Column c/c = 6000+6000 =12000 Column corner= 200+200 =400 so total length = 12400 lap length = 50d = 50*25 = 12400+1250 = 13650 - 50 (cover) = 13600 develop length (i mean L length ) = Ld ( 50*25) = 1250 = not consider the beam size bigger then L size so beam height 400 - (top & bottom cover + top steel dia) = 400 - (50+50+25) = 275 Total length = 13600+275 = 13875 This just for calculation steel full length 12.1M
Deduction of bar dia will come 1.90°bend = 3 nos ( 3×2d)=6 nos. 2.135° bend = 2 nos. ( 2×3d) = 6 nos Total 12 nos of dia bar need to be deducted.Otherwise your explanation was too good compare with other video.Keep going, it will useful of upcoming generation. Thanks and regards. G.Srinivasan
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m I mean after 3rd column there is Cantilever Projection So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these . & took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
Sir, 21:19 While subtracting the bend in the stirrup, you considered 5 x 90 degrees, but at the hook, the bend is 135 degrees right? So it should become (3 x 90 degrees + 2 x 135 degrees), which is (3 x 2d + 2 x 3d) = 12d, instead of (5 x 2d = 10d), right? Little clarification is required in this part, and yes, your work is helping me a lot. ❤❤
Sir ji, ap top aur botom bar ki length jab find kr rhe ho to (400-50) kyu kr rhe ho...apko (200-50) karna chahiye...kyunki clear span colomn ke centre se hai....please mujhe bataye...mai sahi hu ya galat.please
while calculating cutting length Already 200mm from column cross section is added with span of 6000mm So if we want to reduce cover in the sense we should do like 200-50 from remaining area of the span (200-50)+6000+1250 And it's not 16000 initially 200+6000+6000+200= 12400
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m I mean after 3rd column there is Cantilever Projection So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these . & took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
Aap Ka video dekh Kar abb mujhey apney professor pe gussa aa raha hai. Aap ne itna vadhiya samjhaya hai ki abb yeh asaan lagney lgaa hai. Kash College mein aisey btayaa jaei! Why don't they take as much pain as they should. I will give you 10/10 Thanks for explaining everything in detail.
Sir sayd length jo aapne add kiya hai main beam ka 200+6000+6000+200 wo aapne 16000 likha hua hai jbki wo 12400 aati hai .. to sir wo jara explain kr dijiye na ki 16000 kaise aayi. Thanks and regards
Sir , I have been watching ur videos since 2018, took the online training u suggested n now I m an Govt Er. Can u please have a offline save option for your videos. It would help alot as i live in no netzone.
Sir बहुत-बहुत धन्यवाद । Top extra bar और Top main bar का L का length बराबर 850 नही रख सकते क्योंकि Top extra bar में spesher pin आने से ये बडा हो जायगा ।
Sir, I appreciate you that which you had uploaded video regarding BBS, at the same time in my opinion i want to let you know, if it possible can you provide us for the viewer through our link regarding BBS PDF file notes along with details drawing, if it possible the viewer concept will be clear definitely, if you could manage your time try to make another video BBS along with Pdf, i beg you earnestly. And also I want to let you know our previous video are little bit fast from one page to another pages, by somehow if it possible then try to make slow a little then before others day, in the days to come. Thanks
Good civil site engineer keep it nice work by guys make one video for drainage cutting level as per DRG and mathology of work bathroom water proofing and drainage and plumbing pipes fittings in bathroom
Sir, footing column, beam slab wagera ki size or dimension kese find kare?? Agar hume koi new building banani ho?? Kya aap agla video iss topic par bana sakte ho ki kese size decide kare.
Sir super video no doubt... but sir practicaly samjhate to jyda better hota...Aur aapne kafi jaldi-2 chizon ko explain kra hai to thodi si problem aa rhi samjhne main!
Sir please make a video on how to design steel for slab according to load.... Ki load ke hisaab se hme kitna steel provide krna chahiye....kitna size rkhna chahiye slab ka
200+6000+6000+200 is 12400 mm. You have taken 16000 mm. Pl check column end to end is 12400 plus lap (1250-200) 1050 on each side. So total 12400 + 1050+1050 +lap is 15750 mm . You have taken 2000 mm instead of 200 mm .
