Thanks again. 1) Sir can you please make a video on what is the difference between, takeoff, estimation, rate analysis and boq? 2) And what is the difference between construction estimator and quantity surveyor, in terms of quantity surveyor as in the client side and construction estimator on the contractor side, how do both of them work, and what are the difference between both of works.
@ Delay analysis is not only about determining the cause and effect of delays but also about quantifying the financial impact of those delays. Quantity Surveyors/Cost engineers are responsible for assessing the financial consequences of project delays, including cost overruns, loss of productivity, and other expenses. I do believe that tutorial on delay analysis would be valuable for both planning and cost engineers, providing a comprehensive understanding of delay implications. Thank you!
Great 🎉 sir Can you make a video on How are you doing the quantity takeoffs from drawing I mean which tool eg AutoCAD, blue beam, planswift etc. Thanks
Sure. Until then, you can watch this video about variations which I released not long ago Your guide to contract variation and the procedure to do it with a variation example th-cam.com/video/qN8QOmChcxY/w-d-xo.html
My name is aasif, i have experience in Oil and gas construction site projects with samsung Engg GCC countries including abudhabi branch office. , i need to update myself and the subject with your guidance and videos which is very useful content. Since am not technical background but am quick learner. Kindly assist me
Thank you for watching and good luck with your learning journey, it's never too late to gain knowledge. Focus on searching learning materials on quantity surveying and cost estimation from me and from others as well.
Best video sir ...keep uploading,,,❤❤
Thanks again.
1) Sir can you please make a video on what is the difference between, takeoff, estimation, rate analysis and boq?
2) And what is the difference between construction estimator and quantity surveyor, in terms of quantity surveyor as in the client side and construction estimator on the contractor side, how do both of them work, and what are the difference between both of works.
Thank you for watching ❤️. Great video idea 👍
Thank you Sir for your teachings, can you please do a video on how one can check for the accuracy of their estimate.
Thank you
Thanks for watching. Great suggestion 👍
Very insightful!
Kindly do tutorial on how to carry out Delay Analysis.
Thank you!
Delay analysis is a planning engineer specialty, not cost engineer 😁
@ Delay analysis is not only about determining the cause and effect of delays but also about quantifying the financial impact of those delays. Quantity Surveyors/Cost engineers are responsible for assessing the financial consequences of project delays, including cost overruns, loss of productivity, and other expenses.
I do believe that tutorial on delay analysis would be valuable for both planning and cost engineers, providing a comprehensive understanding of delay implications.
Thank you!
@ Great suggestion, I'll consider it for future videos.
@@CEPQS That’s interesting! Thank you in advance!
Thank you for the video
Thanks for watching! 😊
Great 🎉 sir
Can you make a video on How are you doing the quantity takeoffs from drawing I mean which tool eg AutoCAD, blue beam, planswift etc.
Thanks
Thanks for watching. Great suggestion 👍
Sir please do video for variation from scratch to finish as practical
Sure. Until then, you can watch this video about variations which I released not long ago
Your guide to contract variation and the procedure to do it with a variation example
th-cam.com/video/qN8QOmChcxY/w-d-xo.html
Great 👍
Thank you 😊
could you please make a BOQ using NRM2, Thanks
I never tried it before, but it would be a good idea 😁
Can you share the measurement sheet and drawing used to make this video?
it will be made available soon. Join the newsletter to get notified 👍
@CEPQS how do i joint
@@Ahamed-g5j link in the description
Is there any link to download this excel sheets , if so please provide us so that it will be very helpful.
It will be made available in the future 👍
My name is aasif, i have experience in Oil and gas construction site projects with samsung Engg GCC countries including abudhabi branch office. , i need to update myself and the subject with your guidance and videos which is very useful content. Since am not technical background but am quick learner. Kindly assist me
Thank you for watching and good luck with your learning journey, it's never too late to gain knowledge. Focus on searching learning materials on quantity surveying and cost estimation from me and from others as well.
❤❤❤❤
First as usual 👍❤
Please create a video about Earned value analysis deeply with practical example
Previously done, please check it out 😊
th-cam.com/video/LUc4Pmlgkqw/w-d-xo.html