BNSF TP03 Tie Gang - See Description for Machine List

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ก.ย. 2024
  • BNSF Tie Replacement Gang, 7/31/14 Coal City, IL
    Equipment (in order)
    Nordco SP2R Spike Puller
    Nordco SP2R Spike Puller
    Racine Anchor Spreader
    Harsco Rail TKO Tie Extractor
    Kershaw 1200 Tie Crane
    Kershaw 1200 Tie Crane
    Harsco Rail TKO Tie Inserter
    Harsco Rail TKO Tie Inserter
    Plasser Nipper Tamper
    Racine Plate Inserter
    Racine Anchor Adjuster (Boxer)
    Nordco CX Spiker
    Nordco CX Spiker
    Kershaw Ballast Regulator

ความคิดเห็น • 65

  • @gregorygoodwin-h6d
    @gregorygoodwin-h6d 3 หลายเดือนก่อน

    Thank you for these videos of MOW. My father did this for Southern Railway for over fifty years. He started out in the 1930s, went through WW2 with a U. S. Army Railway Operating Battalion in the European theater. Resumed MOW work for Southern after coming home . I would sometimes go with him for a day or two if his work was close to home and get to see him work, it was a completely different time and way of things back then.

  • @glennsr.1082
    @glennsr.1082 2 ปีที่แล้ว +2

    What amazes me is the designers of these machines and how they are manufactured and built.

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว

      Awesome engineers, designers, and fabricators.

    • @Adamz678
      @Adamz678 5 หลายเดือนก่อน

      @@RailroadMaintanceofWay Was the 70s/80s the last of the busting ass for tie gangs doing everything by hand? Cause it always amazed me how the hell a crew could get so far laying rail by hand.

  • @johnnycee5179
    @johnnycee5179 ปีที่แล้ว +1

    Where would we be today without all this? The work, the cost is all incredible and they still have about 1700 derailments annually.

  • @MichaelSSmith-hs5pw
    @MichaelSSmith-hs5pw 2 ปีที่แล้ว +4

    In 1969 I worked for Norfolk & Western Railroad out of Moberly, Missouri on an “extra tie gang” we took out old ties & put in new ones, we did about a half a mile or so a day using 5 machines & 28 laborers & Gandy dancers using tie-tongs, tamping bars, claw bars, picks/shovels, rail tongs, lining bars & other tools. The machines in this video did in hours what took us all day to do. We worked 10 hours a day, 5 days a week for a measly $150.00 a week, but hey, in 1969 that was good money. The work in the video seems so robotic, & monotonous & I understand progress from the way we used to do it 53 years ago, but on our tie gang we had the same camaraderie that I felt in the Army. The old way that we worked, joked & sang putting in ties is what they used to write songs about, I never heard any railroad songs about clanging machines!
    🤣🎶✌️🤘👍

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  ปีที่แล้ว +1

      Thats some great history Michael. Thanks for sharing!

    • @MichaelSSmith-hs5pw
      @MichaelSSmith-hs5pw ปีที่แล้ว

      @@RailroadMaintanceofWay 🙏🚂👍

    • @ashc4167
      @ashc4167 ปีที่แล้ว +1

      The camaraderie hasn’t left at all, I got into this after the Army and it is more brotherhood involved in the railroad than this new Army.. They may as well give troops suits, ties and their own cubicles these days! I love railroading!

    • @MichaelSSmith-hs5pw
      @MichaelSSmith-hs5pw ปีที่แล้ว

      @@ashc4167 😁👍👌

  • @jimpowell1802
    @jimpowell1802 4 หลายเดือนก่อน

    Tie Crane was my machine.

  • @Mr.lamusa
    @Mr.lamusa 2 ปีที่แล้ว +2

    Love this video too much, cannot wait for your next video! Thanks!

  • @corinschick8172
    @corinschick8172 2 ปีที่แล้ว +5

    Fascinating. I realize these machines are far from the old days of labor intensive railway gangs, but you can't take away the great skill of these operators.
    I wonder how much track this crew is charged with maintaining and how far they get in a day?

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว +2

      Depending on the number of ties being replaced, this size gang can typically finish a mile of track in one day.

