    nice to see cant wait to come home and see this railway, I have pictures of a recovery train in the early 70's lifting track in this area. What a turn around. Good vids as always

  • @sanderdenouden7634
    @sanderdenouden7634 7 ปีที่แล้ว +2

    We laid 1296 meters of track a day, a full load each day

  • @trek520rider2
    @trek520rider2 3 ปีที่แล้ว

    How do they gett the curve in the track? Presumably the sections of track on the train are straight.

  • @robertgreen2288
    @robertgreen2288 8 ปีที่แล้ว

    What length of rail is laid in one hour? How far apart are the sleepers? I am amazed!

    • @WaverleyWanderer
      @WaverleyWanderer  8 ปีที่แล้ว

      They laid 1100metre of single track per day (ie a single shift). I think this is the quantity of rail held on each train. the sleeper were positioned in advance.