Construction contract /agreement format in tamil| Part-1|ஏமாறாமல் இருக்க இப்படி ஒப்பந்தம் செய்ங்க!

แชร์
ฝัง
  • เผยแพร่เมื่อ 19 ก.พ. 2021
  • Construction agreement format in tamil| ஏமாறாமல் இருக்க இப்படி ஒப்பந்தம் செய்ங்க! | Part-I
    Planning for new house construction? Make sure you make a construction agreement between you and the builder to get rid of any dispute. Check this video to know things you must include in the construction agreement.
    Agreement Soft Copy download here
    drive.google.com/file/d/1nmn8...
    Time stamp:
    0:14 Introduction
    2:29 Customer and contractor details
    2:56 Project cost details
    4:55 Project time details
    5:38 Project guarantee for builders
    6:34 Work completion plan
    Contact HireandBuild at 7200472008 or visit www.hireandbuild.com to build the best quality house at the best price with 15 years of construction warranty.
    #constructionagreementformatintamil #houseconstructiontips​​ #constructionagreementformat #constructionagreement​ #buildingcontractorsinchennai​ #architectsinchennai #buildingconstructionagreementformatintamil #buildingconstruction #howtodraftaconstructionagreement #constructionagreementdraft #buildingcontractors #buildersinchennai #chennaicontractors
    For appointments call:
    7200472008/7200870088
    Office Address: No 87A, Nolambur phase-II, (Above Talon Studio), Mogappair West, Chennai - 60003
  • แนวปฏิบัติและการใช้ชีวิต

ความคิดเห็น • 164

  • @vimalrajsesuraj6547
    @vimalrajsesuraj6547 3 ปีที่แล้ว +4

    Nice one sir viewing and understanding terms and conditions was very simple and clean

  • @venkatakrishnanr5285
    @venkatakrishnanr5285 24 วันที่ผ่านมา +1

    Ur service to the society regarding construction is very very useful. Pl continue ur good service

    • @Hireandbuild
      @Hireandbuild  19 วันที่ผ่านมา

      Thanks for your kind words and support

  • @UdayaKumar-ho3vm
    @UdayaKumar-ho3vm 3 ปีที่แล้ว +8

    வீடுகட்டுவோருக்கும்,கட்டுமானத்தொழில் செய்வோருக்கும் மிகுந்த பயனுள்ள தகவல்களைத் தவறாமல் காலமறிந்து தருகிறீர்கள்.மிக்க நன்றி.
    Agreement பற்றிய வழிகாட்டுதல் இதுவரை யாரும் இவ்வளவு விளக்கமாக தெரிவித்ததில்லை.
    மாதிரி அக்ரிமென்ட் காப்பியை டவுன்லோடு செய்யும் வசதி செய்தால் அனைவருக்கும் பயனுள்ளதாக இருக்கும்.நன்றி.

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Shared the actual link please check...
      drive.google.com/file/d/1nmn8PMiqtDg_jHROJvG8NfC00VBXwYbL/view?fbclid=IwAR0gbX8HBo3nU9UdHWlOKFfVM0hhcVDjlk5VPO_I_6Snw2cuJku8rfD9XcM
      நன்றி! 🙏

  • @dearvadivel
    @dearvadivel 3 ปีที่แล้ว +8

    நீங்கள் சொல்லும் தகவல்கள் பயனூள்ளதாக இருக்கிறது. வாழ்த்துக்கள் 👍

  • @pramod2592
    @pramod2592 3 ปีที่แล้ว +15

    Hello sir, explain the cost difference of using, red bricks, AAC blocks and other types of bricks, so how much price difference will be

  • @kandhans
    @kandhans 3 ปีที่แล้ว +4

    Good one. Hope part 2 will include more info like Brand names to be part of contract. Eg Tiles, Cement, Steel etc..

  • @venkatvenkat6274
    @venkatvenkat6274 2 ปีที่แล้ว

    Thank You SIR , Important Video - V.V.C

  • @cpsanthosh
    @cpsanthosh 3 ปีที่แล้ว +1

    Very useful information

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thank you Stay tuned for more useful and informative videos...

  • @muthuraj.pandiyanmuthurajp7129
    @muthuraj.pandiyanmuthurajp7129 2 ปีที่แล้ว +1

    Thanks very much sir.

