    CAVITE-LAGUNA EXPRESSWAY (CALAX) PROJECT
    Project Description:
    The project is a 44.58 km. four (4)-lane closed-system tolled expressway connecting CAVITEX and SLEX. The project will start from the CAVITEX in Kawit, Cavite and end at the SLEX-Mamplasan Interchange in Biñan, Laguna. The project will have the following subsections:
    Project Subsections
    Length
    (km)
    1
    Cavitex Connection to Open Canal Interchange
    8.68
    2
    Open Canal Interchange to Governor’s Drive Interchange
    9.86
    3
    Governor’s Drive Interchange to Silang (Aguinaldo) Interchange
    8.64
    4
    Silang (Aguinaldo) Interchange to Silang East Interchange
    3.16
    5
    Silang East Interchange to Sta. Rosa-Tagaytay Interchange
    5.14
    6
    Sta. Rosa-Tagaytay Interchange to Laguna Boulevard Interchange
    2.34
    7
    Laguna Boulevard Interchange to Laguna Technopark Interchange
    3.30
    8
    Laguna Technopark Interchange to Mamplasan Toll Barrier
    3.46
    PPP Scheme: Build-Transfer-Operate
    -Private sector to finance, construct, operate and maintain the entire expressway.
    Concession Period: 35 years (including 5 years design and construction)
    Start of Concession Period: July 10, 2015 (TCA Signing Date)
    Right of Way:
    60 meters, except for Laguna Techno Park & Laguna Boulevard (40 meters), and Greenfield Development Corporation (50 meters).
    Interchanges:
    8 interchanges and 1 toll barrierr
    Bridges:
    3,575 meters inclusive of 444 meters of viaduct
    Project Objectives:
    This project aims to:
    · Support national development policy and provide efficient transport facilities for the Eco-zones in Cavite and Laguna.
    · Reduce traffic congestion particularly in Governor’s Drive, Aguinaldo Highway and Sta. Rosa-Tagaytay Road which are heavily congested.
    · Improve competitiveness of Region IV-A/CALABARZON as an investment destination.
    Project Benefits:
    At the end of construction, the project is expected to:
    Reduce travel time from CAVITEX (Kawit) to SLEX (Mamplasan Interchange in Biñan, Laguna) from 2 hours to 35 minutes (70% reduction).
    Project Concessionaire:
    MPCALA Holdings Inc.
    Project Cost:
    Activities
    Amount (Billion)
    Civil Works
    P 25.425
    Right-of-Way
    P 10.201
    Independent Consultant (50%)
    P 0.112
    Total
    P 35.738
    Project Status:
    Right-of-Way Acquisition (ROWA) accomplishment (actual site possession)
    Ø Laguna Side : 100.00%
    Ø Cavite Side : 66.77%
    Subsections 8, 7 and 6 (Sta. Rosa to Mamplasan) were partially opened to traffic on October 30, 2019.
    Toll Operation Permit (TOP) was issued last February 7, 2020 for Subsections 8, 7 and 6.
    Toll Operation Permit (TOP) was issued last June 18, 2021 for Subsection5

ความคิดเห็น • 11

  • @hazeladventure
    @hazeladventure 4 หลายเดือนก่อน +1

    Excellent Dear Very Nice video❤❤❤❤❤❤❤❤❤

    • @alexberuelavlog20
      @alexberuelavlog20  4 หลายเดือนก่อน

      Thank you for watching maam Hazel..

  • @ginnicah
    @ginnicah 4 หลายเดือนก่อน +1

    May bagong kalsada uli sir, dami ng mga short cut na daan at godbless always

  • @MelvinTVblog
    @MelvinTVblog 4 หลายเดือนก่อน +1

    Keep safe boss

  • @engr.von.projects
    @engr.von.projects 3 หลายเดือนก่อน +1

    Open Canal Interchange is at the left of the CALAX and the right is the Open Canal Toll Plaza nearer to Shell.

    • @alexberuelavlog20
      @alexberuelavlog20  3 หลายเดือนก่อน +1

      Thank you so much po Engnr. Von,thanks fot the info,,gud night po

  • @lhabonacion1299
    @lhabonacion1299 4 หลายเดือนก่อน +1

    Tama jan po interchange. Mapapansin nyo sa areal shot nasa left po poss8ble entry at 3xit sa tabi ng shell station. Gumawa po sila ng bridge jan gawa na. Ung nakikita nyong maliliit na poste sa allignment at para sa tulay, sa ilalim daan pa exit dugtong dun sa bridge na ginawa

    • @alexberuelavlog20
      @alexberuelavlog20  4 หลายเดือนก่อน

      Ayun salamat po idol Lhabo sa inyo pong info,obviously dyan na nga po yan sirkc ss dulo ng open canel saArnaldo hiway npakarami pong structure at kabahaya ndun saka malayo napo yun sa alignment sir,,salamat po ng marami..

    • @lhabonacion1299
      @lhabonacion1299 4 หลายเดือนก่อน

      Wla po interchange sa Arnaldo Open canal. Viaduct po ang calax dun sa ibabaw tatawid. Sa open canal po ang interchange jan po sa may Shell station katabi. Pagitan ng shell at tulay