Marking Up Isolatable sections for QRA & FERA

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ส.ค. 2024
  • This video is a follow up to the video on shutdown and depressurization. It explains how to mark up "Isolatable sections" when we want to calculate risk

ความคิดเห็น • 8

  • @naziko3597
    @naziko3597 2 ปีที่แล้ว +1

    Dear Sir
    Hello, wish you all the best and thank you so much for your nice and technical safety info. Appreciate that.
    I just wanted to say that please keep continue we all need your training and if it is possible please talk about Laboratories HAZID and more, how to do it how to arrange team and etc.

  • @amripfs92
    @amripfs92 2 ปีที่แล้ว

    Hi. Thanks for the video, just wondering that why not this is marked different iso-section for gas inventory and another iso section for liquid inventory?

    • @promotingsafetyengineering7301
      @promotingsafetyengineering7301  2 ปีที่แล้ว +1

      You can also divide your nodes based on gas and liquid inventory, it is really up to you and your clients how you want to divide the nodes

    • @mohdseda1961
      @mohdseda1961 6 หลายเดือนก่อน

      @@promotingsafetyengineering7301
      Do you have an email for contact ?

  • @jaypel5927
    @jaypel5927 2 ปีที่แล้ว

    What is the difference between QRA and FERA?

  • @oualiddebabi7420
    @oualiddebabi7420 ปีที่แล้ว

    please whats the deference between QRA and FERA?

    • @inthayan82
      @inthayan82 ปีที่แล้ว

      QRA evaluate the risk contour such as fatalities/year due to major accident hazards. But FERA exclusively for Fire and explosion hazards FERA will be input for further safety studies EERA Fire fighting design etc.,