Installing a Level Access Wetroom with Square Drain

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ก.ย. 2017
  • Roger Bisby from Skill Builder guides you through the installation of the Elements Wetrooms level access shower tray with a (click lock) square drain.
    ======PRODUCT INFO======
    LEVEL TRAY KIT - 9X9 CENTRE SQUARE DRAIN (EMKS-CE-0909): www.abacus-bathrooms.co.uk/#!...
    LEVEL TRAY KIT - 9X9 CORNER SQUARE DRAIN (EMKS-CO-0909): www.abacus-bathrooms.co.uk/#!...
    LEVEL TRAY KIT - 12X9 END SQUARE DRAIN (EMKS-EN-1209): www.abacus-bathrooms.co.uk/#!...

ความคิดเห็น • 25

  • @alexandrasavtchenko1962
    @alexandrasavtchenko1962 หลายเดือนก่อน

    Thank you so much for all your work!!!!!!!

  • @zakkrsmanovic265
    @zakkrsmanovic265 2 ปีที่แล้ว

    Very informative, no messing.

  • @samadams9347
    @samadams9347 4 ปีที่แล้ว

    brilliant - well explained.

  • @soapytowel1565
    @soapytowel1565 ปีที่แล้ว +2

    Hi Roger, as a keen DIY’er and a retired electrician, I’ve watched many of your videos relating to installing a level access shower. Your “mock-ups” are in absolutely perfect conditions but have you ever tried it in a 1970’s built house with tongue & groove floorboards (always were the enemy of electrician doing retires etc.) as I am presently “attempting”. It definitely is a different tin of worms from your videos!

    • @storegga
      @storegga 11 หลายเดือนก่อน

      I reckon (for what it's worth) Rogers seen it all and climbed every greasy rung of the ladder so we don't have to. If you haven't already, it's worth watching his recent bathroom and shower room series. I find his knowledge in all aspects is second to none, let alone the trades he's experienced with.
      Hope you get that job under the TG floor sorted right, someone's got to do it, sorry it's you but probably better someone that cares like yourself.
      Ours is an 1800s build with similar, the old hand cast nails etc.

  • @johnsullivan395
    @johnsullivan395 3 ปีที่แล้ว +2

    Great presentation.

  • @djmadfingerstv
    @djmadfingerstv 2 ปีที่แล้ว

    Brilliant 👏🏾

  • @Scott-wz4sc
    @Scott-wz4sc 3 ปีที่แล้ว +3

    Hi, excellent video just like your velux fitting ones. On this video you have the tile backer board being installed prior to the tray, I have seen other instructional videos where it is fixed in after the tray is fitted. Is there a set way or can it be either?
    Thanks

  • @cglees
    @cglees 3 ปีที่แล้ว +1

    What mortar is used to fix the tray to the sun floor?

  • @lukedunlin202
    @lukedunlin202 4 หลายเดือนก่อน +1

    Can you take the click lock off the bottom of the tray once it's clicked in ?

  • @justinritchiebray
    @justinritchiebray 3 ปีที่แล้ว +2

    If the tray former is a flat 30mm tray, where do you get your fall towards the drain from?

  • @antoniogalluccio4213
    @antoniogalluccio4213 2 ปีที่แล้ว +1

    How would you continue the fall with the piece of flooring as you say. It looks a like your element boards. Do you continue the fall by creating it with your adhesive underneath?

  • @vividcolourfilms1276
    @vividcolourfilms1276 10 หลายเดือนก่อน

    You are the Jason Statham of Plumbers :D

  • @richardgould9208
    @richardgould9208 3 ปีที่แล้ว

    When you offset the former to miss a joist, what are you infilling with on top of the floor as teh former is 30mm think? Do you put a flat cut tile on here or continue the fall of the tray and do you cut your tiles to a new line? If putting a fall on, what happens to the next tile as it will have a step at the joint will it not?

    • @cglees
      @cglees 3 ปีที่แล้ว +1

      Looks like he used 10mm elements board to bring the sub floor level with the former so just use whatever you are using to bring your floor level up

  • @Richard57072
    @Richard57072 8 หลายเดือนก่อน

    Great video, it inspired me to buy the same system. I have to shorten the shower tray by 100mm, what do I do about the tile lines? Would you mark to the original corners first before cutting? Or draw lines to the new corners? Thanks

    • @AbacusManufacturingGroup
      @AbacusManufacturingGroup  7 หลายเดือนก่อน

      You would need to mark the original corners as this corresponds to the manufactured fall lines.

  • @sergheic3555
    @sergheic3555 ปีที่แล้ว

    Hi can I do the same on I-Joists ?

  • @antoniogalluccio4213
    @antoniogalluccio4213 2 ปีที่แล้ว

    Does abacus sell wetrooms for concrete?

  • @R08mky
    @R08mky ปีที่แล้ว

    Brakes my heart seeing someone use a pH (gyproc) bit to screw in a pz screw

  • @enkaan1676
    @enkaan1676 4 ปีที่แล้ว

    Would it be harder with porcelain tiles?

    • @Midnight-tornado86
      @Midnight-tornado86 3 ปีที่แล้ว

      Be the same job with any tile to be fair a decent wet saw to split the tiles and I always polish the cut edges to make them perfect

  • @icarossavvides2641
    @icarossavvides2641 ปีที่แล้ว

    I tried to use Abacus materials but neither my supplier nor phoning could illicit a response from their, so called, customer support!

    • @AbacusManufacturingGroup
      @AbacusManufacturingGroup  ปีที่แล้ว

      Sorry to hear that Icaros. If you'd like to drop us a line at enquiries@abacus-bathrooms.co.uk we'll endeavor to help!