    In this video Mr Dilip will be explaining the approval cost, the procedure involved and documents required to get building plan approval in Chennai. He details explains the difference between various govt. approval bodies and procedures involved in it.
    Time stamp :
    00:14 Introduction
    01:20 Approval process for Corporation
    04:35 Approval process for Panchayat
    04:46 Difference between planning and building permit
    05:49 Planning permit procedure
    06:46 Building permit procedure
    07:10 Time taken for approval
    08:27 Cost advice slip for corporation
    09:34 Cost advice slip for Panchayat
    10:34 Summary of Building plan approval cost
    #buildingplanapprovalchargesintamilnadu #howtogetbuildingplanapprovalchennaicorporation #buildingplanapprovalfeesonlinepayment #howtoapplybuildingplanapprovalinchennai #buildingplanapprovalcostinchennai #howtogethouseplanapproval #whatarethedocumentsrequiredforbuildingplanapproval #buildingplanapproval #buildingplanapprovalrulesintamil #buildingplanapprovalfeescalculator #buildingplanapprovalvillagepanchayat #builderinchennai
    Contact HireandBuild at 7200472008 or visit www.hireandbuild.com to build the best quality house at the best price.
    For appointments call:
    7200472008/7200870088
    Office Address: No 87A, Nolambur phase-II, (Above Talon Studio), Mogappair West, Chennai - 60003

ความคิดเห็น • 455

  • @vinodkumar9420
    @vinodkumar9420 3 ปีที่แล้ว +11

    Amazing Video Bro ❤️

  • @MaraThamizhan
    @MaraThamizhan 3 ปีที่แล้ว +71

    All civil engineers, planners and builders should come together and voice for transparent processes that will provide approval without bribe/corruption and within a time frame. Without that no use of living in "independent" India.

    • @venkatesharun2c2
      @venkatesharun2c2 3 ปีที่แล้ว +6

      True sir.... All govt offices it's happening 😞 EB alone can take sir how much they asking bribe 🤦 even from common people...

    • @dinnasivamugam1885
      @dinnasivamugam1885 3 ปีที่แล้ว +1

      Exactly sir

    • @srivatsansubramanian9494
      @srivatsansubramanian9494 3 ปีที่แล้ว +5

      That is correct sir..eventhough registration process is introduced in online..still we have to bribe those officials..and hard earned money is going to these culprits.

    • @venkatvignesh106
      @venkatvignesh106 3 ปีที่แล้ว +1

      Hi sir I submitted the documents for approval in medavakkam area nearly it was more than 2 years before but every time they are saying documents missing second time submitted in February 2021 but still again they are telling documents missed again I don't know why these happen

    • @senthilkumar-ol4bx
      @senthilkumar-ol4bx 2 ปีที่แล้ว +2

      @@venkatvignesh106 Hi Mr. Venkat. It's so easy please give under table dealing with concern officer's and A. E,You will get second week with your missing document's with approved...

  • @venkatesanm3027
    @venkatesanm3027 3 ปีที่แล้ว +12

    Impressive. That escape moment from telling the truth about commission. Expecting a lot from your channel.

    • @johnm3938
      @johnm3938 3 ปีที่แล้ว +6

      Full corruption
      Without bribe no work will happen

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      @@johnm3938 exactly.

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      Yes. Without commission nothing will happen in tn govt

  • @hariharasudhannayar411
    @hariharasudhannayar411 3 ปีที่แล้ว +2

    Thanks Bro. Much Appreciated.

  • @ytsmcsmcm
    @ytsmcsmcm 2 ปีที่แล้ว +2

    truly amazing bro :)) Thanks

  • @giridharans6512
    @giridharans6512 3 ปีที่แล้ว +10

    There should be transparency in all process for general public, as per Govt norm they have already fixed the amount for all process, but due to under the table formalities good things is not happening... Without knowing the people's pain and their hard earning why we should pay extra amount... do they are not paying for there service government... This really unacceptable.. any how the topic Good 👍

    • @saleemkh42
      @saleemkh42 2 ปีที่แล้ว +1

      EVERY ONE TAKE PLEDGE NOT TO PAY ANY BRIBE,

    • @sakthipriya2826
      @sakthipriya2826 2 ปีที่แล้ว

      Exactly if everyone stops then only there will be an end ..