  • @PremKumar-kg5ep
    @PremKumar-kg5ep 2 ปีที่แล้ว

    Thanks for your great info

  • @KarthiKeyan-mw6zq
    @KarthiKeyan-mw6zq 6 หลายเดือนก่อน +1

    சூப்பர் சார் 👌🙏

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      நன்றி! 🙏

  • @muthusamyk5426
    @muthusamyk5426 8 หลายเดือนก่อน +3

    தாய்மொழி தமிழ் ஒப்பந்தம் தெரிய படுத்தவும்.எல்லோருக்கும்புரியும்.நான்கிராமத்தில்வீடுகட்டுவேன்.

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      உங்கள் கருத்துக்களை பதிவு செய்தமைக்கு நன்றி...

  • @sampathnarayanan7190
    @sampathnarayanan7190 3 ปีที่แล้ว +1

    Good work 👍👍

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thank you for your constant support 👍🤝..Stay tuned for more useful and informative videos...

  • @deepancivil5883
    @deepancivil5883 3 ปีที่แล้ว +1

    Super sir....

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thank you👍

  • @anandhakumar683
    @anandhakumar683 2 ปีที่แล้ว

    Very useful!!!!!!

  • @Natgrid02
    @Natgrid02 3 ปีที่แล้ว

    dileep videos are always useful

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      We are very glad to hear that. Thanks a lot for your support :)

  • @sakthicon
    @sakthicon 2 ปีที่แล้ว

    Thank you sir

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @samuelcharles128
    @samuelcharles128 2 หลายเดือนก่อน

    Excellent video. Suppose if overall project period is 12 months, do you provide detailed activity schedule for 12 months.

  • @while_wolf_editers9891
    @while_wolf_editers9891 3 ปีที่แล้ว +1

    Super sir

  • @sivasridharan5857
    @sivasridharan5857 4 หลายเดือนก่อน +1

    Excellent

  • @MURALIKRISHTV
    @MURALIKRISHTV 3 ปีที่แล้ว +1

    Waiting g❤️👍

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      We are very glad to hear that. Thanks a lot for your support :)

  • @DJVicky126
    @DJVicky126 3 ปีที่แล้ว +1

    GOOD SIR

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thank you for your constant support 👍🤝Stay tuned for more exciting videos and updates...

  • @denswils5820
    @denswils5820 3 ปีที่แล้ว +1

    Sir cam you compare red brick construction cost vs interlock brick construction cost... Pros & cons...

  • @devapriyanalapparaigal5942
    @devapriyanalapparaigal5942 2 ปีที่แล้ว

    Thankyou sir 👍👍💐💐💐

  • @MURALIKRISHTV
    @MURALIKRISHTV 3 ปีที่แล้ว +1

    🔥🔥🔥🔥🔥👍

  • @punamalaimani7926
    @punamalaimani7926 3 ปีที่แล้ว +2

    Bro Thanks. Good job. But in Tamil show only letter. All people write and keep more than useful. Please help.

  • @rangasayee5183
    @rangasayee5183 3 ปีที่แล้ว +1

    👍

  • @annaalbuilders742
    @annaalbuilders742 3 ปีที่แล้ว +7

    Sir pile foundation பற்றி பேசுங்கள்

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thank you👍🤝

  • @dhanasekarank3651
    @dhanasekarank3651 3 ปีที่แล้ว

    I want to know ur fund flow management system and how to investors attract to invest the business please give me tips

  • @divyas1379
    @divyas1379 3 ปีที่แล้ว +6

    Sir i woukd like to know about setback rules while drawing plan for approval. Pls speak about it.

    • @haisasii
      @haisasii 2 ปีที่แล้ว

      5 ft in each direction. If road width is more than 45 ft, 10 ft set back

  • @tmhshop9721
    @tmhshop9721 2 ปีที่แล้ว

    Thanku

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @aravinds3270
    @aravinds3270 3 ปีที่แล้ว +1

    What is square feet cost of cement sheet house ( not concrete house)

  • @ariharank1
    @ariharank1 6 หลายเดือนก่อน +1

    Sir in this format mostly the builders interest is taken care.90% builders interest and 10% customers interest.

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Thanks for your suggestion, We will considered it..

  • @muralidharanpillai3986
    @muralidharanpillai3986 2 ปีที่แล้ว

    Super explanation brother Murali NEYVELI

  • @venkateshb1097
    @venkateshb1097 3 ปีที่แล้ว +1

    What is the min stamp value required and whether bond should be registered in registrar office?

