Part 3: Pakyawan vs. Contractor | KAPAG NAGPAPAGAWA KA NG BAHAY NGAYON
ฝัง
- เผยแพร่เมื่อ 6 ก.พ. 2025
- #construction #contractor #pakyawan
Part 1: Magkamo magpagawa ng bahay ngayon
• Magkano magpagawa ng B...
part 2: Magkano magpagawa ng 120 sq.m na bahay
• Part2: Magkano magpaga...
part 3: PAKYAWAN VS. CONTRACTOR
• Part 3: Pakyawan vs. C...
part 4: mga dapat at di dapat gawin kapag nagpapagawa ng bahay
• Part 4: KAPAG NAGPAPAG...
Sa mga di pa nakakapanuod sa ng hardiflex house
Part 1: • Part 1| Less than 150k... (Less than 150k Hardiflex house how it was built)
Part 2: • Part 2 | List of Mater... (List of materials needed for the construction of a Hardiflex House)
Part 3: • Part 3 | Advantages an... (Advantages & Disadvantages of a Hardiflex House)
Part 4: • Part 4 | Common Quest... (Common Questions and My answers)
Part 5: • Part 5 | SLIDING WINDO... (Sliding windows)
Love,
Diane B.
Affliate link/s:
White T- Shirt - shope.ee/2KtOX...
home office desk computer desk office furniture large size 140cm length - shope.ee/5zmhi...
I'm using BOYA BY-V10/V20 ANC Microphone Wireless Mini Lavalier Active Noise Reduction Mic for iPhone Android Vlog
shope.ee/8Ul4N...
67 pcs diy tool set household hardware hand tools combination repairing kit tool box set pliers
👇👇👇
shope.ee/5pkJD...
s.lazada.com.p...
🔥New In Box!🛒 108pc Household Mechanic Tool Set!🔧 DIY Home Maintenance Must-Have!🏠 Grab Yours Now!💥⚡
💡Complete tool set: This 108-piece household mechanic tool set includes a wide variety of tools with complete specifications, making it a comprehensive option for diy home maintenance.
💡Alloy material: The tools are made from durable alloy material, ensuring their longevity and reliability.
💡Storage box for easy carrying: The set comes with a storage box, allowing for easy organization and transportation of the tools.
Get it now for a discounted price of ₱5,122 (from ₱7,683)! Don't miss out - order yours today! 🚀
s.lazada.com.p...
low budget house design in philippines,
low budget house construction,
low budget house philippines,
low budget house designs,
low budget house design ideas,
low budget house design,
low budget house adopt me,
low budget house build,
low budget house building plans,
low budget house design with rooftop,
low budget house designs 3 bedrooms,
low budget house low budget house,
low budget house materials,
low budget house making,
low budget house model
hardiflex house,
hardiflex house philippines,
hardiflex house design,
hardiflex house design philippines
small house design and budget,
small house design and floor plan,
small house design and layout,
small house design and price,
small house design budget,
small house design cost,
small house design construction,
small house design floor plan,
small house design front view,
small house design for small budget,
small house design guide,
list of materials hardiflex house
Comment niyo guys anong mga naging experience niyo sa dalawang nabanggit sa video.
Ma'am pa vlog naman po ng two story for 57 sqm magkano magagastos.
Ma'a pano Po b gumawa Ng coutation para s pakyawan s 2 stories n bahay
Dis agree kami sa sinabi mo na ikaw ang responsible sa ginagawa ng contractor kung Tama o mali. Dapat sa contractor. Dahil yong magpapagawa ay malimit di alam or di makita ang maling gawa ng workers. Kasi kung alam na ang gagawin ay siya na mismo ang gagawa mag hire lang siya ng katulong. Marami diyan sa trabahador may daya. Di alam ng nagpapagawa. Pariho pakiyaw or contractor may daya. Dahil pera hanap nila.