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m I mean after 3rd column there is Cantilever Projection So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these . & took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
Clear Height between plinth beam top and roof beam bottom-11 feets Zone-A-11/4=33 inches Zone-B-11*12-66=132 -66=66 inches There are 6 bars 16mm@4,12mm@2 At zone B top- 2 no of lappings At zone B middle(30 inch below top lapping points)-3 no of lapping At Zone B bottom (30 inch below middle lap point)-1 lapping Whether the above arrangement is allowble? Whether lintel tie beam can be provided any zone? What if lintel tie beam falls on zone-A top area?
(400-50)+6000+200?+3000+1000= ye jo 200mm hai column ka half hai lena jaruri hai jab adhi beam ki 3000 length le chuke hai to ??? Aur 16000+1000 =17000 kiye to use 16000 ki use kar rahe hai..
I love ur effort for making this type of videos sir ji👍but i hv one doubt sir in end extra bar y u add 1500+350 actually from the drawing 1500is enough but y 350also
Hello all this mathematics done by structural engineer right. I mean all details will be in structural plan. Or do you have to calculate on site per beam ?
Bhai bottom continuous bar ke drawing mei ek side 400-50 kiya hai usmei 200-50 hona chaiye mujhey lagraha hai nahi to lap lenth bhi double kiu nahi kiya
Sir ap ne jo ld bend kiya hai 400-50 Kyun Kiya hai.......400 ka to column hai to 350 minus hona chahiye....400-50(cover)=350. Please sir explain...... I am unable to understand.
10:12 minutes par jo calculation btao hai vo dubara check kre, 1500-400-50 = 1050,but aapne 1150 kese likha, jo calculation ki hai usme 1500-400-50= 1500-350= 1150 likh hai
Column c/c = 6000+6000
=12000
Column corner= 200+200
=400
so total length = 12400
lap length = 50d
= 50*25
= 12400+1250
= 13650 - 50 (cover)
= 13600
develop length (i mean L length )
= Ld ( 50*25)
= 1250
= not consider the beam size bigger then L size so beam height 400 - (top & bottom cover + top steel dia)
= 400 - (50+50+25)
= 275
Total length = 13600+275
= 13875
This just for calculation steel full length 12.1M
Good bro
11111l q
Ye video bnane wala abhi kacha badam h
Deduction of bar dia will come
1.90°bend = 3 nos ( 3×2d)=6 nos.
2.135° bend = 2 nos. ( 2×3d) = 6 nos
Total 12 nos of dia bar need to be deducted.Otherwise your explanation was too good compare with other video.Keep going, it will useful of upcoming generation.
Thanks and regards.
G.Srinivasan
Very important freshar sir right video our esehi video share karte raho tq so much
Love you....
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m
I mean after 3rd column there is Cantilever Projection
So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these
.
& took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
Unique video. Unique content explanation.
Mja aa gya👍👍🙏
Sir, you are helping a lot for freshers like us.
Your videos are very informative and easy to understand.
perfect teacher.proud of you sir.
Super explanation... Very helpful
Thanks brother keep watching
@@civilsitevisit sir IS code me to 10db add Kiya hi nahi hai. Ye ld +10 db kaha se aaya formula
I am not able to learn clearly
Best Explanation Sir 👌 👌.. But mujhe end extra support samajh nhi aaya agar drawing me bhi dikha dete to sanajh jata. Thank you Sir
Very Important Video of Fresher Civil Engineer Please See This concepet Is very Helpful thank you so much sir Good bless you
Thanks ...sir bahot knowledge milii..
Wow sir wow fully cleared.. love u sir.
Thanks a lot for great explanation. By this freshers also can understand but they have to look in to this in a practical site workouts
Sir, 21:19
While subtracting the bend in the stirrup, you considered 5 x 90 degrees, but at the hook, the bend is 135 degrees right? So it should become (3 x 90 degrees + 2 x 135 degrees), which is (3 x 2d + 2 x 3d) = 12d, instead of (5 x 2d = 10d), right? Little clarification is required in this part, and yes, your work is helping me a lot. ❤❤
instablaster.
