How A Railroad Replaces Ties: Part Two, Installation!

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 ก.ย. 2024
  • Ever wondered how railroads install new ties? THIS is how its done, and with the use of an entire track gang! We'll get a neat, up close view, of the entire process, while seeing these cool machines hard at work!
    Watching new ties get replaced is a neat process. It requires an entire traveling track gang, with an entire crew! In this video, we'll see spike pullers, scrappers, tie inserters, tie pullers, track brooms, ballast regulators, and so much more hard at work! With the use of this cool, heavy equipment, the skilled crews on this track gang make things look easy! Watching this entire process unfold along the railroad tracks was neat!
    Instagram: / sd457500
    / sd457500
    / sd457500
    #train #diesel #railway
    Any use of this content without expressed, clear permission is prohibited. For usage, licensing, and other usage, contact me on Instagram at SD457500.
    Copyright 2024 Douglas Hildebrandt, all rights reserved.

ความคิดเห็น • 38

  • @richardcarlson582
    @richardcarlson582 2 วันที่ผ่านมา +5

    I've seen several tie replacement videos and this one is by far the most coherent explanation of how it's done. And that crew were really moving along. Thanks!

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา +2

      @richardcarlson582 . When I worked these 20 years or so ago, we could install around 8000 to 10000 ties a day. This only happens when there are many ties in each mile of track. The more spread out the replacement ties happen to be, the less production you would experience. Walking 15 to 20 miles a day wasn't unheard of with limited tie replacement. Oh and that was when I worked on the wood tie gangs.
      Concrete tie gangs were so much different. New tracks were laid with a huge machine laying on tie at a time under it, while riding on caterpillar type tracks on the front of the machine and the rear ran on the rail that was being forced onto the ties after they were placed on the ground. The huge machine pulled many flat cars filled with concrete ties.

  • @TonyTruth-s9z
    @TonyTruth-s9z 2 วันที่ผ่านมา +3

    Best video of the day. I've seen this locally recently.

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Great to hear! Locally as in the Twin Cities? This same track gang is slowly working east; its so cool to see.

    • @TonyTruth-s9z
      @TonyTruth-s9z 2 วันที่ผ่านมา

      @@SD457500 St. Cloud. The gang has been working on a spur that runs into the western industrial park where the old repair yard and roundhouse once resided.

  • @StormySkyRailProductions
    @StormySkyRailProductions 2 วันที่ผ่านมา

    Awesome part two tie replacement video. Took me back to my railroad days back on the CP. Enjoyed watching once again and have a wonderful rest of your Tuesday. Steve

  • @TomahTrains-s5b
    @TomahTrains-s5b 2 วันที่ผ่านมา +2

    Great video!
    Thanks for sharing!

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Thanks for watching, and great to hear that you enjoyed the video!

  • @lexpo181
    @lexpo181 2 วันที่ผ่านมา

    so cool to see those MOW machineries! Excellent video Douglas! ;)

  • @BattleshipOrion
    @BattleshipOrion วันที่ผ่านมา

    Those tie inserters have so much force, that when the track crew I mentioned some time ago came through, they broke 3 ties in a 150ft span...3 NEW ties....also, as mentioned in my last comment when I came by to read comments, something else kinda maintenance related is that my town is not known for railroad history...CSX kinda changed that, as they donated a 40ft steel sided boxcar ACL 20767 to the Fort Wayne Railroad Historical society...yes, the same people with the NKP 765, and 358. The boxcar was used as a tool car and storage in town for the last 39 years as part of the railroad's maintenance of way department. It sat on a 500ft stretch of abandoned track, the respective switch was taken out after a derailment in the late 70's, early 80's...sometime between then because in what lil' footage of that derailment exists, C40-8w's are used.

  • @lfeco
    @lfeco 2 วันที่ผ่านมา +1

    Enjoyed that. Doing this the old way would have been a hard job.

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Doing this the old way would have been a TASK! Thanks for watching!

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา +2

      @lfeco . Trust me. When I first started at a laborer years ago, we worked on a section crew with other section crews helping. We were required to uninstall and completely install 10 ties per man per day. Absolutely, everything was done by hand. The only thing that we did use that would be considered mechanical was track jacks that you carried from location to location, hand jacked to raise the rails. Everything else was manual labor, including spiking

  • @TrainWork
    @TrainWork 2 วันที่ผ่านมา +1

    Good Stuff👍😁OperateOnOperator

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Glad you enjoyed the video; this was a neat and cool operation to see.

