Sir jodi kono survey company khulte chai tahole ki vabe korbo ar auto level er kaj kivabe pabo ektu ei bisoi ta niye details a alochona korle valo hoi. Etao very important topic. Thank you
Bro the Video is very good but the last of video the formula is a bit difficult one side camber and two side camber you used formula (L/100=ans×%) this is difficult Camber show 2% sloop and 4 m distance than we can do (2÷100=ans×L) 2÷100=0.02×4=0.08 per Meter sloop
Sir ji agar hmm 2km ka survey karne ko bol diya jaye or hmme ki shi bhi parkar ka chainage nhi diya ho sirf start point ho ab hme waha se 2KM tak ka survey karna hai to kese karenge Please reply me sir it's most important for me*
Thank you sir. Fresher students को आप बहुत अच्छी ज्ञानवर्धक वीडियो बनाते रहते है बहुत बड़िया सर आपने हमे you tube में ही surveyor बना दिया.
Thank you so much
Bhut bhut sukriya sir ji plz upload part2
Ye video dekho th-cam.com/video/ZoK_Ad6fXqU/w-d-xo.html
Ji ji bilkul sir cutting filling ka video banaye sir
Video upload he dekho already
Aj ne sab vidyo dekhuga❤ gud
Thank you
Thankyou sir next vid
Upload hai dekho
You are best bro❤
Thank you so much
Very important video sir
Thank you
দাদা surveyor interview কিছু qustion নিয়ে একটু আলোচনা করো দাদা
তোমার ভিডিও গুলো থেকে অনেক বেশি উপকার পেয়েছি দাদা❤
Ok
Thank you sir 🙏
Welcome dear 🥰
Very imp video
Thank you
Very good sir ji
Ok
RAKESH BRO. I,M FROM PAKISTAN WORKING AS AS CIVIL SURVEYAR IN SAUDI AREBIA. I JUST WANT TO APPRECIATE YOU.
Thank you so much
Very nice 👍 sir ji
Thank you 😊
Sir jodi kono survey company khulte chai tahole ki vabe korbo ar auto level er kaj kivabe pabo ektu ei bisoi ta niye details a alochona korle valo hoi. Etao very important topic. Thank you
Ok
One video Transmission line profile and Tower scheduled
Ok
Very nice
सर जी Drawing पढ़ने पर भी वीडियो बनाओ
Ok dear
Thank you sir
Welcome dear
Bro the Video is very good but the last of video the formula is a bit difficult one side camber and two side camber you used formula (L/100=ans×%) this is difficult Camber show 2% sloop and 4 m distance than we can do (2÷100=ans×L)
2÷100=0.02×4=0.08 per Meter sloop
Ok Jaise tumko samajh mein aaya se karo 👍
Good
Thank you 😊
Super
Thank you
Toe side slope and 1:2 kaisa kar bhai
2:1hoga
Mechanical site me survey kese kare ??
Mechanical par micro mm par kam hota he
Bro how draw the cross-section in AutoCAD using length & height . please make video
Ye video dekho th-cam.com/video/p2tGg-x66-E/w-d-xo.html
How to making Transmission line profile
Ok
Sir ji agar hmm 2km ka survey karne ko bol diya jaye or hmme ki shi bhi parkar ka chainage nhi diya ho sirf start point ho ab hme waha se 2KM tak ka survey karna hai to kese karenge
Please reply me sir it's most important for me*
Pehele level ke shath survey kar Lena 2km uske bad khud chainage bana Lena bas .
Ho Jaye ha
Agar nehi samaj me aya so WhatsApp sms karo
Sir app bohot acha jankari dete ho
Hydro electri power project me survey ka kam kaise kare
Ok I am trying
❤❤❤❤❤
❤️❤️❤️
🙏🙏
❤️❤️
How to Decide FINAL ROAD LEVEL With When we have Cross section & Ngl ?
Ye video dekho
th-cam.com/video/KkeifpVy9LU/w-d-xo.html
Sir ap nay jo ratio ka batia he to height kesay aaya sahi samjh nhi aai pls
Video ache se dekho samaj me ayega
Ok sir thanks
স্যার বলছি এর পরের পাঠ গুলো দিও
@@tuhinadak622 join online channel member
Sir apnar bari kuthay
West Bengal
❤❤
❤️❤️❤️
Total station
???
Sir per meter 10mm hai
??