Ryan, you have created the most comprehensive video on equipotential bonding for swimming pools and jacuzzis. It effectively addresses the recent updates to section 680.26 and is presented highly professionally. Thank you for your efforts!
Single #8 copper wire does not sound like a good idea. Most electricians won’t settle for “good enough “, we want things to be safe and bulletproof. Excellent video once again. Thanks
Would you have any comments on how to ensure a hot tub / spa is safe on an existing concrete pad that does not have rebar or any special metal in it to ground? Probably a typical setup for many hot tubs. 4 inch pour on top of rock and dirt. Hot tub is basically insulated from the slab as it has a plastic liner. Does one just measure the voltage between the water and the concrete pad? If there is voltage present what might you suggest doing to make them equal?
Some areas around me above ground pools are popular and installed by the lowest bidder (often the pool salesmen never explain how much electrical work is required). Most of these installations are just on the unpaved grass, and therefore we will bury the #8 conductor 5" under the surface. How would this work with the copper grid? Im not arguing that it creates a better equipotential area, but would it be required to dig up a three foot path around the pool?
Thanks again Ryan, would like to know about the substantiation and corroboration for the pool shocks caused by the single conductor method. Could be just bad install. Loose joints, water not bonded etc. I would have fell on the minority side of this TIA also without corroborating evidence
About the 12:00 min mark. With the fence being that far away wouldn’t it be more of a danger to have it bonded so it could potentially have voltage on it? Seems more likely to have someone staring on the dirt outside it and touching it that someone in the water.
Hello Ryan, Concerning packaged hot tubs being exempt from an equipotential grid on the perimeter surface, what is the justification of the stipulation of the “top rim at least 28 inches above perimeter surface”? Is it assuming that a person could get out of the hot tub without using the typical non-conductive steps if this distance was
I am confuse ..I have an exterior Panel for the pump , water heat sistem , lights etc ,the sub panel it’s feed with 4 wires gauge # 10… of course neutral separate with the ground … do I need to complete the bounding around the pool , conect all the metal bare , ladder , lights , Water heat , sum pump , etc and then conect to the sub panel ground together? ? Also I installed 2 rod for ground , but the NEC say is no necessary to a add the bounding to any panel ??
Question for the inspectors, with input from all whoever installed swimming pool equipment particularly outside where you would have a combination panel/controller for all the associated pool equipment. I think i might have dropped the ball over the years, regarding article 250.32 structure supplied by feeders. once we install 2 posts in the ground and mount our pool equipment to it( now is this not a structure?), then pull our feeders. I do believe we're obligated to install a grounding electrode system as well. Never have done this or been called out by an inspector over this. Thoughts?
I’ve never had anyone require a ground rod for that. Just bond it to the panel feeding the pool panel. If it’s on the back of a detached garage or something, the garage feed would require a ground rod to be driven but I don’t think a couple of posts in the ground classifies as a “separate structure”
I would agree with you that if you put it on the exterior of a garage,then the feeder originated from the panel from the garage that you wouldn't need one, other than the freestanding garage would need one. The example I'm trying to use is if you had to build something to mount your panel to, other than an existing structure.
@tymccart164 2 minutes ago Hello Ryan, Concerning packaged hot tubs being exempt from an equipotential grid on the perimeter surface, what is the justification of the stipulation of the “top rim at least 28 inches above perimeter surface”? Is it assuming that a person could get out of the hot tub without using the typical non-conductive steps if this distance was
Wait. There was testing, which yielded factual results, that further evidenced a single conductor was not good enough in which people were getting shocked and not able to use their pool and you and other “panelists” voted No?!?! …the purpose of the code is THE SAFE GUARDING OF PEOPLE & PROPERTY. If that’s not a direct example then idk what is. I’m glad the others got it right!!
@timrobinson4330 Karen forgot there's a thing called HUMAN ERROR!😂 And whatever the process entails to be on this panel tells me you probably have an engineering degree, or an extended amount of electrical knowledge...so I'm sure there was a very good reason Ryan voted it down!
Great video. I have shared this with numerous local inspectors.
Ryan, you have created the most comprehensive video on equipotential bonding for swimming pools and jacuzzis. It effectively addresses the recent updates to section 680.26 and is presented highly professionally. Thank you for your efforts!
This is the best explanation of , why we need to bond pools correctly, I have seen on TH-cam.
Thanks!
Thank you!
Great information, Ryan. Thanks as always.
Great work Ryan! It's always a pleasure learning from you, thanks!
Thank you for the informative videos!
Ryan's the 🐐
Very informative, and very clear. Seriously excellent presentation.
Single #8 copper wire does not sound like a good idea. Most electricians won’t settle for “good enough “, we want things to be safe and bulletproof. Excellent video once again. Thanks
Yea, I agree. There's nothing like running the minimum just to realize you have to tare everything up to do it again 😅
Holly crap, the fact that 500k volts could be traveling through a pool is scary. Every one with a pool needs to watch this.