  • @Seaboardsystem-t7e
    @Seaboardsystem-t7e 2 วันที่ผ่านมา

    BNSF seriously needs to do tie replacement on the Hinckley subdivision. Some of the ties on that line are up to 20 years old and railfaning there every day i’ve seen those ties start to show their age for a while now

  • @richardbause2453
    @richardbause2453 วันที่ผ่านมา +2

    You skipped the part on how the plates are reinstalled under the rail using the rail lifter .
    This has to happen "before" spiking can begin. 😮

    • @SD457500
      @SD457500  วันที่ผ่านมา

      Whoooops, I appear to have missed one of the machines. You can see the plates being placed with the track broom though. Hope you enjoyed the video, and thanks for watching!

    • @richardbause2453
      @richardbause2453 วันที่ผ่านมา

      @@SD457500
      The guys walking along pickup the plates and set on end of the ties, the rail lifter follows behind them.
      Those guys lift up the rails and slide the plates under, then comes the spikers.

  • @erict5234
    @erict5234 2 วันที่ผ่านมา +1

    Every time we have a tie gang scheduled for our area, the same routine happens every time... 1st ballast train comes and dumps new rock, then the regulator clears it, tie gang does their jobs and finally a tamper and regulator finishes the job. (I have never not seen the regulator run ahead of the gang.)

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา

      @erict5234 . Must dump rock first because most times a lot of rock either isn't on the track to begin with or the surfacing gang behind the tie gang wouldn't have enough to smooth the track and stabilize it.

    • @erict5234
      @erict5234 2 วันที่ผ่านมา

      @@daveschmitt4499 correct.

  • @RFMCabooseNP1713
    @RFMCabooseNP1713 2 วันที่ผ่านมา

    Cool

  • @BruceBergman
    @BruceBergman ชั่วโมงที่ผ่านมา

    Do they have this equipment in 36" narrow Gauge? asking for Disneyland and Knott's and Cedar Fair 7:43 😊

  • @Bob.W.
    @Bob.W. 2 วันที่ผ่านมา +2

    Thx. What CPKC Subdivision?

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      This is on the Withrow Sub, over in NE Mpls. Thanks for watching!

    • @Bob.W.
      @Bob.W. 2 วันที่ผ่านมา

      @SD457500 Thx. Not familiar with that Sub.

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Think of Shoreham Hill; that area.

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา +1

      @@SD457500. When were they in that area and which direction were they headed

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      @@daveschmitt4499 This was last week, and they were heading east. I *think* they are still heading east towards Withrow or down towards Soo Jct.

  • @kkoch666
    @kkoch666 2 วันที่ผ่านมา

    I bet those machines break all the time. Looks like a lot of maintenance.

  • @Memphisdoug
    @Memphisdoug 2 วันที่ผ่านมา

    What happens if the new tie is too low to the rail?

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา +1

      @Memphisdoug . After the new tie is installed, another machine installs the metal plates between the rails and the ties on both ends, then the tamper comes and tamps the ties tight to the rail. Then the spikers come and spike the rail to the tie.

  • @marksamuel130
    @marksamuel130 9 ชั่วโมงที่ผ่านมา

    So ancient compared to European systems

  • @abecoulter8550
    @abecoulter8550 21 ชั่วโมงที่ผ่านมา

    why not concrete sleepers

  • @daveschmitt4499
    @daveschmitt4499 2 วันที่ผ่านมา +1

    It's called a Tie Gang

    • @SD457500
      @SD457500  2 วันที่ผ่านมา

      Appreciate the feedback on the video; I hope you enjoyed it otherwise!

    • @daveschmitt4499
      @daveschmitt4499 2 วันที่ผ่านมา

      @SD457500 . There was a missing machine. A machine would typically raise the rail so someone or a couple of maintenance of way employees could slide the plates under the rail on each end of the new tie. Back in my day we first used track jacks or pry bars. Then came machines that clamped both rails, a piston jack would raise the rails by pushing down on the ground, then there was a stick like attachment with prongs on the bottom of the stick to place in the spike holes on the outside of the rail to slide the plate under the rail. Then the pistons were released, the clamps unclamped and the machine was either pushed forward to button control, powered forward. And NATURALLY the piece of equipment i showed someone several weeks ago, I can't find now, lol.