Kht alin dyan pwd nmn Basta swak sa budget at above all dpat nakatutok k sa trabaho nila otherwise tyak hnd mganda Ang lalabasan. Another thing is dpat marunong kang mgmotivate by giving out bonuses pgnagustohan mo Ang trabaho nila.
Basta kung mag pakontrata kayo ng bahay bagong lay out man or renovation kung ang kukunin mo ay sa pakyawan lan g.kailangan may plano or sketch man lang na ibibigay nyo sa kokontrata para alam ang gusto nyo ipagawa.
Kahit ano payan pakyaw ba o arawan Ang importante talaga Dyan an supervision Ng trabaho at kumuha lamang Ng mga trabahador na TalagaNg marami Ng nagawa
Kapag kumapak na ang Tiles napakalaking problema,sa pakyawan,piro may chemical pang pahid para hindi kumapak, may mga tiles hindi squalado bingkung kaya hindi naka lapat mabuti,masakit sa ulo talaga,siguro tatanunging kumuna siya kapag tama ang sagot saka kami magkakaintindihan
At kung may mga tanong kayo feel free to comment.
Mam may tanong po ako
Mam, mga magkano po magpa giba ng bahay... And.. ano po advice nyo if ever kung yung bibilihin na bahay and lupa is sort of luma na then bibilihin thru Pag Ibig sa seller,, bababa po ba appraisal value nun? Thanks po
true po yan ako kc pakyaw ung pinagawa ko sa bahay pero bago pa nag start pinag aralan ko muna ng matagal mga ippgawa ko pra mas maganda kalalabasan.
Thanks for sharing your experience.
Maraming salamat po
Helpful ang mga info na na share nyo po sa katulad kong nagpapagawa ng bahay ngayon. God bless you,ma'am 😊
Eng’r. Pwede rin labour contract ang kontratahin ng contractor para makatipid but the owner need to hire the eng’r. and architect to look after the task of the project as a consultant at least the result is good quality and in proper workmanship.
Yes, pwedeng pwede po. Salamat sa pag share.
More or less magkano ang fee per visit ng engineer ?
3% of sll materials @@koikegracia8383
Tama. Tapos lista na lang ni contractor ang materials needed at kung kailan gagamitin para si owner na lang bibili para makatipid
Salamat sa mga Idea maam Sooner mkaroon din ako Bahay❤❤🙏🙏🙏
Yes. Hehe e manifest ntin.
Balak ko mag pa palyaw mam, 2 stories, wala ako idea kung mag kano lahat magagastos ko sa pakyawan at kung magkano sa mayeriales at magkano sa forman.
Pwede rin yata na ipapakyaw pero ang owner ang bibili ng materyales.
Bsta yong contractor isusulat mga kakailanganin sa pagpagawa ng bahay
Labor lang ang contrata para makatipid sa lahat ng materials na gagamitin. Pag sa contractor ang materials tubo na sya labor tubo pa sya materials
Pag pakyawan barual ang trabaho..Dami magic.
Depende po sa mga nagawa,,ako namamakyaw mura lng pero quality
Namamakyaw po ako ng tiles work,labor lng,
Ang ginawa ko ako bumili ng materyales tapos may Contractor ako , at may engineer din so may quality ang materyales na binibili ko para di tinitipid ,
Magandang paraan din to, na pwedeng gawin ng iba para quality pa din yung mga materials.
Soon po ganito gagawin ko ❤
new subscribers po from korea
Mali ung may contractor ka na pero ikaw parin ang responsable sa ginagawa kung tama or mali, pwede if marunong ung nagpapagawa, pano kung zeo knowledge tlga? And diba mas mahal pag pakyawan?
Pakyawan at much better kung lagi iyong may-ari Nan dun sa site
Magandang paliwanag.. I'm rookie to construction industry.. smalltime contractor..also a hands-on builder.
Marami ako matutunun sayo.salamat po
Thank you po sa panunuod. Sana po ay magakaroon kayo ng more contracts.
Nice advice, Engr. Diane. Very helpful sa katulad ko na nag iisip magpagawa. Thank you.
