The front part is removed so that a loco can couple to Train 18 and haul it to N. India for testing. They wont use the Train 18 traction when hauling it. Front is not broken.
@@kalpeshmistry3708 traveling long route must be one of the most important specifications for this train. If this train can run small distance only then how is this different from MEMU.
@@hemant6446for testing any train there are series of tests .... So don't worry long route travel testing will also be done..... So chill and be optimistic....😊
@@hemant6446 a lot of routes are still not electrified. So the Train 18 will only replace the shatabdis on completely electrified routes as of now. Electrification will be completed in a couple of years.
No need. We dont want any flag propaganda. We just want everything to develop and become more fancy. Flags should be put on top of very high buildings but not moving train.
साथियों मैं आपसे एक बात शेयर करना चाहता हूँ । आपमें से अधिकतर लोग जो नियमित रूप से रेल में यात्रा करते रहते हैं तो आपने पाया होगा कि आप करीब एक माह या 15-20 दिन पहले रिजर्वेशन कराते हैं तब भी आपका रिजर्वेशन confirmed नहीं हो पाता है । अब आपका जाना जरूरी है तो आप रिस्क लेकर गाड़ी में बैठ जाते हैं और टी सी के चक्कर काटते रहते हैं और टी सी एहसान करते हुए आपको सीट अलाट कर देता है और आप उसको अतिरिक्त राशि खुशी खुशी भी दे देते हैं । यदि online booking है तो रिजर्वेशन automatically cancel हो जाता है और आप सामान्य टिकट लेकर बैठते हैं और टी सी के चक्कर काटते हैं । लेकिन आप यह पायेगे कि आपका टिकट confirmed नहीं हुआ है लेकिन ट्रेन में बहुत सी सीटें खाली पड़ी रह जाती हैं । इसलिए हमें एक अभियान चलाना चाहिए कि यदि आप ट्रेन में यात्रा कर रहे हैं तो आपके आसपास जा सीटें खाली रह जाती हैं उनकी जानकारी एक मंच पर इकट्ठा की जाये । बाद में संकलित जानकारी IRCTC की वेबसाइट पर उपलब्ध करायी जाये एवं रेल मंत्री तक भी पहुचायें । ताकि उन्हें मालूम पड़े कि किस ट्रेन में किस दिनांक को कितनी सीटें खाली गई हैं । जबकि उस दिन उसी ट्रेन में waiting clear नहीं हुई है । अतः मालूम पड़ेगा कि यह बहुत बड़ा घोटाला है । एक ओर तो सीटें खाली जा रही हैं और दूसरी ओर waiting confirmed नहीं हो रही हैं और यह पैसा सीधे टी सी की जेब में जा रहा है । टी सी के माध्यम से ऊपर तक जाता है । कृपया एक ऐसा प्लेटफार्म बनाये जहाँ हम यह शेयर कर सकें कि किस ट्रेन में किस दिन कितनी सीटें खाली गई हैं । यह लालू के समय का घोटाला है जो अभी तक चल रहा है ।
भारतीय रेलों की गति अब बहुत बढ़ चुकी है । ट्रेन के सामने अचानक कोई जानवर सामने आ जाए तो बड़ी दुर्घटना हो सकती है । इसलिए ट्रैक के दोनों ओर एक जालीदार दीवार खड़ी करने का प्रोजेक्ट शुरू करना चाहिए । इससे रेलो की बड़ी अच्छी ढंग से सुरक्षा हो सकेगी ।
@@hemant6446 They won't run the trial till Delhi, it will just be hauled by a loco till Delhi after that the nose will be attached, then it will be put into to trial between Raebareily and Moradabad.
The front part is removed so that a loco can couple to Train 18 and haul it to N. India for testing. They wont use the Train 18 traction when hauling it. Front is not broken.
Dont agree with you. Then what is the use of this train if it can not travel long distance with itself?
They are testing the train. It is not commissioned for long route traffic
@@kalpeshmistry3708 traveling long route must be one of the most important specifications for this train. If this train can run small distance only then how is this different from MEMU.
@@hemant6446for testing any train there are series of tests .... So don't worry long route travel testing will also be done..... So chill and be optimistic....😊
@@hemant6446 a lot of routes are still not electrified. So the Train 18 will only replace the shatabdis on completely electrified routes as of now. Electrification will be completed in a couple of years.
Waha Gazab Coverage
This is the most beautiful thing I've seen in my life.
Amazing video. I was waiting for the video. Thank you so much for sharing. Mind blowing. Keep in touch always. Happy Railfanning.
yeah
Thank for the video which I was waiting for. Great machine.
