Nice to see the freight flow. We now need a reversal of one of your previous videos "Track Rationalsation at Spalding" to provide enough siding capacity
Thanks for the film Roy. At 2:05 there is a grey Sealand container with a hazard identification board on the front. Do you have a higher resolution view of that so the four-digit number on the board can be read? Thanks.
Roy Harrison brilliant, thanks Roy! 1325 is a generic number used for a flammable solid material that doesn't have a specific identification number yet. Pretty rare to see it being used.
Oh god always love watching these. Another nice one
Glad you like them!
Roy many thanks for another enjoyable video
look forward to your film every month
Glad you enjoyed it John.
@@royharrison4122 always do especially the old videos you have put on line as i remember the best times were the 70's and 80,s
Well compiled Roy. A new month time to get back out there
Thank you David
Looks like the platforms have been block paved...
Looks very neat and lighter too!
Yes Michael, They have done a real good job, just got a shelter on platform 2 to install and the lifts should be finished this month.
Roy Harrison ,
Nice to see the freight flow. We now need a reversal of one of your previous videos "Track Rationalsation at Spalding" to provide enough siding capacity
There is talk of extending the Sidings, will have to wait and see.
@@royharrison4122 That would be a very good thing. I hope it happens and hopefully other freight flows with it
Great vid, Why are the tankers in that siding?
Thanks for the film Roy. At 2:05 there is a grey Sealand container with a hazard identification board on the front. Do you have a higher resolution view of that so the four-digit number on the board can be read? Thanks.
The four-digit number is 1325, I am not sure of the 2 digits at the top it is KC or NC. The lighting was poor at that time so unable to read.
Roy Harrison brilliant, thanks Roy! 1325 is a generic number used for a flammable solid material that doesn't have a specific identification number yet. Pretty rare to see it being used.
Does anybody know when the next lot of diversions will be via spalding as I've been told September but nothing on the timetable
Planned Diversions in connection with the Werrington Project are postponed until January.
@@royharrison4122 OK mate thanks very much do you know what dates they start.
@@zacharyscott1442 16th Jan 2021
@@royharrison4122 is that when they are diverted from the ecml via spalding.
Around minute 4, what is that sort of double engine??
I think you mean the Track Machine in the siding.
Between 3 50 and 4 10 minutes.
@@johndouglas2554 it is a Tamper DR 74002 09-2X Dynamic