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      Yes. Those who are taking bribe never realise that this is going to be curse on them and their families. I gave bribe 12000/- for getting patta name transfer work to manimangalam vo two years back. After troubling me fir one year he did my job inspite of taking under table. Even today I pray God that he and his family should suffer. My stomach is burning. These corrupted people will not have peaceful life at the end of their living

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      @@saleemkh42 that is not practical

    • @Hireandbuild
      @Hireandbuild  6 หลายเดือนก่อน

      Thanks for Expressing your views👍..

  • @manoharana7364
    @manoharana7364 3 ปีที่แล้ว +24

    அரசு ஒப்புதல் இல்லாமல் வீடு கட்டகூடாது என்பது சட்டம் . சட்டப்படி ஒப்புதல் கொடுக்க லஞ்சம் எதற்காக
    .

    • @lokeshgnanasekar
      @lokeshgnanasekar 2 ปีที่แล้ว +3

      this is India not the US 🤣🤣🤣

    • @manoharana7364
      @manoharana7364 2 ปีที่แล้ว +3

      இந்தியாவில் லஞ்சம் கொடுத்தால்தான் காரியம் நடக்கும் என்பது எழுதப்படாத சட்டம்

    • @rahulkrish9840
      @rahulkrish9840 2 ปีที่แล้ว

      @@lokeshgnanasekar Everything can change

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      Lanjam kodutha thaan Vela nadakkuthu. This is Dravida model.

    • @umamaheswari604
      @umamaheswari604 ปีที่แล้ว

      @@rahulkrish9840 but tn people take bribe for voting and expect freebies. Nothing going to change unless people mentality change and stop voting corrupted politician

  • @venkatvenkat6274
    @venkatvenkat6274 2 ปีที่แล้ว +1

    Thank You SIR , Useful important Video - V.V.C

  • @NaveenKumar-zx2ml
    @NaveenKumar-zx2ml 3 ปีที่แล้ว +2

    Good information bro... keep going....all the best 👍

  • @arvilochanan
    @arvilochanan 3 ปีที่แล้ว +5

    Thanks a lot for a frank and detailed post..I have been watching your posts quite often ..the transparency with which you share the knowledge /info is commendable..keep up the good work ..wishing you all the very best..

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Thanks a lot for your kind words sir. Keep watching!

  • @Raja00727
    @Raja00727 3 ปีที่แล้ว +32

    Because of corruption u cannot say the exact amount?that’s what he is symbolically saying.All corrupted

    • @perfectgameraj
      @perfectgameraj 2 ปีที่แล้ว +2

      THEY ARE NOT CORRUPTED, ITS WE WHO CORRUPT THEM BECOZ OF OUR URGENCY.....DEVIATION... AND GREED.....

  • @drsmusic5328
    @drsmusic5328 ปีที่แล้ว

    Very helpful and detailed video info, Thanks so much brother.

  • @vishnuchandrasekar7204
    @vishnuchandrasekar7204 3 ปีที่แล้ว +1

    Very useful video .. thanks!

  • @deeparamesh1336
    @deeparamesh1336 3 ปีที่แล้ว +3

    As per your video G+2 may be 1000 sqft means 1 lak based on sqft multiple with 100 correct.

  • @kamalanahthanraarumugam4794
    @kamalanahthanraarumugam4794 3 ปีที่แล้ว +1

    Really interesting and informative. Thanks

  • @jrakeshbe
    @jrakeshbe 3 ปีที่แล้ว +2

    Very nice explanation... Great job.

  • @naveenkumarnaveen7022
    @naveenkumarnaveen7022 3 ปีที่แล้ว +1

    Thank you for the information sir.

  • @syedismail3253
    @syedismail3253 3 ปีที่แล้ว +3

    Matra sila Pala charges... 😃😃 Super bro

  • @muthu1292
    @muthu1292 3 ปีที่แล้ว +2

    Super sir.. yesterday only I asked you. Today got your video

  • @50rameshj
    @50rameshj 3 ปีที่แล้ว +1

    Excellent... Very informative

  • @chinnasamyramesh1520
    @chinnasamyramesh1520 3 ปีที่แล้ว +2

    Thanks for open talk

  • @gouthamd8458
    @gouthamd8458 ปีที่แล้ว

    Very very useful sir. Thank you

  • @thomaswalker8790
    @thomaswalker8790 2 ปีที่แล้ว

    Great! It's a real eye opener

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @athikesu8
    @athikesu8 ปีที่แล้ว +1

    Planning permit and building permit in panchayat will be given in the respective panchayat office Itself?

