Coating of a green roof with VIP Polyurea

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ต.ค. 2024
  • The processing of this project in Belgium took place in 3 steps:
    1. Bitumen was prepared and cleaned of any residues that may have an effect to bonding.
    2. Certain parts were primed.
    3. The aromatic Polyurea QuickSpray applied with heated mixing equipment.
    The complete process of surface-preparation and application of the Polyurea System was successfully
    completed in 3 days. Afterwards a green roof was placed on top.