  • @ponyrang
    @ponyrang 2 ปีที่แล้ว +2

    Wow, Hello my friend.. All the best to your channel and hope you have a wonderful day !!!

  • @Take-u6f
    @Take-u6f 11 หลายเดือนก่อน

    Y’all did a lot of work in North Dakota last year and was trying to get a 19A out there because I have buddy who was on your gang.

  • @tjlovesrachel
    @tjlovesrachel ปีที่แล้ว

    I know I was hearing some Detroit’s running… miss that sound man

  • @monsterford8009
    @monsterford8009 2 ปีที่แล้ว +1

    What a neat machine

  • @nellybell7374
    @nellybell7374 5 หลายเดือนก่อน

    I see where each piece of equipment is designed to move on the tracks , but how do they get to where they are going, surely they don't travel great distances do they? It seems like I watched one video where when they were done and ready to go to their next destination they were loaded up on flat bed railcars, is that how it's done?

  • @trainsmachineryldegmtrains3509
    @trainsmachineryldegmtrains3509 2 ปีที่แล้ว +1

    Great work, nice images with machines in action! Thumbs Up & Subscribe
    Greetings from Romania
    Andrew

  • @petermccuskey1832
    @petermccuskey1832 2 ปีที่แล้ว +1

    Great operator's

  • @bincockwell2610
    @bincockwell2610 2 ปีที่แล้ว +4

    The amount of money in maintenance and parts on these specialized machines makes my stomach hurt. Not saying it's not worth it, just comparing it to what u make a year lol

  • @michaelnicholson8405
    @michaelnicholson8405 21 วันที่ผ่านมา

    Not Bad Whats the New Cement Tie's ....as Waight and Longevity. Per Break Down in Year's Till Replacement From Ware. Seen the Metal Post's on an Amtrack Video.

  • @TheBigdog868
    @TheBigdog868 2 ปีที่แล้ว +1

    No Gandy dancers left. They didn't even sing for us

  • @ПавелМакеев-с1м
    @ПавелМакеев-с1м 2 ปีที่แล้ว +1

    В России есть ПРМ-5 каторая только путь рехтует и подсыпку делает.

  • @michaelriggs-gn7jg
    @michaelriggs-gn7jg ปีที่แล้ว

    I work on the railroad and we so everything with a backhoe lining bars claw bars tamper regulator spike driver spike puller hydraulic impact rail saw hydraulic rail drill

  • @esloveniasilva7056
    @esloveniasilva7056 2 ปีที่แล้ว +2

    This is so cool! haha

  • @eugenetswong
    @eugenetswong ปีที่แล้ว +1

    3:22 What does this machine do?

    • @paulohernandez3289
      @paulohernandez3289 11 หลายเดือนก่อน

      The machine is called an anchor spreader. It spreads the anchors, so the new tires can be placed in easier.

  • @subhranshuganguly2246
    @subhranshuganguly2246 2 ปีที่แล้ว +1

    In India we use only concrete sleepers. Are we more advanced.?

    • @rickmurray8473
      @rickmurray8473 ปีที่แล้ว +3

      Hahaha! Can't laugh enough! Just because you use concrete (!) 'sleepers', you rant you are 'advanced'!
      May be, in corruption and lawlessness, if not squalor and poverty, you can claim that position!

  • @lalbahaduryadav163
    @lalbahaduryadav163 2 ปีที่แล้ว +1

    Good

  • @stephenswift5531
    @stephenswift5531 2 ปีที่แล้ว +1

    I like this but how can you tell from the old to the new railroad ties

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว

      Most railroads will paint mark the ties needing replacement before the gang comes through. Many of the ties are date stamped, so they get replaced at the end of their projected service life, regardless of condition.

    • @stephenswift5531
      @stephenswift5531 2 ปีที่แล้ว

      @@RailroadMaintanceofWay oh okay that makes sense

    • @stephenswift5531
      @stephenswift5531 2 ปีที่แล้ว

      @@RailroadMaintanceofWay but how do you know when it's time to replace them

    • @stephenswift5531
      @stephenswift5531 2 ปีที่แล้ว

      @@RailroadMaintanceofWayokay because the tie gang for the union Pacific railroad comes out to replace the railroad ties in Salem Oregon

  • @nray8888
    @nray8888 2 ปีที่แล้ว +1

    Good video, but I think you have the gang number wrong.