Would you have any comments on how to ensure a hot tub / spa is safe on an existing concrete pad that does not have rebar or any special metal in it to ground? Probably a typical setup for many hot tubs. 4 inch pour on top of rock and dirt. Hot tub is basically insulated from the slab as it has a plastic liner. Does one just measure the voltage between the water and the concrete pad? If there is voltage present what might you suggest doing to make them equal?
Would be ok to bound the perimeter with copper conductor and conductive cement around it? Or plus agriculture soil mixed with conductive cement
I would like to ad pics of how I did a bounding mesh for a building in peru. There is a lot of difference on bounding methods
Some areas around me above ground pools are popular and installed by the lowest bidder (often the pool salesmen never explain how much electrical work is required). Most of these installations are just on the unpaved grass, and therefore we will bury the #8 conductor 5" under the surface.
How would this work with the copper grid? Im not arguing that it creates a better equipotential area, but would it be required to dig up a three foot path around the pool?
Thanks again Ryan, would like to know about the substantiation and corroboration for the pool shocks caused by the single conductor method. Could be just bad install. Loose joints, water not bonded etc.
I would have fell on the minority side of this TIA also without corroborating evidence
About the 12:00 min mark. With the fence being that far away wouldn’t it be more of a danger to have it bonded so it could potentially have voltage on it? Seems more likely to have someone staring on the dirt outside it and touching it that someone in the water.
Thank you Ryan 😊 great video..
This is for conductive pools only and the single conductor method still seems to be accepted for nonconductive pools in the TIA correct?
Hello Ryan,
Concerning packaged hot tubs being exempt from an equipotential grid on the perimeter surface, what is the justification of the stipulation of the “top rim at least 28 inches above perimeter surface”? Is it assuming that a person could get out of the hot tub without using the typical non-conductive steps if this distance was
I am confuse ..I have an exterior Panel for the pump , water heat sistem , lights etc ,the sub panel it’s feed with 4 wires gauge # 10… of course neutral separate with the ground … do I need to complete the bounding around the pool , conect all the metal bare , ladder , lights , Water heat , sum pump , etc and then conect to the sub panel ground together? ? Also I installed 2 rod for ground , but the NEC say is no necessary to a add the bounding to any panel ??
😂😂 wow he gave me the answer on the video !!! Amazing help , pictures all the details Thank mr you are a master
Question for the inspectors, with input from all whoever installed swimming pool equipment particularly outside where you would have a combination panel/controller for all the associated pool equipment. I think i might have dropped the ball over the years, regarding article 250.32 structure supplied by feeders. once we install 2 posts in the ground and mount our pool equipment to it( now is this not a structure?), then pull our feeders. I do believe we're obligated to install a grounding electrode system as well. Never have done this or been called out by an inspector over this.
Thoughts?
I’ve never had anyone require a ground rod for that. Just bond it to the panel feeding the pool panel. If it’s on the back of a detached garage or something, the garage feed would require a ground rod to be driven but I don’t think a couple of posts in the ground classifies as a “separate structure”
I would agree with you that if you put it on the exterior of a garage,then the feeder originated from the panel from the garage that you wouldn't need one, other than the freestanding garage would need one. The example I'm trying to use is if you had to build something to mount your panel to, other than an existing structure.
Also just add... Done many pools where the pool equipment is exterior Island(All out in the open) situation 30 to 50 ft away from the house.
If it stands alone separated from a garage or house it’s a separate structure that has been built. It Will require a grounding electrode system.
I do tend to agree
Grounding resistance has to ground need to be less then 5 ohms, normally 1.5 to 2.5 ohms resistance,
@tymccart164
2 minutes ago
Hello Ryan,
Concerning packaged hot tubs being exempt from an equipotential grid on the perimeter surface, what is the justification of the stipulation of the “top rim at least 28 inches above perimeter surface”? Is it assuming that a person could get out of the hot tub without using the typical non-conductive steps if this distance was
Thanks Ryan!
Nice video
Wait. There was testing, which yielded factual results, that further evidenced a single conductor was not good enough in which people were getting shocked and not able to use their pool and you and other “panelists” voted No?!?! …the purpose of the code is THE SAFE GUARDING OF PEOPLE & PROPERTY. If that’s not a direct example then idk what is. I’m glad the others got it right!!
There was a lot more to it than that.
Dude what?! Please explain in further detail. Comments like this must be backed with something other than a Karen response. Ryan does a great job bruh
@timrobinson4330 Karen forgot there's a thing called HUMAN ERROR!😂 And whatever the process entails to be on this panel tells me you probably have an engineering degree, or an extended amount of electrical knowledge...so I'm sure there was a very good reason Ryan voted it down!