Thanks for watching, and good question. I can't speak for this particular crane and situation, but the video I linked here explains our process behind what rope we put on what crane. th-cam.com/video/7CEIYBLRdoo/w-d-xo.html
Would a new cable installation on an indoor Overhead Crane use a similar installation (after the removal of the old cable) as just described? May I "assume" an Overhead Crane would use "less" cable depending on the vertical distance from the floor to the Crane's Hoist overhead plus the number of Sheaves required? Does the Hoist's Drum have a Reserve Capacity?
Is there a good reason you are putting a different rope on the crane than what came off?
Thanks for watching, and good question. I can't speak for this particular crane and situation, but the video I linked here explains our process behind what rope we put on what crane.
th-cam.com/video/7CEIYBLRdoo/w-d-xo.html
Would a new cable installation on an indoor Overhead Crane use a similar installation (after the removal of the old cable) as just described? May I "assume" an Overhead Crane would use "less" cable depending on the vertical distance from the floor to the Crane's Hoist overhead plus the number of Sheaves required? Does the Hoist's Drum have a Reserve Capacity?
how can adjust the number of wire roll on the drum before wire full pull out?
I want to work with your for Latam. I am a instructor certified in movile crane and overhead crane.
❤❤❤🙏🙏🙏🙏👏👏👏
❤❤❤🙏🙏🙏🙏👏👏👏