I'm glad na helpful sayo sir William. Thank you for watching.
Puede po ba ipatigil ang trabaho kung ang namamakyaw ay masyadong over vale wala pa sa kalahati sinisingil na yung di pa natratrabaho
Ang Concrete bungalow umbrella head house ko na sukat 20- 22 + additional terrace. Totally all Cost P360,800.00) Yr 2009 build Natapos 2013, Nahintuan din Dahil OFW Minimum Wages lang. At PANDAY AT 2 HELPER AT KAPATID KO KAMI LANG mag tulong).
Congratulations po. Thanks for sharing.
Mas ok ikaw ang makoha ang material mo wag yong ipa lahat . Ma koha mo ang work nila lang . Wag yong ipa mag belly sa yo
Thanks Engr Diane ❤
Madam if kaya po baka pede po gawa kayo video about loft house salamat po
learned a lot. thank you
@@joshmante7227 i'm glad nakatulong..
Mam magkano po pagkuha ng building permit?
Very helpful po new subscriber here.😊❤
Salamat po! Welcome sa channel.
Magkano magpatayo nang 3 bedroom 2 bath house with solar panel?
Gudeve Engr, Diane pagawa sana ako ng hauz bungalow type 3bedroom at 2bathroom laundry area at dirty kitchen nasa 110 sq.m how much kya aabot ang budget? Sana mka reply ka Engr.Diane. Salamat in advance❤
Pakyawan or Contractor are both Good nag dedepende nalang yan sa gagawa mismo , parehas lang pwede mag loko yan ...
Tama po..
Hello po Ma'am anong buwan po magpatayo ng haus thanks!
Yung wala masyadong bagyo at tag init. At di maulan. Depende sa lugar din po.
Please include DIY and Arawan.
I built my bungalow 324m² house totally DIY.
It is very rewarding and very happy. Given a chance, I will do it again.
Labors are all Arawan.
Contractor lang ang pag install ng bubong. Thanks
@@Just_do_it123 sige gagawan ko po. Salamat sa pagshare ng iyong experience..
Wow it's so beautiful diane
Salamat sa panunuod
Kaya ba maam 8doors 2 storey apartment.. 160smq na lot?
Tapos na , wala ng mangungulimbat ng Pera ng Bayan, 😅😅😅😅
hi maam, pwede ba ako umatras sa usapan nmin na pakyawan ? verbal lng usapan po. diko na kc gusto trabaho nila,napakabagal po, papasok lng kung ano oras nila gusto po
Pwede yan brads bahay mo pera mo kaya ikaw mag decide
magkano po kya budget sa bahay n 2 storey 3 bedroom.ang sukat ng lupa 10m x 10m with bakod cemento po at yun bahay.
Hi Pde po magquote
Nakaranas ako ng pakyawan na panay bale. Nakuha na pera pero di pa tapos trabaho at tinatamad ng tapusin ang ginagawa nila.
Naku po. Siguro mabait po kayo pinabale nyo ng pinabale
Maam asking lng po sa 100 sq. Na land 3 units apartment like ko ilagay ilang sq. Po kya un bawat unit
Dpende po sa design, if kunwari 3 storey ang gagawin tas per floor ung kada unit. Or kung tabi tabi.. dpnd sa design at papano po e maximize.
Mam gusto ko sanang magpatayo ng lumang bahay style sa likod ng bahay namin mas magastos ba ito?"
Depende po sa design saka magging choice po ng materials na gagamitin.. for ballpark figure or guide you can use po 19 to 25k per sq.m
Pwede niyong mapanuod ung part 1 ng video nato salamat
th-cam.com/video/hzNo00u2m3c/w-d-xo.html
Meron akong design paano koba maipadala sa iyo?
hi ma’m first time q po pagawa ng haws pde po ngr ng tips or idea na haws po na medyo maka tipid thank u po
Hi Mam, im in the process na po na magpagawa nang for rent na single house,,ok lang po bah ang 40% na labor na kanila? 43sq meter po ang area at Panglao Bohol.. hope you can advise me
Yes po pwede napo yan.. or e try mo e negotiate if kaya pa nila baban up to 35% baka ibigay ng 37%
Pa clear din po if sa kanila naba ang equipment na gagamitin, or purely labor lang?