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว +1

      It depends on your project value, project duration below 11 months registration is mandatory

  • @anbazhagan6858
    @anbazhagan6858 2 ปีที่แล้ว

    Bro construction owner land work stop pani vachurutha without reason Ena panrathu

  • @natchimuthu1
    @natchimuthu1 3 ปีที่แล้ว

    Hi do I need to pay stamp duty abd registration charges for all costs mentioned in the construction agreement? For example GST and corpus fund needs stamp duty?

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      If you are registering the construction agreement then registration charges might be there.

  • @sasikanth4652
    @sasikanth4652 3 ปีที่แล้ว +2

    Still waiting

  • @NishaSivasubramanian
    @NishaSivasubramanian 2 หลายเดือนก่อน +1

    Hello Sir, I am planning to build a house of 1000sqft area near vandalur. Contacted a builder, he is charging 2500rs/sqft that is exclusive of sump, water tank, compound wall, borewell etc. I felt it is higher than in market. how much do you charge per sqft for 1000sqft house with mediem quality material.

    • @Hireandbuild
      @Hireandbuild  2 หลายเดือนก่อน

      Please feel free to contact us at 72004 72008 or visit our website at hireandbuild.com for more information. We look forward to hearing from you soon

  • @ZakirHussain-mz8ms
    @ZakirHussain-mz8ms 3 ปีที่แล้ว

    Good video sir. Is it needed to register construction agreement in sub registrar?

  • @while_wolf_editers9891
    @while_wolf_editers9891 3 ปีที่แล้ว +1

    Hi sir

  • @sivaggaya6487
    @sivaggaya6487 ปีที่แล้ว

    Engineer ku matum supervising ku evlo charge ketpanga sir 1000sqt

  • @Antonyinit
    @Antonyinit 2 ปีที่แล้ว

    Sir load bearing and RCc framed pathi sollunga

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว +1

      Sure we will, thanks for your suggestion :)

  • @ananthianu4977
    @ananthianu4977 2 ปีที่แล้ว

    Labour need sir please help how to find

  • @perumal869
    @perumal869 3 ปีที่แล้ว +1

    Sir ,mep rate analysis podunga sir

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Sure! We will post it soon. Stay tuned for more updates and videos.

  • @jayalakshmig3980
    @jayalakshmig3980 6 หลายเดือนก่อน +1

    Sir nanga building contractor nanga house kadikoduthu 4 year aguthu avanga kodutha amount kadi koduthaci but ippo sevaru lighta pori poriya iruku nanga than freea sari panni tharanum avanga enga mela legal action edupangala pls tell me sir

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Its better to consult a lawyer ,it depends upon your agreement terms

  • @mkchannel1959
    @mkchannel1959 ปีที่แล้ว

    Do we need to get govt approvals before signing the document? Since agreement has advance amount.. only after receiving proper approvals we can get home loans. So is it right to get first approvals than signing first?
    Pls help

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Yes, we have to get approvals first and then pay advance.

  • @giridharan7917
    @giridharan7917 2 ปีที่แล้ว

    I have a doubt about ..living allowance are care by whom for labours... ..... There is option for giving room for labours at work area ..I mean at site ...

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Generally labours will be staying at the construction site itself sir.

  • @manjunathagroupsconstructi2611
    @manjunathagroupsconstructi2611 2 ปีที่แล้ว

    Sir costomer final stage payment kudukama .... Builder ah cheating pana epadi recovery pananum ..... possession avangale duplicate key ready panranga...

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      It has to be discussed initially and mentioned in the agreement itself sir

  • @venkatvignesh106
    @venkatvignesh106 ปีที่แล้ว

    Hi sir my builder cheated me sir I built 2394 square feet after plastering completion builder told that he will not continue the work he is saying if I ask to come and talk also he is not replying can I file complaint against him sir in police station

  • @devapriyanalapparaigal5942
    @devapriyanalapparaigal5942 2 ปีที่แล้ว

    Sir agreement example pdf ah kotuthingana use full ah irukum

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Kindly please download from hireandbuild facebook page

  • @malathypaulpandi7630
    @malathypaulpandi7630 2 ปีที่แล้ว

    Can you please provide the template of the agreement both in Tamil and english

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      We dont have template in tamil

  • @anbuviki9197
    @anbuviki9197 วันที่ผ่านมา

    Aggreement not available

  • @TROLLTAMILAN
    @TROLLTAMILAN 2 ปีที่แล้ว

    Sir nan en friend ku amount koduthen
    Enkitta agreement illa
    Google pay history and whats app chat iruku
    Thara mattenu sonna itha vechii keka midiuma sir

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Yes sir you can raise a complaint using that

  • @anithab8002
    @anithab8002 2 ปีที่แล้ว +1

    Sir, can you please let me know.. How payment division will be given to builder? On what stages..