Thanks sir .your video is very helpful
Sir ji, ap top aur botom bar ki length jab find kr rhe ho to (400-50) kyu kr rhe ho...apko (200-50) karna chahiye...kyunki clear span colomn ke centre se hai....please mujhe bataye...mai sahi hu ya galat.please
while calculating cutting length
Already 200mm from column cross section is added with span of 6000mm
So if we want to reduce cover in the sense we should do like 200-50 from remaining area of the span
(200-50)+6000+1250
And it's not 16000 initially 200+6000+6000+200= 12400
Right...
Mujhe mere Mathematics pe doubt hogya bhai tha thanks ❤️...✌️😂😂🤣🤣🤣
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m
I mean after 3rd column there is Cantilever Projection
So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these
.
& took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
Yes
Aap Ka video dekh Kar abb mujhey apney professor pe gussa aa raha hai.
Aap ne itna vadhiya samjhaya hai ki abb yeh asaan lagney lgaa hai.
Kash College mein aisey btayaa jaei!
Why don't they take as much pain as they should.
I will give you 10/10
Thanks for explaining everything in detail.
Sir sayd length jo aapne add kiya hai main beam ka 200+6000+6000+200 wo aapne 16000 likha hua hai jbki wo 12400 aati hai .. to sir wo jara explain kr dijiye na ki 16000 kaise aayi.
Thanks and regards
Brother ...bo calculation meh mistake hai ... Baki procedure follow karo ...length yahi le lo
Subscribe channel ....ni dekhte brother apke comments
@@civilsitevisit
IAM also confused
Exactly
follow ...procedure calculate yourself guys
Sir boht helpful h ye bbs plz isi bbs ko excel m bnakr video bnaiye
Thanks a lot for making a video in BBS 🙏
No worry brother
I will make more 2-3 video on it soon
Sir ye aapne bottom bar ka vagre nikala hai vo cutting length nikali kya ?
Sir Mid extra bar me aapne continues column k both side aapne L1 distance s leke kyo calculate kiye hai.
Jabki L1 and L2 lena chahiye tha
9:07 1500-400-50
1500-450= 1050
And sir aapne
1500-350= 1150
Calculate mistake
But very informative video 👍
yes chandan calculation mistake
nice. site images b lga diya krain sath main. understanding k liye.thanks sir
Sir , I have been watching ur videos since 2018, took the online training u suggested n now I m an Govt Er. Can u please have a offline save option for your videos. It would help alot as i live in no netzone.
Thanks For Teaching Sir
Please continue guiding and inspiring us with lot more videos.
Thanks brother keep watching
@CivilSiteVisit sir aap ki koi app hai kya
Sir! Top ki sabhi bars ko ek hi jagah par lap kar skte he? Ya har bar ke liye alag alag karna hota he?
Cutting length of main bottom bar
Firsty calculate clear span length
= Effective length- 200- 200
= 6000-200-200
= 5600
Clear span length = 5600
When we calculate cutting length of main bottom bar( left side from lap)
= ( Ld+ 10db)+( clear span length)+(column length) +(lap length 50d)-(bend)
= 1500+5600+400+1250-50
= 10700
Right side from lab
( Clear span + Ld + 10db)
=5600+1500
= 7100
K
Are bhai...cover block se apko kya koi matlab ni hai😂
Excellent sir very helpful
Sir
Muze 1 confusion hey laping length 1250 liya hey lekin 1250x2 ayega kya? Kyu ki dono side se bar lap hoga
Superb ...👌
Thanque sir
Thanks brother keep watching
Sir बहुत-बहुत धन्यवाद ।
Top extra bar और Top main bar का L का length बराबर 850 नही रख सकते क्योंकि Top extra bar में spesher pin आने से ये बडा हो जायगा ।
Your videos are very helpful engineer, and would you please use English language so others who didn't speak your language can get understanding.
