Tour of Cassell Coliseum at Virginia Tech

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 ก.ย. 2024
  • (featuring Dieselducy) See what makes the Cassell tick with this exclusive tour, brought to you by Dieselducy and thewildeeper! Features a few extra minutes of exploration at the beginning and conclusion of the official tour, not seen in Dieselducy's take!
    Coming soon-
    Tour of the VT football museum next door
    Individual videos of the elevators in this building
    More elevators from Blacksburg and Greensboro
    ...and much more!

ความคิดเห็น • 14

  • @elevatorsbyliftfilmer1247
    @elevatorsbyliftfilmer1247 2 ปีที่แล้ว +1

    0:12 That's called Pass and Extended doors. If the floor to floor height is not enough for regular biparting doors, the Pass and Extended is used where the lower panel on the upper floor passes in front of the upper panel on the lower floor. The extended is because of the upper panel being offset, meaning the trucking sill for the lower panel is wider than normal.

  • @stephenpizzini235
    @stephenpizzini235 2 ปีที่แล้ว +1

    Jeff, I think your cassell coliseum tour video is cool, please make another building tour video

  • @SamSitar
    @SamSitar 11 ปีที่แล้ว

    fun opening to this one. a elevator is the perfect for vertical transport. Cassell is a huge stadium. it keeps going and going. four elevators at Umass once had lights like the triangular exit sign.
    i might do this at Umass Amherst.

  • @twistedwhiskers8776
    @twistedwhiskers8776 ปีที่แล้ว

    Could you go back and get another tour after the renovation?

  • @thewildeeper
    @thewildeeper  12 ปีที่แล้ว +1

    Thank you! This was great fun.

  • @ElevatorsInternational
    @ElevatorsInternational 7 ปีที่แล้ว +1

    This facility is definitely very cool!

  • @jackx.cassway
    @jackx.cassway 3 ปีที่แล้ว

    I like Andrew's shirt with The Cat In The Hat on it.

  • @gianni1940
    @gianni1940 3 ปีที่แล้ว

    wow, the end of the video almost sounds like an airplane has parked up at Pueblas Hermanos Serdan international airport.

  • @mohddonaris
    @mohddonaris 8 ปีที่แล้ว +4

    floor not thick enough for the doors

  • @damonknuckles8570
    @damonknuckles8570 ปีที่แล้ว

    Damon

  • @edwardfelix4332
    @edwardfelix4332 3 ปีที่แล้ว

    Office buiding

  • @renak7046
    @renak7046 3 ปีที่แล้ว

    Rrrrr