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      It will vary for each project based on the work schedule mam

  • @3k1972
    @3k1972 3 ปีที่แล้ว +1

    Namaskaram, can u please share the agreement copy.

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Shared the actual link please check...
      drive.google.com/file/d/1nmn8PMiqtDg_jHROJvG8NfC00VBXwYbL/view?fbclid=IwAR0gbX8HBo3nU9UdHWlOKFfVM0hhcVDjlk5VPO_I_6Snw2cuJku8rfD9XcM

  • @mariappanmuttu3947
    @mariappanmuttu3947 3 ปีที่แล้ว +1

    In case material cost increase?

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Please check part-2 video

  • @maheshp3142
    @maheshp3142 2 ปีที่แล้ว

    Builders office open panna any certificate vagganuma please reply sir

  • @palanikarthicks5187
    @palanikarthicks5187 2 ปีที่แล้ว

    Bro can you post a video for Stamp duty and registration fee for house under construction. I have a doubt like whether its 2% or 11%. Can you please help on this..

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Registration fees is 11% sir

    • @palanikarthicks5187
      @palanikarthicks5187 ปีที่แล้ว

      @@Hireandbuild Ok 👍

    • @sushilshasuwath129
      @sushilshasuwath129 ปีที่แล้ว

      @@Hireandbuild 11% of the total building cost is the registration fee Sir? Is this not high?

  • @sureshv400
    @sureshv400 3 ปีที่แล้ว

    My contractor wrote in plain paper
    Village area
    I doubt whether in village side it is Practical

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Even in village side land registration is being done using stamp paper only, so it will be easily available. It's for the safety of customer as well as the contractor. If agreement is not proper it's a risk for both of them

    • @bodhisattva6308
      @bodhisattva6308 10 หลายเดือนก่อน

      Even verbal contract is legally valid but is weak under law. So more detailed your contract better for you.

  • @er.ungaljo2913
    @er.ungaljo2913 3 ปีที่แล้ว

    Bro I need your help ...labour contract per sqft evalo vaangalam...

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว +1

      Depends on your location. In Chennai current rate is around 360-450 depending upon the work

  • @krithikasri3719
    @krithikasri3719 2 ปีที่แล้ว

    How to prepare to low budget building.

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      If you can reduce your requirements you can build in low budget mam

  • @vigneshradhakrishna6548
    @vigneshradhakrishna6548 ปีที่แล้ว

    Already oru land la veedu katti vikraaanga... So sale agreement and construction agreement epdi podlaam.. Please advise.

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      To construct a house on your already-owned land, follow these steps:
      Have a valid Sale Agreement for the land.
      Create a Construction Agreement with the contractor.
      Gather necessary documents and permits.
      Follow the agreed payment schedule.
      Monitor the construction progress.
      Inspect and approve the completed work.
      Seek legal and regulatory guidance throughout the process.

  • @gladmohesh264
    @gladmohesh264 11 หลายเดือนก่อน

    can you please load a sample form which we can use it for our purpose,...thankyou

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Shared the actual link please check...
      drive.google.com/file/d/1nmn8PMiqtDg_jHROJvG8NfC00VBXwYbL/view?fbclid=IwAR0gbX8HBo3nU9UdHWlOKFfVM0hhcVDjlk5VPO_I_6Snw2cuJku8rfD9XcM

  • @anilmahendra5503
    @anilmahendra5503 3 ปีที่แล้ว +3

    Sir please share the soft copy

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Shared the actual link please check...
      drive.google.com/file/d/1nmn8PMiqtDg_jHROJvG8NfC00VBXwYbL/view?fbclid=IwAR0gbX8HBo3nU9UdHWlOKFfVM0hhcVDjlk5VPO_I_6Snw2cuJku8rfD9XcM

  • @venkymacmol3607
    @venkymacmol3607 ปีที่แล้ว

    Hi sir, kindly share any labour contract agreement format.

  • @saravanang6083
    @saravanang6083 3 ปีที่แล้ว

    Sir, Are u work in Trichy?...

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Sorry sir, we are operational only in Chennai as of now

  • @Sam_Dairy_Farm
    @Sam_Dairy_Farm 2 ปีที่แล้ว

    Hii bro, I am form perambalur. nan ippo abroad la irukan enaku ungalala oru home build panni thara mudiyuma, nan oru NRI apdinrathunala enaku EMI ku ungalala help panna mudiyuma? Because enaku EMI pathi ethum knowledge illa so...