  • @jebassundar9433
    @jebassundar9433 3 ปีที่แล้ว +2

    ❤️ superb

  • @sabarikrishna5874
    @sabarikrishna5874 2 ปีที่แล้ว +1

    Nice explanation bro

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @umarbathusha9292
    @umarbathusha9292 3 ปีที่แล้ว +3

    Final dialog sema bro..

  • @rajaveerappa8418
    @rajaveerappa8418 3 ปีที่แล้ว +3

    super sir,

  • @jithucoffee
    @jithucoffee 3 ปีที่แล้ว +3

    I spent close to 2 lakhs for getting an approval.... Since we didn't wanted to pay they gave stop notice...

  • @divahartirumurthy2219
    @divahartirumurthy2219 3 ปีที่แล้ว +2

    Nicely explained

  • @adhithiyant2868
    @adhithiyant2868 3 ปีที่แล้ว +2

    Good work sir

  • @vijaysrinivasan6362
    @vijaysrinivasan6362 3 ปีที่แล้ว +2

    Good one Dilip. Remember we discussed this when we met you recently and we encouraged you to make a video on this topic :) Talk to you soon!

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Yes sir, got this idea after the discussion with you. Thanks to you :)

  • @dkjeeva
    @dkjeeva 3 ปีที่แล้ว +2

    Good info Bro

  • @subinraj4488
    @subinraj4488 3 ปีที่แล้ว +2

    Thanks bro

  • @saravanakumarkaruppusamygo9759
    @saravanakumarkaruppusamygo9759 ปีที่แล้ว

    நாங்கள் கோவையில் உள்ள எங்களுடைய கவர்மன்ட் ஹவுஸிங் போர்டு வீட்டை இடித்துவிட்டு கட்டவேண்டுமானால் என்னவெல்லாம் நடைமுறையை கடைபிடிக்கவேண்டும் என்பதை தெறிவிப்பீர்களா சகோ 🙏

  • @aravindm1285
    @aravindm1285 3 ปีที่แล้ว +1

    I have 2 queries..
    1)Can we get a building approval for a existing house
    2)What if the construction deviates the building plan..any ways to update the existing plan.

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว +1

      No, we cannot get approval for an existing building

  • @kannann7065
    @kannann7065 2 ปีที่แล้ว +1

    1.600( 20/33)சென்ட்டில் வீடு கட்ட பிளான் அப்ருவல் கிடைக்குமா???

  • @anbum930
    @anbum930 3 ปีที่แล้ว +2

    Hello Sir... Licensed Engineer (Plan Approval Engineer) Certificate apadi vanga vendam nu oru video upload panunga sir

    • @a.sahayaraj7398
      @a.sahayaraj7398 2 ปีที่แล้ว

      வாய்ப்பில்ல ராஜா

  • @gibinthomas8262
    @gibinthomas8262 2 ปีที่แล้ว

    Informative video sir🎉,sir I have small doubt I have 20*30 plot in korattur,is it is the same process for 600 sqft land also, some one says approval for 600 sqft land not available please reply thank you

  • @kannana1800
    @kannana1800 4 หลายเดือนก่อน +1

    Very nice

  • @KnowYourGamer
    @KnowYourGamer 2 ปีที่แล้ว +1

    How long is the approval valid? Can the validity be extended?

  • @sriveerapandiyaayyanarspor7891
    @sriveerapandiyaayyanarspor7891 3 ปีที่แล้ว +2

    Sir intha panyathu apply document kodunga PDF kodunga sir

  • @Enakkutherinchathu
    @Enakkutherinchathu 2 ปีที่แล้ว +1

    Nice video ,its not building approval its bribe approval

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Thanks for your suggestion.

  • @manikanthan4693
    @manikanthan4693 3 ปีที่แล้ว +1

    Sir!
    My house is located in Chennai Copn limit located abutting 65 ft road. Planning construct permissible level of floors with 3 bed room flats above the existing building which is 26 yrs old spreading 1357 sq. ft area. Pl advise the following:
    1. Whether you can inspect the bulds for verifying its structural strength.
    2. Whether construction above existing bulds is permisdble?
    3. How many floors will be allowed to construct.
    4. Whether construction will be undertaken by you. If so, cost of construction and materials & facilities will be provided.
    After hearing from you, I will come in contact for further discussion. Pl reply.

