Identify Waste Activities and Give your Suggestions for Improvements in Comment Section अपशिष्ट गतिविधियों को पहचानें और सुधार के लिए अपने सुझाव टिप्पणी अनुभाग में दें
As per My Observation Firstly Tool Trolly design.2.marking on the fix die according to die height 3. Short clamp Bolt size.4.used jack penultimate lift trolly for die load and unload.
No Helmet, No Safety Shoes n No Safety Gloves. They working or not. This is very dengerous for there life. Pls Use Safety Equipment 🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏. Jai Hind
As per my observation firstly they should follow safety parameters. Secondly they should define specific place for each tool and each tool should be on its own place. Thirdly, They should divide their task or operation everyone should do own task or operation
Identify Waste Activities and Give your Suggestions for Improvements in Comment Section
अपशिष्ट गतिविधियों को पहचानें और सुधार के लिए अपने सुझाव टिप्पणी अनुभाग में दें
As per My Observation Firstly Tool Trolly design.2.marking on the fix die according to die height 3. Short clamp Bolt size.4.used jack penultimate lift trolly for die load and unload.
Great observations but last one is impractical as die weight is around 5000 kgs
No Helmet, No Safety Shoes n No Safety Gloves. They working or not. This is very dengerous for there life. Pls Use Safety Equipment 🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏. Jai Hind
Great observation, first basic is safety
As per my observation firstly they should follow safety parameters.
Secondly they should define specific place for each tool and each tool should be on its own place.
Thirdly, They should divide their task or operation everyone should do own task or operation
Great observation
Plz sir make a video MRCM report
I didn't get you, pl elobrate