ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
Students there is a correction in this video..rate of Sludge deposition is 30l/h/yr not 30l/h/d
Ok ma'am
awesome voice aapki voice meri heart beat badh❤❤❤rhi hai
Thanku mam ❤ awesome vedio 😊
Nice lecture
thank you so much for this video.jai hind.
Best!
ma'am please keep on updating the playlist with your new videos of environmental engineering......❤
Sure...today I will upload 1 video
I love it..❤❤
Thank you so much mam ❤
What we should take if lpcd is not given
Thanks 😊
Thank mam
Plz solve some examples related to sludge digestion and imhoff tank too.
Soon you will get the same
Mam please suggest me a book for septic tank designing...
Thank u so much 🥲
0.8 is constant in every sum (step 1)
Yes..because sewage discharge is taken as 80% of water supply ...it's a fix relation
DP=1 yrSo DP=365 daysThen Sludge volume was supposed to be = 30 l/h/d * 200 h* 365 daysI couldn’t understand this
Oh ho dear...it's my mistake...it's should be 30l/h/yr
Students there is a correction in this video..rate of Sludge deposition is 30l/h/yr not 30l/h/d
Ok ma'am
awesome voice
aapki voice meri heart beat badh❤❤❤rhi hai
Thanku mam ❤ awesome vedio 😊
Nice lecture
thank you so much for this video.
jai hind.
Best!
ma'am please keep on updating the playlist with your new videos of environmental engineering......❤
Sure...today I will upload 1 video
I love it..❤❤
Thank you so much mam ❤
What we should take if lpcd is not given
Thanks 😊
Thank mam
Plz solve some examples related to sludge digestion and imhoff tank too.
Soon you will get the same
Mam please suggest me a book for septic tank designing...
Thank u so much 🥲
0.8 is constant in every sum (step 1)
Yes..because sewage discharge is taken as 80% of water supply ...it's a fix relation
DP=1 yr
So DP=365 days
Then Sludge volume was supposed to be = 30 l/h/d * 200 h* 365 days
I couldn’t understand this
Oh ho dear...it's my mistake...it's should be 30l/h/yr