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Please contact us at 7200472008

  • @kudilagaminteriors-phiferm7390
    @kudilagaminteriors-phiferm7390 3 ปีที่แล้ว +3

    how to avoid lanjam or corruption in civil field? oru vdeo podunga sago.. It will be very useful to many of them..

    • @a.sahayaraj7398
      @a.sahayaraj7398 2 ปีที่แล้ว +1

      வாய்பில்ல ராஜா

  • @rajkumar-gv4vk
    @rajkumar-gv4vk ปีที่แล้ว

    மேற்கூரையை Acc sheet roof ஐ centring ஆக மாற்ற plan approval வாங்க வேண்டுமா? Sir

  • @Sikharanandjain
    @Sikharanandjain 2 ปีที่แล้ว

    It's decided
    U r going to build my dream house 🏠

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Glad to hear that. Thanks a lot for your support :)

  • @firegaming-ds6gf
    @firegaming-ds6gf 2 ปีที่แล้ว

    Thank you sir

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @raji3894
    @raji3894 2 ปีที่แล้ว +2

    Is corporation and CMDA approval both are same or different ??

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Different mam, it will vary based on the location

  • @afneenofficial7034
    @afneenofficial7034 2 ปีที่แล้ว +2

    #hireandbuild Nice Video, Are we allowed to build house without setback for 19.6*59 plot area, I am in Parivakkam Poonamalle. Can you suggest so that we can approach you later when we plan?

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว +1

      It can be checked after seeing the plot documents only sir

  • @pca051
    @pca051 3 ปีที่แล้ว +1

    Excellent video.
    In Perambur PaperMills Road how much road widening will happen sir. Pls guide me

  • @kannana1800
    @kannana1800 4 หลายเดือนก่อน +1

    Correct

  • @kumaravelbkumaravel1820
    @kumaravelbkumaravel1820 2 ปีที่แล้ว

    Super explanation

  • @bhuvanendar
    @bhuvanendar 3 ปีที่แล้ว +4

    Sir I have a plot in gerugambakkam back side of Porur ...plot size 20* 60 what is the set back for it .. as 20ft itself is very less how can avail 5ft

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      It can be checked after seeing the land documents only sir

  • @premalathaprema9019
    @premalathaprema9019 2 ปีที่แล้ว +1

    Sir 600 sqft from kattankulathur plan apruval vaanga mudiyuma.

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      It has to be checked in local approval office mam

  • @pvparthasarathy
    @pvparthasarathy 3 ปีที่แล้ว +2

    Highlight is 10.50. In document road cut charges and demolition fee iruku its just for approval or will they will demolish and cut road ?

  • @saranmdg3059
    @saranmdg3059 4 หลายเดือนก่อน

    Bro madavaram ula angaluku 600sqft edam eruku edam cmda apporved adula 400sqft ground floor kata apporved kudupangala please solunga bro

  • @anithab8002
    @anithab8002 2 ปีที่แล้ว +1

    If demand advice is provided.. Shall a builder can consider as a approval. Else after that how long they need to wait

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว +1

      Approval will be given in 1 week after the fees has been paid

  • @sureshv400
    @sureshv400 3 ปีที่แล้ว

    Thank you for the information
    In Village they say no need for approval
    The olden days houses no approval
    What is the best can be done.

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Now it's mandatory in cities sir.

  • @letchumanant5319
    @letchumanant5319 ปีที่แล้ว

    Bro na fresher.,2021 passout .na conceptual plan pothu kudhukalam nu idea irukku engineering license irundha ta panna mudhiyuma illa ippovum panalama

  • @mohamedkasim6613
    @mohamedkasim6613 ปีที่แล้ว

    Sir, 600 square feet home purpose building kum Approvals vanganuma sir.... Need explain sir ....

  • @mohammedazfar918
    @mohammedazfar918 2 ปีที่แล้ว

    @hireandbuild - is it mandatory land approvals are required for building/plan approval ?

  • @bobbytables1
    @bobbytables1 2 ปีที่แล้ว +3

    Dear Sir, I have a onroad property in Vandalur - Kelambakkam road, Kolappakkam, It comes under Nedumkundram Panchayat, Vandalur taluk. What kind of approval is required to do commercial construction?

