CSi Detail for generating detailing output (Building data exported from ETABS)

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ก.ค. 2024
  • How to work in CSI - Detail, after design and analysis of a building in ETABS software, CSi-Detail is an integrated and interactive software product for generating detailing output, such as detailed views, drawings, bills of materials (BOM), and bills of quantities (BOQ) from ETABS models
    Links:
    👍How to design Slabs using Strips Method - ETABS.
    • How to design Slabs us...
    👍Nonlinear Dynamic (Time-History) Analysis |Step by step explanation| - ETABS. • Nonlinear Dynamic (Tim...
    👍How to export the ETABS file to the PERFORM-3D software. • How to export the ETAB...
    If you didn't subscribed my channel yet
    ❤Subscribe Now : bit.ly/3I2gtgb
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 6

  • @BoBbYRaNa
    @BoBbYRaNa ปีที่แล้ว +1

    Brother plz how to install it ...plz hlp

  • @anastaha2438
    @anastaha2438 6 หลายเดือนก่อน

    Hi, why when i run design frames by etabs and export it to CSI detailing, shows that concrete frame results are not availabe? despite i saved etabs after running and designing

    • @SmartEngineer2
      @SmartEngineer2  6 หลายเดือนก่อน +1

      Hello Mr. Anas
      First, perform the design check in ETABS after completing the analysis. Then, export it to CSi Detailing with the specified settings.

    • @anastaha2438
      @anastaha2438 6 หลายเดือนก่อน

      I did , the issue is this
      1) I use ETAbs v16 and designed the frame it is simple frame however , then saved the program
      2) csi detail deals with etabs v18 and this it automatically converts the saved version 16 into 18 to open it and the massage appears already then that the frame which I designed by version 16 is not calaulted or not shown in CSI
      3) also I noticed that ribbed slab the csi detail does not understand to show me the reinforcement for the rib, it deals with it as topping slab only besides that sections that pass through ribs does not show any reinforcement in crossed section, whereas longitudal section it deals with it as reinforcement for topping slab ( 80mm)

    • @anastaha2438
      @anastaha2438 6 หลายเดือนก่อน

      Example the ribbed bottom is 6 T14 for the middle strip, csi does this to be reinforcement for topping slab!!

  • @rcbsht9644
    @rcbsht9644 ปีที่แล้ว

    Can you give us the etabs files