Part 5 of 5 - The ELF Procedure using ETABS - Comparison with Manual Calculations

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 เม.ย. 2020
  • Part 5 of 5 - The ELF Procedure using ETABS - Comparison with Manual Calculations
    The MS Excel sheet and the ETABS model used in this demonstration can be downloaded from this link below.
    structurespro.info/wp-content/...
    This lectures series focuses on the history, evolution and formulation of equivalent lateral force (ELF) procedure for seismic analysis and design of building structures.
    The part 1 focuses on the history and evolution of ELF procedure in last several decades.
    The part 2 focuses on the formulation of ELF procedure as prescribed in UBC - 97.
    The part 3 focuses on the formulation of ELF procedure as prescribed in IBC - 2000.
    The part 4 focuses on the formulation of ELF procedure as prescribed in Building Code of Pakistan (BCP 2007) - This part is in urdu language.
    The part 5 focuses on a practical demonstration of how the ELF procedure can be applied in ETABS and how the global responses of a building can be computed manually and compared with ETABS results.
    The lectures files can be downloaded from the following link.
    www.dropbox.com/s/wdzwfu9qvpq...
    I hope that this lecture series will be useful for you. Please feel free to contact in case of any query. My email address is fawad.najam@gmail.com.

ความคิดเห็น • 19

  • @Luffy-pu7op
    @Luffy-pu7op ปีที่แล้ว

    Lecture very great

  • @ashfaquenisaransari
    @ashfaquenisaransari 11 หลายเดือนก่อน +1

    I want to thank you for your superb explanation and you sharing the documents.
    جزاك الله خيرا

  • @zinaabduljaleel427
    @zinaabduljaleel427 11 หลายเดือนก่อน

    👍

  • @tajsay
    @tajsay 3 ปีที่แล้ว

    Thank you so much much for the detailed explanation... This is the first time I have seen such in depth explanation.. Appreciate your time and efforts.

  • @farhanrana5833
    @farhanrana5833 ปีที่แล้ว

    Thankyou sir for such an informative lecture on ELF along with its manual calculations.

  • @ansarishanealam3811
    @ansarishanealam3811 3 ปีที่แล้ว +1

    Thank you so much for such deep knowledge and clear explanation video

  • @treft3853
    @treft3853 2 ปีที่แล้ว

    Brilliant
    Thanks sir Fawad

  • @VolkansarkayaTR
    @VolkansarkayaTR 2 ปีที่แล้ว

    Thank you...

  • @muhammad8378
    @muhammad8378 2 ปีที่แล้ว

    Thank you sir

  • @Osama-Anwar
    @Osama-Anwar 4 ปีที่แล้ว

    6:15 What if we have our base underground. Would story range still be from base to top story or from plinth to top story? What if we have a pitched roof would it be included?

  • @muhammad8378
    @muhammad8378 2 ปีที่แล้ว

    Thank you for such comprehensive explanation. The link provided above is not working.

  • @Osama-Anwar
    @Osama-Anwar 4 ปีที่แล้ว

    Isn't 25% Live Load addition is for storage and warehouse occupancies as per Section 1630.1.1?

    • @muhammadawaiskhalid
      @muhammadawaiskhalid 3 ปีที่แล้ว

      I thought so too.
      Consulted a few people. They said its for evey case :/

  • @LodyBasha
    @LodyBasha 2 ปีที่แล้ว +1

    Alsylam alyekom Dr. fawad can you plz make a demonstration using ASCE 7-16 ELF and RSA using ETABS thank you

  • @JUNAID_KHAN708
    @JUNAID_KHAN708 ปีที่แล้ว

    Plz make same play list for rsa using same code

  • @moazkhaled6708
    @moazkhaled6708 3 ปีที่แล้ว

    Can you send me your Excel Sheet please?

  • @wazir252
    @wazir252 ปีที่แล้ว

    No one tell about the time about the time period calculation in this method!