Drainage gutter, FOLDING rubber and Modifications at Crossings / 4K
ฝัง
- เผยแพร่เมื่อ 10 ก.พ. 2025
- Excavation of the foundation for a new concrete gutter, setting of concreting and preparation for packaged. Removal of asphalt and other excavation for gutters. Composing a new crossing and subsequent removal of excess soil.
Machine: Volvo EW160E with Steelwrist X20
Place: Hanušovice
If you like the video, leave a comment .... thanks :)