ON ORE BODY.
    -DRILLING OPERATION IS EASY
    -FACES CAN BE WELL DRESSED
    -FACES ARE EASILY APPROACHABLE.
    DISADVANTAGES:
    -CENTER WINZE OR RAISE IS BLOCKED BY BROKEN ORE.
    -VENTILATION OF WORKING PLACE IS DIFFICULT
    -SHOVELLING IS REQUIRED FROM BENCH TO BENCH
    -LOWER BENCH IS COVERDED BY BROKEN ORE OF UPPER BENCH
    -IT IS NOT SUITABLE FOR LOWER INCLINATION AND WEAK ORE BODY OR --WEAK WALLS
    -BLASTING EFFICIENCY IS POOR
    VIDEO:
    title video - Video by KML from Pexels
    end video - Video by Gam Ol from Pexels
    OVERHAND STOPING, UNDERHAND STOPING, breast stoping, cut & fill stoping, shrinkage stoping, sub level caving, caving method of stoping, top slicing, stoping method, stoping method in metal mine, different types of stoping method, stope preparation, stope development, mining mafia, Mining Mafia,
    • underhand stoping / an...

ความคิดเห็น • 27

  • @Sanjay_Deolikar_Academy
    @Sanjay_Deolikar_Academy 3 ปีที่แล้ว +1

    The best explanation. H.O.D. Mining
    Kamptee Polytechnic, Nagpur Maharashtra.

    • @MININGMAFIA
      @MININGMAFIA  3 ปีที่แล้ว

      Thank you so much sir. ❤️

  • @rinkuchauhan906
    @rinkuchauhan906 4 ปีที่แล้ว +3

    sir make such videos on rest of the stoping methods.
    u r doing really great.

  • @NdeshiWay
    @NdeshiWay 3 ปีที่แล้ว +2

    Thank you for being such an amazing lecturer! I learn better here than in my lecture classes.

  • @omkaitade8758
    @omkaitade8758 3 ปีที่แล้ว +1

    u doing very well, keep it up sir

  • @kapilpatle2701
    @kapilpatle2701 2 ปีที่แล้ว +1

    Nice 😊👍

  • @engineeringscience1927
    @engineeringscience1927 3 ปีที่แล้ว +2

    Plz make video on shaft sinking in details

  • @r.kumarsahu538
    @r.kumarsahu538 4 ปีที่แล้ว

    Very use full👌👌

  • @basicminingbysharadsapkal2035
    @basicminingbysharadsapkal2035 ปีที่แล้ว

    Good animation

  • @devanshgohiya232
    @devanshgohiya232 ปีที่แล้ว

    Thanku so much sir plzzz aise hi hamara career banane me hamari madad kriye😊😊

  • @AnitaDevi-kt3sf
    @AnitaDevi-kt3sf 3 ปีที่แล้ว

    Very nice

  • @sudipkeora6761
    @sudipkeora6761 3 ปีที่แล้ว

    Thank you sir

  • @Mainakch04
    @Mainakch04 4 ปีที่แล้ว

    How will be the bottom portion of ore body be mined out since the bench width becomes narrow as mining goes down.

    • @MININGMAFIA
      @MININGMAFIA  4 ปีที่แล้ว

      Depend on thickness/width of the deposit. Subsequently blasting and widening goes simultaneously.

  • @surajshelke6556
    @surajshelke6556 3 ปีที่แล้ว

    VCR method pr video nikalo

  • @sandeepkumarsahu5866
    @sandeepkumarsahu5866 4 ปีที่แล้ว

    Ore body me level kese drive Krte hen is pr full video bnao sir please

    • @MININGMAFIA
      @MININGMAFIA  4 ปีที่แล้ว

      Contact us on @mining.mafia at instagram to get your queries resolved. Regards.

    • @sandeepkumarsahu5866
      @sandeepkumarsahu5866 4 ปีที่แล้ว

      @@MININGMAFIA instagram nhi chlata sir

    • @sandeepkumarsahu5866
      @sandeepkumarsahu5866 4 ปีที่แล้ว

      @@MININGMAFIA sub level stopping methods pr video bnaiye sir

  • @shaileshparoha4584
    @shaileshparoha4584 4 ปีที่แล้ว +1

    Sir if u have pdf of this book kindly provide plz

    • @MININGMAFIA
      @MININGMAFIA  4 ปีที่แล้ว

      Msg me on instagram. @mining.mafia

    • @shaileshparoha4584
      @shaileshparoha4584 4 ปีที่แล้ว

      @@MININGMAFIA sir!! kindly provide mail address plz .

  • @_rameyy_
    @_rameyy_ 3 ปีที่แล้ว

    Pls put in English caption sir

    • @MININGMAFIA
      @MININGMAFIA  3 ปีที่แล้ว +1

      Ok. Upcoming videos are in English. U may check description for notes

  • @zimlines6504
    @zimlines6504 8 หลายเดือนก่อน

    Learn English you guys