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Construction approval is required, please contact the panchayat office

  • @mamanullahvlsi
    @mamanullahvlsi 3 ปีที่แล้ว +1

    I have a plan to construct a commercial building in Trichy City. Approval fee is same as Chennai Corporation or less? Kindly advise

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      We are not sure of Trichy sir as we are operational only in Chennai only

  • @blueskygreenland_by_sridevi
    @blueskygreenland_by_sridevi ปีที่แล้ว

    Thai patta illa ena pannurathu sir
    All documents is there without thaipatta

  • @vishnucharanrajan7194
    @vishnucharanrajan7194 2 ปีที่แล้ว

    Good informative video

  • @vijayakumarm9263
    @vijayakumarm9263 ปีที่แล้ว

    Nice video bro. Any restrictions of new construction near backwaters omr chennai

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Thank you sir.
      Please kindly contact the below number for
      more information.
      +91 7200472008 or visit www.hireandbuild.com

  • @HARRISHSB
    @HARRISHSB ปีที่แล้ว

    Corporation approval is only enough or cmda approval not required for re construction building

  • @manoharana7364
    @manoharana7364 3 ปีที่แล้ว +2

    சரியான தொகை சொல்லமுடியாது என்பது தவறு லஞ்சம் கொடுத்து சர்டிபிகேட் வாங்க முடியுமாயின் தொகை சொல்லமுடியுமா ?

    • @ushathirumurugan
      @ushathirumurugan 3 ปีที่แล้ว

      முடியாது!!!
      லஞ்சத்தின் அளவு(எளவு) மாறுபடும்!!!???😭

    • @manoharana7364
      @manoharana7364 2 ปีที่แล้ว

      லஞ்சம் லஞ்சம் லஞ்சம் ........ மனிதனின் நோயைக்கூட குணப்படுத்தலாம் லஞ்சத்தை ஒழிக்க முடியாது

  • @abdullahulk86
    @abdullahulk86 2 ปีที่แล้ว +2

    what to do for already constructed house on land received from slum clearance board. is it possible to get approval>

  • @saleemkh42
    @saleemkh42 2 ปีที่แล้ว +1

    Bro, you said front side 10 feet and other three sides 5 feet space to be left open, is there any building in any city is constructed in that manner. In cities buying a 600 sqft place is a herculion task for any ordinary person , how it possible to get approval for such plot.

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Apartments and most buildings which are being built inside city limits are built that ways sir.

  • @krishkris1
    @krishkris1 3 ปีที่แล้ว +1

    புதியதாக மாடி கட்ட வேண்டும் என்றால், 5 அடி விட வில்லை 2 அடி மட்டுமே விட பட்டு இருந்தால் என்ன நடைமுறை

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Approval has to be gotten before construction only

  • @bharathpr
    @bharathpr 2 ปีที่แล้ว +1

    For getting plan approval, should the land be empty..or old house is fine?

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Land should be empty sir

  • @sbmleo
    @sbmleo 2 ปีที่แล้ว

    Very useful

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @vinju431
    @vinju431 2 ปีที่แล้ว +2

    Hi sir, pls help me in finalizing the per square feet rate with contractor, as contractor has finalised for 2000/sqft, but now I want the home to be build with AAC and gypsum plastering inside my house, so how to bring down sq ft rate?

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      If they have experience in building with AAC blocks and gypsum plastering they will know the exact cost and reduce sir, if not they won't

  • @shivabalaji6139
    @shivabalaji6139 2 ปีที่แล้ว +1

    Sir as per approved plan is there is any building constructed. If we have to leave so much space on each side and front area can anyone construct

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Sorry sir, We can't understand your question.

  • @kumarankrishna9033
    @kumarankrishna9033 2 ปีที่แล้ว +1

    Respected sir,
    How to get CMDA approval and building plan for a patta land in Thiruninravur, Chennai

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Kindly contact the local approval office, they will check your document and update you

  • @ravicharans7733
    @ravicharans7733 3 ปีที่แล้ว +3

    Out standing presentation sir tq with santhosam vmnm9

  • @sathyabama2222
    @sathyabama2222 3 ปีที่แล้ว

    Very excellent

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @shankard7296
    @shankard7296 3 ปีที่แล้ว +5

    Sir, you have mentioned the Set Back requirement for Corporation limit plot approval, Can you please provide setback details for outside corporation limit like Madambakkam, medavakkam areas etc.,

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      It will vary based on your location sir, it can be decided at the time of planning after checking your documents only

    • @hariprasath6211
      @hariprasath6211 ปีที่แล้ว

      After tamilnadu combined rules 2019. that setback norms is same for all municipalities.corporation ,bdo in tamilnadu

  • @kishorekumar-ru6ub
    @kishorekumar-ru6ub 3 ปีที่แล้ว

    Can we buy pp plot realtor is telling after one year they can sale with the confirmation from CMDA, please advise

  • @rathinasamy751
    @rathinasamy751 2 ปีที่แล้ว +1

    Building plan approval yen chidambara takasiyama irukkuthu ithan mulam ethanai per payanadakirarkal arasangam
    Ithu kurithu kala thamatham thavirkuma

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Thanks for your suggestion.

