815 Pine Full Deck Cycle Time Lapse - Seattle, Washington

แชร์
ฝัง
  • เผยแพร่เมื่อ 23 พ.ย. 2024

ความคิดเห็น • 36

  • @justycrusty
    @justycrusty 6 ปีที่แล้ว +9

    Can’t believe how quickly you’re setting form work up on green slab for next lift. Organisation must be spot on. Well done 👍

    • @AwsomeVine
      @AwsomeVine 4 ปีที่แล้ว

      This small project and space easy work.

  • @Wsi-connect
    @Wsi-connect 10 ปีที่แล้ว +10

    Great time lapse video from our friends at Conco Commercial Concrete Contractors

    • @siyabongasibusiso3467
      @siyabongasibusiso3467 3 ปีที่แล้ว

      How big and thick are those columns 👍👌👍👍👍👍👍👍👍👍👍

  • @timwalcott3169
    @timwalcott3169 5 ปีที่แล้ว +3

    I used to love doing these placing boom jobs. From the decks to columns to core walls. Each and every pour was a exciting way to see the city and get new perspective of the real way to do professional construction with all the trades! I miss it now that I’m retired!

    • @rafflegiveaways
      @rafflegiveaways 3 ปีที่แล้ว

      I'm a placement boom operator loooonnnnggg hours great job delicious $$$$$ cheers to you pumper

  • @jacklaher5065
    @jacklaher5065 5 ปีที่แล้ว +4

    Quite the load being place on a PT deck before it is stressed. Must be special provisions in the specs.

  • @drewstrom75
    @drewstrom75 7 ปีที่แล้ว +1

    What I find most interesting is the placement (and replacement) and use (or lack of) of the porta-johns.

  • @ahmedkamal7738
    @ahmedkamal7738 3 ปีที่แล้ว

    Wonderful video great job

  • @jakedehnert7936
    @jakedehnert7936 10 ปีที่แล้ว +5

    Let's not forget a pat on the back to the plumbers at Stirrett Johnsen for helping pull that off.

  • @jamesrobinson1022
    @jamesrobinson1022 2 ปีที่แล้ว

    These guys need to come to Detroit on the Hudson site. They are taking forever compared to this. They just switched from steel to concrete about a month ago and barely went up 1 floor. There is two buildings but the shorter one is structurally topped out at 12 floors while the actual tower is going to be 49 floors. Ground was broken back in 2017 and they started with the old pit from the Original Hudson Department Store that at one point was one of the largest in the world.

  • @alkifxns
    @alkifxns 3 ปีที่แล้ว

    Incredible!!..

  • @souchakriya9979
    @souchakriya9979 ปีที่แล้ว

    Impressive. How about PT stressing? When will you do it?

  • @marlineharrold1937
    @marlineharrold1937 6 ปีที่แล้ว +1

    wonderful video.

  • @evanhanson1807
    @evanhanson1807 3 ปีที่แล้ว +1

    there are moments that you see before handrail was put up past the decking level where they really should be tied off. Have I been somewhere where I should have been tied off but wasnt, sure, but i have also never worked on a building this high up. lots of respect but we should be a little more active with safety.

  • @kurulusosman8727
    @kurulusosman8727 2 ปีที่แล้ว

    😍😍😍

  • @jeffreyloftus3617
    @jeffreyloftus3617 6 ปีที่แล้ว +1

    There seems to be a lack of rebar in the deck slab with the centres appearing to be over two foot !

    • @breakingrefractory5967
      @breakingrefractory5967 6 ปีที่แล้ว

      jeffrey loftus post tension slabs generally have less rebar

    • @timwalcott3169
      @timwalcott3169 5 ปีที่แล้ว

      jeffrey loftus that’s where post tension cables come in !

  • @alikhi7817
    @alikhi7817 4 ปีที่แล้ว

    I Adores this work

  • @Cdplayr69
    @Cdplayr69 8 ปีที่แล้ว

    wow very cool

  • @mattwind8259
    @mattwind8259 6 ปีที่แล้ว +2

    Great job, was as a set accelerator used for the mix on this project? What was this slab area?thickness?

    • @h1ph0pjunk1e
      @h1ph0pjunk1e 6 ปีที่แล้ว

      had to have set for sure or elese
      vertical cant get pourd after the slab

  • @angeloacosta9411
    @angeloacosta9411 4 ปีที่แล้ว

    Porta-john is on the floor below...

  • @seangreene64
    @seangreene64 5 ปีที่แล้ว +1

    That’s why these dam monstrosity are falling apart.

  • @sandip0sheta
    @sandip0sheta 8 ปีที่แล้ว

    best work

  • @susanaapolayo
    @susanaapolayo 4 ปีที่แล้ว

    bellaquera!

  • @pdemont8854
    @pdemont8854 4 ปีที่แล้ว

    I see the concrete pump. How is it loaded?

    • @pixelbender896
      @pixelbender896 4 ปีที่แล้ว

      It's a shaft boom loaded from the bottom

  • @MsALIE1015
    @MsALIE1015 10 ปีที่แล้ว

    What is PSR rail?

  • @SandipKumar-nd9fl
    @SandipKumar-nd9fl 6 ปีที่แล้ว +1

    concrete is good meterial for building construction

  • @fabientre2800
    @fabientre2800 2 ปีที่แล้ว

    Wouldn't precast columns be much more efficient?

  • @sahilturgut7561
    @sahilturgut7561 6 ปีที่แล้ว +1

    me opt con....Boom.. plac..

  • @balwantsingh690
    @balwantsingh690 6 ปีที่แล้ว

    g HGH tv

  • @susanaapolayo
    @susanaapolayo 4 ปีที่แล้ว

    bellaquera!

  • @susanaapolayo
    @susanaapolayo 4 ปีที่แล้ว

    bellaquera!