Eco U Construction- Rapid Building System Installation Step 4 Erecting First Panel

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ก.ย. 2024
  • In this step; we install our first insulated panel. It is vital continuous lines of polyurethane sealant are applied on the wall locator. The edge of panel needs to line up with exisiting mark, so that when the next components are installed the panel will not be fouling.

ความคิดเห็น •