Link 2 Line | Redmond Technology to South Bellevue

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ส.ค. 2024
  • ok cool.
    0:00 - Redmond Technology
    2:43 - Overlake Village
    7:24 - BelRed
    9:59 - Spring District
    12:05 - Wilburton
    14:12 - Bellevue Downtown
    17:26 - East Main
    20:52 - South Bellevue
    Thanks for watching!
    All videos taken April 30th, 2024.
  • บันเทิง

ความคิดเห็น • 12

  • @chickennuggetcentral576
    @chickennuggetcentral576 3 หลายเดือนก่อน +6

    It will be cool to see the updated 1 Line video in August/September after Lynnwood opens.

  • @davidbilleci5891
    @davidbilleci5891 3 หลายเดือนก่อน +3

    The opening of the remaining portion of line 2 is overdue....When I was visiting Seattle in 2022 it looked like all the
    infrastructure was in place.

  • @guinessbeer
    @guinessbeer 3 หลายเดือนก่อน +3

    Pretty cool. Glad to see it opened. Unfortunately until at least downtown Redmond is connected and then even more so once the downtown Seattle connection is complete, the ridership will be low.

    • @realquadmoo
      @realquadmoo 3 หลายเดือนก่อน

      Yeah but Sound Transit’s philosophy is that if something is ready to open it needs to be opened

  • @realquadmoo
    @realquadmoo 3 หลายเดือนก่อน +2

    Well I’ll be darned you beat me to it.

  • @realquadmoo
    @realquadmoo 3 หลายเดือนก่อน +2

    Wait hold on a minute I was on 2 Line all day too

  • @kotaowens6978
    @kotaowens6978 3 หลายเดือนก่อน

    Yay! So happy it’s open. Thank you for the coverage

  • @hobog
    @hobog 3 หลายเดือนก่อน +2

    Hopefully the speeds get increased, otherwise this train is too slow

  • @adrianwitzburg4140
    @adrianwitzburg4140 3 หลายเดือนก่อน

    Nice to see the Kinki Sharyos also running on Line 2. I thought they would be exclusive to line 1.

  • @charleskelly3839
    @charleskelly3839 2 หลายเดือนก่อน +1

    0:39 Next Stop, Overlake Village.
    2:25 Now Entering, Overlake Village. 2:28 Doors to my right.
    3:07 This is the 2 line to, South Bellevue.
    3:46 Next Stop, BelRed.
    7:00 Now Entering, BelRed. 7:02 Doors to my right.
    8:47 Next Stop, Spring District.
    9:44 Now Entering, Spring District. 9:47 Doors to my right.
    10:53 Next Stop, Wilburton.
    11:47 Now Entering, Wilburton. 11:49 Doors to my left.
    12:49 Next Stop, Bellevue Downtown.
    13:41 Now Entering, Bellevue Downtown. 13:44 Doors to my right.
    15:04 Next Stop, East Main.
    16:31 Now Entering, East Main. 16:33 Doors to my right.
    18:24 Next Stop, South Bellevue.
    20:31 Now Entering, South Bellevue.

  • @edgarzone2875
    @edgarzone2875 3 หลายเดือนก่อน

    FINALLY

  • @Lopezflies888
    @Lopezflies888 2 หลายเดือนก่อน

    There's always someone speaking loud Spanish on Seattle transit