Drone Shots of New Septic System and ASV RT40 Backfilling

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ธ.ค. 2024

ความคิดเห็น • 5

  • @duanemorrison6173
    @duanemorrison6173 ปีที่แล้ว +1

    I appreciate you including the information on contacting the Health Dept. That's a great example of communicating with the inspector to do the best job the right way. Thanks!

    • @NealORussa
      @NealORussa  ปีที่แล้ว

      Hey thanks for the comment! Yes, I believe the better you work with them, the better they work with you.

  • @nathanwoodard7661
    @nathanwoodard7661 ปีที่แล้ว +1

    Question. In your area the drain field lines don’t have to be equal on a gravity system? Or is this a pressure manifold system?

    • @NealORussa
      @NealORussa  ปีที่แล้ว +1

      Hey thanks for the question! This is a gravity system, but it uses hillside boxes or sequential distribution, so the lines do not need to be the same length. Basically there is a hillside drop box at the start of each line and once that line fills up the box fills up and then goes down to the next line and so on. If we use an equal flow distribution system with one central D-box piped to all the laterals, then yes the lines need to be within 10% length of eachother.

  • @ofwoodsandwords4424
    @ofwoodsandwords4424 ปีที่แล้ว

    What road this on?