All coaches must have Indian Flag👌👍
No need. We dont want any flag propaganda. We just want everything to develop and become more fancy. Flags should be put on top of very high buildings but not moving train.
LOL
@@waffleeater2588 no one asked for your opinion. There WILL be an Indian flag on every coach of this train.
This is India ..Indian Flag should be every possible place..like the American do it.....Jai Hind...Glory to the Indian flag
@@nicolafarrell7649 well said
Look light weight with elegant state of Art
Beautiful...👌👌. Why the front cover removed...it is making it look ugly..
Otherwise the train looks amazing.
Nice coverage.... Whirring sound of Motors
Great shoot 👏👏👏
साथियों मैं आपसे एक बात शेयर करना चाहता हूँ । आपमें से अधिकतर लोग जो नियमित रूप से रेल में यात्रा करते रहते हैं तो आपने पाया होगा कि आप करीब एक माह या 15-20 दिन पहले रिजर्वेशन कराते हैं तब भी आपका रिजर्वेशन confirmed नहीं हो पाता है । अब आपका जाना जरूरी है तो आप रिस्क लेकर गाड़ी में बैठ जाते हैं और टी सी के चक्कर काटते रहते हैं और टी सी एहसान करते हुए आपको सीट अलाट कर देता है और आप उसको अतिरिक्त राशि खुशी खुशी भी दे देते हैं । यदि online booking है तो रिजर्वेशन automatically cancel हो जाता है और आप सामान्य टिकट लेकर बैठते हैं और टी सी के चक्कर काटते हैं ।
लेकिन आप यह पायेगे कि आपका टिकट confirmed नहीं हुआ है लेकिन ट्रेन में बहुत सी सीटें खाली पड़ी रह जाती हैं । इसलिए हमें एक अभियान चलाना चाहिए कि यदि आप ट्रेन में यात्रा कर रहे हैं तो आपके आसपास जा सीटें खाली रह जाती हैं उनकी जानकारी एक मंच पर इकट्ठा की जाये ।
बाद में संकलित जानकारी IRCTC की वेबसाइट पर उपलब्ध करायी जाये एवं रेल मंत्री तक भी पहुचायें । ताकि उन्हें मालूम पड़े कि किस ट्रेन में किस दिनांक को कितनी सीटें खाली गई हैं । जबकि उस दिन उसी ट्रेन में waiting clear नहीं हुई है । अतः मालूम पड़ेगा कि यह बहुत बड़ा घोटाला है । एक ओर तो सीटें खाली जा रही हैं और दूसरी ओर waiting confirmed नहीं हो रही हैं और यह पैसा सीधे टी सी की जेब में जा रहा है । टी सी के माध्यम से ऊपर तक जाता है ।
कृपया एक ऐसा प्लेटफार्म बनाये जहाँ हम यह शेयर कर सकें कि किस ट्रेन में किस दिन कितनी सीटें खाली गई हैं । यह लालू के समय का घोटाला है जो अभी तक चल रहा है ।
Silent engine.... liked it
Beautiful😍😍
Kab start hogi ye train
Window edges should have been rounded that would look better.
भारतीय रेलों की गति अब बहुत बढ़ चुकी है । ट्रेन के सामने अचानक कोई जानवर सामने आ जाए तो बड़ी दुर्घटना हो सकती है । इसलिए ट्रैक के दोनों ओर एक जालीदार दीवार खड़ी करने का प्रोजेक्ट शुरू करना चाहिए । इससे रेलो की बड़ी अच्छी ढंग से सुरक्षा हो सकेगी ।
I agree fencing bolte hai uske vahe
Mera desh badl rha h
Wow awesome video bro and we want to here the horn of this trian
Sure
@@railfanamit4743 Im new subscriber to ur channel
When did this happen?
Which place is this ???
Amazing video. Btw where did the nose of train fall?
Removed so that it can be attached to a loco and hauled till Delhi.
@@sheshl476 I don't understand why will they run the trial till delhi?
@@hemant6446 They won't run the trial till Delhi, it will just be hauled by a loco till Delhi after that the nose will be attached, then it will be put into to trial between Raebareily and Moradabad.
@@sheshl476 is this offical confirmation or just your thinking
@@hemant6446 It's official.
Sooo good updated
I'll be operating it soon...
not bad
Wow
Swiss ki train india m
Train to charming hai
Definitely a turning point for IR
But Front Damaged hai kya?
@@sachinprasad11 okk
insurence hai kya
What location? is it still in Chennai?
Yes