Very educational eng. Tagasan ka sa Pinas Eng?
Para po malinaw. Di ba po si foreman ang papakyaw siya ang lumabas na contractor. Hindi ko gets si engr😅. Ang Pag kakaiba lang ng conractor meron license at resibo. At kahit contractor mismo kumukuha pa ng ibang tao para mamakyaw sa project. Ang tawag duon subcontractor para sa mva namamakayaw. Yung title kasi nakakalito pakyawa vs contractor haha.
@@chrispaz1966 "pakyaw" is more like a piece-work arrangement focused on basic labor, while a contractor handles a full project with greater accountability and oversight.
@@chrispaz1966 pakyawan vs. contractor talaga yan..
Thanks po sa info,plano ko magpagawa ng house next year po,75-80 floor area po,bongalow house po,ok lang po ba magpagawa ng plano sa architect kahit sa online lang at di po nya nakita yon lot area?ofw po ako at konti lang alam sa pagpapagawa po ng bahay,need advice po,,salamat po
Normally kapag magpapa design po kayo. Hihingin po ni architect or engineer ung lot plan.. then gagawa sila ng design based sa gsto nyo kung meron kayo mga preferred na design. Pwede naman po,
Ung plano po ba is sign and sealed na? Ung ipapasa nlng sa city hall?
@@DianeB opo mam yon ganyan nga po,wala po ba expiration yon sign and sealed na ipapasa sa munisipyo?
@@bosabos517 alam ko meron po.. may validity. Kaya if this yr mo pinagawa maganda this yr then ipagawa or if kailan mo nlng talaga ipapa gawa saka ka pa design
Sa pakyawan, meron bang warranty ang work nila? And if so, how long is the warranty?
Hello po, depende po sa usapan, and sa scope sa work. Mostly may 3 months, 6 months or isang buwan lng or isang taon.. depende po sa scope and negotiation niyo sa start pa lng ng project or ipapagawa..
Maganda ang pakyawan pg maasahan ang leadman pro pg sira ulo ang leadman kawawa ka..n experienced q n yan s bahay q
hey
Saan ba talaga?
@@stalemate4656 nadeeeeene sympre sa arawan basta naa lng maayo ug di limbungan. Unya naa magbantay
Ang nagpapamahal sa ganiyan ung middleman ... Direkta ka na sa gagawa..
Mag mukang pinakyaw ang bahay mo
@@Craig77775 dpnde sa gumagawa
Rookie si ate
@@Craig77775 yes still learning.
Mahirap kong ang nag pagawa walam alam niloloko lang
Mam pwede b kaung ma pm.hope mpancin.nghhnap kc ako ggawa ng bahay
Hello san po kayo located?
Cavite po.magpapa estimate po sna ako
Gsto ko kmuha ng option.tulad po ng sbi nyo.magoa beed po if san po ako mkakamura
@@rolandramos2429 email nlng po sa infochessa@gmail.com
Wait lang po try ko po
Ma'am di ba ang pakyawan at contractor ay iisa or parehas lang.di other one is arawan?pls enlighten me.
Yon lng talo ka kung pakyaw tapos palpak at madta yung mga workers
Yun din mahirap pag nakuha mo e di aayusin ang pag gawa. Pero madami pa din namang namamakyaw na maayos magtrabaho.
Kaya kailangan ko tutukan o kumuha ka na engineer para inspect ginagawa. Pag di magaling palitan mo mga workers
HI Engineer Diane! Can I ask po tama ba na kung pakyawan, kung magkano nagastos sa materials half of the amount ang bayad sa labor. Thanks
Yung iba po pero hindi lahat ung iba is 40% 45%... depende po sa gagawin na work.