Sir, I appreciate you that which you had uploaded video regarding BBS, at the same time in my opinion i want to let you know, if it possible can you provide us for the viewer through our link regarding BBS PDF file notes along with details drawing, if it possible the viewer concept will be clear definitely, if you could manage your time try to make another video BBS along with Pdf, i beg you earnestly. And also I want to let you know our previous video are little bit fast from one page to another pages, by somehow if it possible then try to make slow a little then before others day, in the days to come. Thanks
I've been searching like you.
Good knowledgeable vedio .thanks. but still not getting interview calls 😪
Good civil site engineer keep it nice work by guys make one video for drainage cutting level as per DRG and mathology of work bathroom water proofing and drainage and plumbing pipes fittings in bathroom
Ofcourse brother soon keep watching n keep loving
Verry helf full video sir❤️
Sir, footing column, beam slab wagera ki size or dimension kese find kare?? Agar hume koi new building banani ho?? Kya aap agla video iss topic par bana sakte ho ki kese size decide kare.
My dear sir as per total length of beam for main bar will come 12.4m.But you were metion 16.m.Can you explain how to calculate this 16 m length?
Actual beam ke sath bhi bata de sir, puri tarah samjh ni aaya. Very nice explain.
Sir super video no doubt... but sir practicaly samjhate to jyda better hota...Aur aapne kafi jaldi-2 chizon ko explain kra hai to thodi si problem aa rhi samjhne main!
Very helpeful
Sir please make a video on how to design steel for slab according to load....
Ki load ke hisaab se hme kitna steel provide krna chahiye....kitna size rkhna chahiye slab ka
Okay brother bnata hun don't worry
200+6000+6000+200 is 12400 mm. You have taken 16000 mm. Pl check column end to end is 12400 plus lap (1250-200) 1050 on each side. So total 12400 + 1050+1050 +lap is 15750 mm .
You have taken 2000 mm instead of 200 mm .
Total length of bar =12.4 m hai sir
Hmm yeh sahi hai
Brother he is Calculating upto end As our TMT Bar Steel length is limited upto 12m
I mean after 3rd column there is Cantilever Projection
So Total Length will be (developmentlength in first column+(6000+6000)+ eff.length of cantilever projection)= 17150 or not I too don't know what was the projection given so he summed up all these
.
& took this Overall length and deduct the remaining Part of Lap length... 👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻👍🏻
G yehi sahi hai but wo by mistake hua hai ...
Tremendous Sir🙏
Thanx a Lot ..............
Clear Height between plinth beam top and roof beam bottom-11 feets
Zone-A-11/4=33 inches
Zone-B-11*12-66=132 -66=66 inches
There are 6 bars 16mm@4,12mm@2
At zone B top- 2 no of lappings
At zone B middle(30 inch below top lapping points)-3 no of lapping
At Zone B bottom (30 inch below middle lap point)-1 lapping
Whether the above arrangement is allowble?
Whether lintel tie beam can be provided any zone?
What if lintel tie beam falls on zone-A top area?
Sir effective length lainay ke bad ap ne dobara column half length q add ki huvi h?? Please tell me
Nice explanation
(400-50)+6000+200?+3000+1000= ye jo 200mm hai column ka half hai lena jaruri hai jab adhi beam ki 3000 length le chuke hai to ??? Aur 16000+1000 =17000 kiye to use 16000 ki use kar rahe hai..
Development length is used to grip but lap is used to reduced tension. Is it right?
I proud of you
Columns bareme ak video banaye sir (BBS)
morning sir I hav a doubt pls clear me out, in bottom bar bbs u dedect the clear cover of column both side but u didnt do the same In top bar why?
Hello sir
Roof ke down beam( 12"×15") me agar 20 mm 8 ps( 4 up = 4 down) dalte hai to sides me bar dalne cahiye ?
Sir lap k liye 1500-400-50 =1050 hoga or aap 1150 kaise le liye ?????
You are great sir thank you so much
Sir
Minimum distance between lap in column,wall ,beam main &distribution bar me kitni lete h please iske bare me batao please
Very important topic sir good explanation 👍
Excellent
Keya pin top bar ke cut piece k liye bhi dena parega?