  • @gokullub7798
    @gokullub7798 2 ปีที่แล้ว +1

    Approval benifit?

  • @suganthiramesh628
    @suganthiramesh628 2 ปีที่แล้ว +1

    Sir, 4 to 5 kitchen 40×60 approximately plan and building approval charges in corporation limits.

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      You can expect around 5-6 lakhs totally mam

  • @ranjithanbalagan
    @ranjithanbalagan 2 ปีที่แล้ว +2

    Process is hectic and too much of bribe ..shameless people working in corporation . They need to be arrested or if the state government is having guts and if they are really concerned on the people.and honest , outsource this process to private sector company with some contract agreement. We don't want any government staff for this process

    • @Hireandbuild
      @Hireandbuild  6 หลายเดือนก่อน

      Thanks for Expressing your views

  • @jawaharjn5436
    @jawaharjn5436 3 ปีที่แล้ว +1

    commercial shop 43*15 la shop construct panathuku evlo agum and which way of construction is best and economy?? plz tell us sir

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Please check the construction calculator tool here hireandbuild.com/construction-cost-calculator-free-online/

  • @mohannarasiman7017
    @mohannarasiman7017 3 ปีที่แล้ว +1

    Bro, plan Approval and building Approval are must for before construction?

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว +1

      Depends upon the location sir

  • @gvcaddandarts8058
    @gvcaddandarts8058 3 ปีที่แล้ว

    approval vangama namma building kattalama...???? example customers direct ah mason kita project kuduthu katti mudikuranga athukula approval theva padalaya

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว +2

      They are building in their own risk, if any issue arises they will have to face it.

  • @puvi5647
    @puvi5647 3 ปีที่แล้ว +1

    sir
    some city building like t nagar ,other area building like pothys,saravana store have don't set backs ,fsi? IS IT CORRECT?

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Maybe it's a continuous building area, so there is no need for setback

  • @jananiravindran8847
    @jananiravindran8847 2 ปีที่แล้ว

    Dileep sir .. i would like to know one thing.. we have a grama natham patta land. We are planning to build a house and going for bank loan. How can we get building approval ?

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      its about enquiry with nearest planning approval office.

  • @markjackson8219
    @markjackson8219 2 ปีที่แล้ว +1

    can we modify house plan which is within the approved Sqft after CMDA approval.

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Depends upon the project size and location sir

  • @hemamalini6433
    @hemamalini6433 3 ปีที่แล้ว +1

    Sir perambur vyasar nagar 1200sq feet veedu katta ground floor mattum 2bedroom, pooja room katta evaloo cost varum. 19ku 64.

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Please check our construction cost calculator hireandbuild.com/construction-cost-calculator-free-online/

  • @trr071
    @trr071 3 ปีที่แล้ว +1

    Bro, Cmda or dtct approval venama for building approval. Do patta is enough

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Building plan is required sir

  • @damodharankannan5801
    @damodharankannan5801 ปีที่แล้ว +1

    we understand

  • @venkatvenkat6274
    @venkatvenkat6274 2 ปีที่แล้ว +1

    how to draw On Line building plan , please explain sir , Thank You - V.V.C

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Sure sir, thanks for your suggestion

  • @get2fun490
    @get2fun490 3 ปีที่แล้ว +1

    Timing (duration)@ 7:16

  • @nithishkumar6706
    @nithishkumar6706 3 ปีที่แล้ว +1

    Sir epo again dtcp approval online registration open panuvaga

  • @s.r4090
    @s.r4090 2 ปีที่แล้ว

    Super nice Bro

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for your kind words :)

  • @gokullub7798
    @gokullub7798 2 ปีที่แล้ว

    What are the benifit for plan approval?

  • @jayalakshmip7962
    @jayalakshmip7962 3 ปีที่แล้ว +1

    Hello sir thirumullaivoyal area la building approval vanganumna evalo sir budget agum

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Depends upon the plan mam.