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Please contact us at 7200472008

  • @knowunknowns2227
    @knowunknowns2227 2 ปีที่แล้ว

    Penalty amount how much we can put for monthly !

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Please kindly contact the below number for more information.
      +91 72004 72008
      hireandbuild.com/

  • @srinivaspr5300
    @srinivaspr5300 3 ปีที่แล้ว +1

    Do you construct at bengaluru

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      As of now, HireandBuild primarily operates in Chennai. However, we are constantly expanding our services and may consider undertaking projects outside Chennai in the future. Stay tuned for updates!

  • @parthiban158
    @parthiban158 2 ปีที่แล้ว

    Sir நான் ஒரு மேஸ்திரி மூலம் எங்கள் 300 sq feet வீடு கட்டும் பணியை கொடுத்தேன் .. ஆனால் டைல்ஸ் மைன் டோர் பிளெமிங் வேலை இன்னும் செய்து முடிக்கவில்லை எங்கள பணம் 200000 ரூபாய் அவரிடம் உள்ளது மூன்று மாதங்களாக இளுகடிகிரர் இதற்கு என்ன தீர்வு காண்பது..

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Before starting the project payment stages has to be mentioned clearly to avoid this kind of situation sir.

  • @sairabanualavudeen334
    @sairabanualavudeen334 3 ปีที่แล้ว

    Sir, sqf rate eppadi

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Please check our website www.hireandbuild.com

  • @MURALIKRISHTV
    @MURALIKRISHTV 3 ปีที่แล้ว +1

    Like

  • @parveshanwarbasha5695
    @parveshanwarbasha5695 ปีที่แล้ว

    Job vacancies erundha sollunga sir site engineer

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Site engineer positions are currently available. If you would like further information, kindly call the number below.
      8110022225

  • @prathibaganga7023
    @prathibaganga7023 ปีที่แล้ว

    Bro. I need labour contract agreement

  • @vidyaraju6954
    @vidyaraju6954 2 ปีที่แล้ว

    Sir ungalai late parthathu varuthama irruku analum oru chinna veedavathu neenga kati tharanum

  • @kamaln1981
    @kamaln1981 3 ปีที่แล้ว

    Bangalore service eruka

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Sorry sir, we are operational only in Chennai as of now

  • @mdeebak2677
    @mdeebak2677 ปีที่แล้ว

    Maduraila... Wrk.. Pannuveengala....

    • @Hireandbuild
      @Hireandbuild  ปีที่แล้ว

      Hello @M Deebak,
      No, Right now we are doing projects in Chennai only, but will in future other cities.

  • @rayannoor8972
    @rayannoor8972 2 ปีที่แล้ว

    Negalay house sale panregala

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      No sir, we are not selling house

  • @prabakars4757
    @prabakars4757 2 ปีที่แล้ว

    Sir.. what if there is no agreement made? It's almost 3 years still my builder not giving the house.. 95% of money given still ...I'm paying EMi for past 1 year. Help me plz

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว +1

      It will have to be amicably settled with the contractor sir so that you can save time

  • @anbazhagan6858
    @anbazhagan6858 2 ปีที่แล้ว

    Reply panuka

  • @vidyaraju6954
    @vidyaraju6954 2 ปีที่แล้ว

    Nermaya solrenga

    • @Hireandbuild
      @Hireandbuild  2 ปีที่แล้ว

      Thanks for supporting us :)

  • @krithikasri3719
    @krithikasri3719 2 ปีที่แล้ว

    Pls tell me

  • @anbazhagan6858
    @anbazhagan6858 2 ปีที่แล้ว

    Oru bulder Ena pananum

  • @seenuyadav3285
    @seenuyadav3285 ปีที่แล้ว +2

    Thank you sir

    • @Hireandbuild
      @Hireandbuild  5 หลายเดือนก่อน

      Welcome...Stay tuned for more exciting videos and updates.

  • @MURALIKRISHTV
    @MURALIKRISHTV 3 ปีที่แล้ว +1

    👍

  • @srinivaspr5300
    @srinivaspr5300 3 ปีที่แล้ว

    Do you construct at bengaluru

    • @Hireandbuild
      @Hireandbuild  3 ปีที่แล้ว

      Sorry sir, we are operational only in Chennai as of now

  • @ksknews-1925
    @ksknews-1925 2 ปีที่แล้ว

    Thanks sir