Dock Street to Foot of Leith Walk - Southbound, BEFORE New Infrastructure Autumn 2024

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ก.ย. 2024
  • New cycle lanes are about to be built from Foot of the Walk along Great Junction Street, down Henderson Street, Sandport Place and Dock Street as part of CEC's 'Foot of the Walk to Ocean Terminal' route. You can see the Northbound version of this video here: • Foot of Leith Walk to ...
    This documents the route before the construction of the lanes, filmed Friday 13th September 2024 from 10:20am. This video is shot in realtime, but you can use TH-cam's speed controls to watch the route back faster if desired.
    The last section - from Ocean Terminal to Dock Street - is part of a different project, Leith Connections Phase 3, so the upcoming construction stops at Commercial St. A ridethrough of this route can be seen here: PENDING

ความคิดเห็น •