    This is your shopping list in order of making the hive as shown in the video
    Buying the ZEST hive bits
    Your shopping list to build a ZEST hive is now as follows:-
    1. 1 of the 600x600 paving slab for the foundation.
    2. 4 of the 440x215x100 heavy weight concrete blocks. To raise the ZEST above the ground on the paving slab.
    3. 2 of the 1200x100x50 wood beams to support the ZEST floor.
    4. 2 pieces of 1220x660x6mm plywood to go under the floor and the roof blocks.
    5. 34 of the 440x215x100mm. light weight aerated concrete blocks.
    Cut 6 of them in half making 12 half blocks for use in the floor and roof.
    6. 1 ZEST carrier frame.
    7. 2 boxes of 12 forever boxes of ZEST plastic frames.
    8. 1 box of ZEST 2 queen excluders and 2 partitions.
    9. Another cavity batt to cut 2 pieces of partition insulation that match the ZEST internal profile.
    10. A 1200x450x50mm cavity batt to further insulate the roof blocks.
    Other items to be obtained are as follows, better found from scrap:-
    1. 1. A 1200x500 polythene cover sheet
    2. 2. A metal roof sheet to protect against rain.
    3. 3. 2 roof holding down ropes or straps
    Items 6,7 and 8 can be obtained from the ZEST on-line shop at www.thezesthiv...
    choose ‘THE ZEST PACK 1’ sufficient for a ZEST with 2 overwintering colonies or 1 summer colony.
    Building the ZEST hive.
    * A. Lay a 600x600 paving slab flat and level on the ground.
    * B. Lay 4# 440x215x100 concrete foundation blocks as shown so the long axis of the hive runs North/South
    * C. Place on the blocks 2# 1200x100x50 softwood beams.
    * D. Lay one of the 2 plywood sheets centred on the beams in both directions.
    * E. Lay the floor blocks on the plywood staggered as shown.
    * F. Assemble the ZEST carrier frame and lay it centralised in both direction on the floor blocks. Hold it down and score the floor blocks with a screwdriver at the inside edges. Set the carrier frame aside.
    * G. Build the first course of wall blocks at the scored line.
    * H. Build the second course of blocks staggered over the first course.
    * I. Lay the carrier frame back on top of the second course of blocks.
    * J. Place the ZEST queen excluders and partitions on the carrier frame and inside the zest volume. Ensure that the queen cannot pass them and are a good fit. Install the 2 cavity batts against the partitions, outside the colony space.
    * K. Put the remaining frames in thee ZEST.
    * L. Place the polythene cover sheet over the entire assembly.
    * M. Place the other plywood sheet centrally on top of the polythene cover sheet.
    * N. Lay the roof blocks on the plywood staggered as the floor.
    * O. Lay the cavity batt centrally on the block roof to give even better insulation
    * P. Lay a metal flexible waterproof sheet over the entire assembly and use 2 straps to hold it down under stress at each end.
    * Q. Set the bee openings in the carrier frame. Adjust to suit the seasons and the pests.
    *