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว

      TP03 is what I have from my records. Any idea what it might be?

    • @nray8888
      @nray8888 2 ปีที่แล้ว

      @@RailroadMaintanceofWay I’m not sure what gang that is, I just know TP03 doesn’t have open cab spreaders or squeezers.

  • @tin2phutrn975
    @tin2phutrn975 2 ปีที่แล้ว +1

    🤩🤩🤩🤩🤩

  • @nancylynch6045
    @nancylynch6045 2 ปีที่แล้ว +3

    This is so cool!

  • @Алексей-ж5у7к
    @Алексей-ж5у7к 2 ปีที่แล้ว +2

    фигня какая! все автоматизировано, тяжелой работы нет и погода хорошая
    а у нас в дождь и снег вручную все это делается, а из автоматизации лом и лопата!

  • @danvanhoose6783
    @danvanhoose6783 2 ปีที่แล้ว +1

    Neat operation.what happens to the old spikes and plates?

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว

      Most railroads reuse the plates. Spikes are typically picked up with a magnetic drum and recycled.

    • @davidwillard7334
      @davidwillard7334 2 หลายเดือนก่อน +1

      Have you not heard of Metal Recycling ??

  • @subhranshuganguly2246
    @subhranshuganguly2246 2 ปีที่แล้ว +1

    Also the line is not electric traction.

    • @rickmurray8473
      @rickmurray8473 ปีที่แล้ว +2

      So what? 'Electrified lines' don't make a poor, backward country developed. Do you know that?
      How many of you have access to safe, potable water? And reliable medical care? And of course, nutritious, wholesome food? And finally, clean sanitation?

  • @zitel-zemli0671
    @zitel-zemli0671 2 ปีที่แล้ว +2

    О лядь! Даже биосортир с собой! Причём со смывом! О как! Не то что мы в ближайший лесок, и кормить комаров своей голой задницей! 🤣🤣🤣

  • @moulayelmahdiyoussoufi7875
    @moulayelmahdiyoussoufi7875 2 ปีที่แล้ว +1

    🤔❤

  • @surjaboronongthombam826
    @surjaboronongthombam826 2 ปีที่แล้ว +1

    ''2'

  • @helenasenderowska1698
    @helenasenderowska1698 2 ปีที่แล้ว

    Iq

  • @ashwinsekar8150
    @ashwinsekar8150 2 ปีที่แล้ว +1

    .

  • @robertomalley7056
    @robertomalley7056 2 ปีที่แล้ว +2

    How long does it take to replace 1 mile of ties? And how many ties are there per mile?

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว +2

      A good gang can finish 2 miles of track in a 8 hr shift. Wood ties are spaced at 19.5 inches (nominally), so there are about 3400 ties in a mile. Only 20 to 40% of the ties get replaced though, otherwise the track geometry would be disturbed too much.

    • @gudeliaruvalcaba
      @gudeliaruvalcaba ปีที่แล้ว

      @@RailroadMaintanceofWay buena información

  • @chrisfaulkner3840
    @chrisfaulkner3840 ปีที่แล้ว

    I see these here in Oklahoma but never paid attention to how do things

  • @railsaw
    @railsaw 2 ปีที่แล้ว +1

    As i remember ALL work was to stop when a passing train went by and that the workers were to do a watch on the roll by. What happen to safety?

    • @RailroadMaintanceofWay
      @RailroadMaintanceofWay  2 ปีที่แล้ว +1

      Some railroads do stop work, depending on the track limits and type of work being performed. In this case, the spacing of the parallel track and the type of work deemed it safe to continue as long as the parallel main was not fouled.

  • @KevinRichards-my5oj
    @KevinRichards-my5oj 5 หลายเดือนก่อน

    It's cool to see all of that track maintenance equipment.

  • @johnnycrash3270
    @johnnycrash3270 2 ปีที่แล้ว +2

    Grappler lines up the new ties NOW that operator IS GOOD AT HIS JOB