Total length of bar=12.4 m sir...btw nice video
Thank you sir
Nice information
I love ur effort for making this type of videos sir ji👍but i hv one doubt sir in end extra bar y u add 1500+350 actually from the drawing 1500is enough but y 350also
No need sir i understand 😊
Sir mujhe Samaj nhi Aya hi 0.15 LD or 0.10 Kya hi or Kaise provide kare
nice one sir
But sir ,200+ 400+ 200 kyo nhi centre bale column ki 200 ,200 deno sides nhi loge kya
Bhai development lenght m colum kaise ghtaynge wo to plus hoga na syd ek baar bhai clear kroge
5:55 pe sir 16 metre kaese possible h wahan 200 mm ko aap 2000 mm add kr diye hain kya ??
12400
200+6000+6000+200 = 12400 not 16000
12400....is correct
M also thinking same,did mistake maybe
Super
Sir please make a video in ms Excel for billing and how to show total bars in column beam and slab as well as stirrup and chair in ms Excel
Sir 50D har drawing men lagta hai Kiya
Hello all this mathematics done by structural engineer right. I mean all details will be in structural plan. Or do you have to calculate on site per beam ?
all on structural plan
Sir Intze water tank ka calculation sikhaye sir
Thank you so much sir
Sir your development length is 1150 but beam height is 500 how that's possible I tried this on our site their beam depth was 700.. plz reply sir
Sir thoda calculation cheak kar liya kijiye start me 16 m kaise ho gya 12m400 mmm hona chahiye tha
Bhai bottom continuous bar ke drawing mei ek side 400-50 kiya hai usmei 200-50 hona chaiye mujhey lagraha hai nahi to lap lenth bhi double kiu nahi kiya
I got cutting length 8.3m while quantity calculation time what I want to consider length 8.3m or 12m ?
Sir tell the clear difference between development length and Anchorage length. Please.
Both are same. No difference
Please make a video on shear reinforcement design for beam (singly and doubly), ductile detailing as per is-456, is-13920.
Okea dnt worry soon keep watching n keep loving
@@civilsitevisit drowning red kar ne ko mil jaigi sir please help me Drawings red
@@civilsitevisit inform sir please call back me drowning red civil engineering diploma construction BBS sikhna hai sir
Sir ap ne jo ld bend kiya hai 400-50 Kyun Kiya hai.......400 ka to column hai to 350 minus hona chahiye....400-50(cover)=350.
Please sir explain...... I am unable to understand.
Development lengths may aap ldx10d.........?
end extra calculated from centre of column and is provided from face of column, is it ok?
Same question and also you put 1500+350 = 1650 , that should be 1850 , but i think it should be 1500+850=2350, let me know if i am right or wrong.
Cuting length of stirrup 3 bent 90 degree and 2 bent 135 degree
Sir Calculation mistake ho gyi
Length is 13650mm
Sir strip calculation k time top m 4 bar kaise aaye jabki hamare pass only 3 continuous bars h top m
6000+(200-cover block)+lap length=6000 + (200-50)+(50*25)=7400mm
Not 7600mm.
200-25 =175 , mm you should take on both columns. Cover 25 mm.
Good👍👍👍
Good sir
Sir apne kaha tha... Development length 50D huga.... But yaha is video me development length ka formula alag hi hai.. Aaisa kyu?
Sir top reinforcement me 200 jo add kiya hai wo kha se add kiya ?
10:12 minutes par jo calculation btao hai vo dubara check kre, 1500-400-50 = 1050,but aapne 1150 kese likha, jo calculation ki hai usme 1500-400-50= 1500-350= 1150 likh hai
Top bar @15:45 pr smjh nhi paa rha hu.
And @21:30 5×2d kyu hua? 4 =90°corner h 2-45° ke h.
thank you sir it is very helpfull.can you send more pdf file of structural drawing of beam for practice of B.B.S
some calculations are wrong but the method is very informative thank you.
yes starting addition