  • When we want to construct new home, we want to think about " Material Contract and Labour Contract ". Which contract is best for to construct the house. Iam covered all clarifications.
    Please SUBSCRIBE every one
    Thank you
    #materialcontract
    #Labourcontract
    #materialcontractvslabourcontract
    #bestoptiontoconstructhome

ความคิดเห็น • 280

  • @chandrasekharpola
    @chandrasekharpola 3 ปีที่แล้ว +6

    చాలా మంచి valuable information అందించారు, thank you Sir

  • @srspprakashrao8278
    @srspprakashrao8278 ปีที่แล้ว +6

    Excellent analysis.Very clear about the construction of building.It is very useful to unknown non technical people
    Thank you so much.

  • @rishikaananthu3532
    @rishikaananthu3532 2 ปีที่แล้ว +2

    Thank you very much for giving good information about house construction.

  • @venkatbachu5828
    @venkatbachu5828 2 ปีที่แล้ว +2

    Thank you sir chala Baga explain chesaru

  • @ganeshpunna5122
    @ganeshpunna5122 2 ปีที่แล้ว +1

    Namaskaram sir
    Chala valuable information icharu sir

  • @jagadeshwary
    @jagadeshwary ปีที่แล้ว +2

    చాలా బాగా చెప్పారు sir 👍👍👏

  • @narayanarameshgupta1773
    @narayanarameshgupta1773 2 ปีที่แล้ว +1

    Thank you sir,
    Very valuable information 👌

  • @p.padmaahilapriya8824
    @p.padmaahilapriya8824 ปีที่แล้ว +2

    Excellent explanation/Analysis.

  • @SRIKANTH...
    @SRIKANTH... 8 หลายเดือนก่อน +1

    Very good content. This use full me..

  • @rajanipandikunta7000
    @rajanipandikunta7000 2 ปีที่แล้ว +1

    GD evening sir tnq soo much u r valueble information ...

  • @nallaballesuresh1934
    @nallaballesuresh1934 5 หลายเดือนก่อน +1

    Good Explanation & its very useful sir..👍

  • @daringman2382
    @daringman2382 2 ปีที่แล้ว +1

    Thank you sir.
    Very useful information

  • @adityajobcreativechannel5480
    @adityajobcreativechannel5480 ปีที่แล้ว +3

    Neat and clean explaination thank u andi

  • @ramanjineyulut7807
    @ramanjineyulut7807 19 วันที่ผ่านมา +1

    Chala tqs sir 🎉🎉🎉 🙏🙏🙏

  • @sarakas2850
    @sarakas2850 3 ปีที่แล้ว +3

    చాలా మంచి ఇన్ఫర్మేషన్ ఇస్తున్నారు సార్ మాకు

  • @jaladhijagadeeswari6976
    @jaladhijagadeeswari6976 ปีที่แล้ว +1

    Very useful sir. Thank you

  • @madhavachary9518
    @madhavachary9518 ปีที่แล้ว +2

    Good information thanks 👌👌👍

  • @rupkumark
    @rupkumark 2 ปีที่แล้ว +4

    Thank you very much for a very enlightening talk. Kindly comment on GST in both labour contract vs material contract.

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      For labour work we can avoid GST, but we want pay GST in material contract. Because maximum cash payments in labour contract.

  • @Mr996677
    @Mr996677 3 ปีที่แล้ว +1

    Hai sir...good worthy information...

  • @seetaramaraoapuru4377
    @seetaramaraoapuru4377 2 ปีที่แล้ว +1

    Nice presentation sir.

  • @novahenterprises4186
    @novahenterprises4186 ปีที่แล้ว +1

    Good information given sir

  • @datlasatyanarayanaraju9683
    @datlasatyanarayanaraju9683 2 ปีที่แล้ว +1

    Good information sir thanks

  • @gowrinaidu7714
    @gowrinaidu7714 ปีที่แล้ว +1

    Thanks for information Sir 👍

  • @ciatmakur3520
    @ciatmakur3520 2 ปีที่แล้ว +1

    Thank you very much

  • @ciatmakur3520
    @ciatmakur3520 2 ปีที่แล้ว +1

    Good suggestions sir

  • @rasamallaashok761
    @rasamallaashok761 ปีที่แล้ว +1

    Good Explained

  • @syedahmadullahqadri5875
    @syedahmadullahqadri5875 7 หลายเดือนก่อน +1

    Very good information

  • @SandeepKumar-pq6ht
    @SandeepKumar-pq6ht 2 ปีที่แล้ว +2

    super explanation sir

  • @nagalakshmigooty4935
    @nagalakshmigooty4935 2 ปีที่แล้ว +1

    Nice explanation

  • @rameshgagulothu7108
    @rameshgagulothu7108 6 หลายเดือนก่อน +1

    super sir God bless you sir

  • @mdfaizullah5432
    @mdfaizullah5432 2 ปีที่แล้ว +1

    Good awarness

  • @praveenpaspula1362
    @praveenpaspula1362 ปีที่แล้ว +1

    Baga chaparu sir

  • @vijaykumarmaredlavijay1329
    @vijaykumarmaredlavijay1329 2 ปีที่แล้ว +1

    Good material good quality constructions NV HOMES AND CONSTRUCTIONS HYDERABAD

  • @nageshwarraopilli9568
    @nageshwarraopilli9568 2 ปีที่แล้ว +1

    Thank you

  • @nagalakshmigooty4935
    @nagalakshmigooty4935 2 ปีที่แล้ว +1

    Thank you sir

  • @rajuakkireddy4824
    @rajuakkireddy4824 2 ปีที่แล้ว +1

    Thank you sir your guidelines

  • @pondratinarasimhulu1828
    @pondratinarasimhulu1828 5 หลายเดือนก่อน +1

    Nice explain

  • @pranithamalkareddy3952
    @pranithamalkareddy3952 3 ปีที่แล้ว +1

    Very useful information SIR

  • @chinninarasimha241
    @chinninarasimha241 2 ปีที่แล้ว +1

    Excellent explantion.

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      Thank you sir

    • @karthikkumarrao5740
      @karthikkumarrao5740 2 ปีที่แล้ว

      @@SrinivasuluReddyManaEngineer g+3 30 *50 material (first class) material contract entha varaku అవ్వచ్చు sir. 🙏 Thank you

  • @srinivaskunchala7177
    @srinivaskunchala7177 ปีที่แล้ว +2

    Good Evening Sir, Thakedar ko Bill dethe samay Concrete components ka Measurement kaise hoga, jaiseki PCC: Footing, Ground/Plinth Beam & RCC: Columns, Beams and Stairs- Tappa including or Excluding Mid-landing that too only labor, i.e. without material.

  • @s.y.krishna1203
    @s.y.krishna1203 ปีที่แล้ว +1

    Nice explanation sir..
    Sir please advice to give plan for 30*30 sft 100 gajalu north facing g+1 House

  • @yakubyakub-vo5hz
    @yakubyakub-vo5hz ปีที่แล้ว +16

    మెటీరియల్ కాంట్రాక్టు ఇవ్వొద్దు చీప్ కోలిటీ తెచ్చి కట్టేస్తారు

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  ปีที่แล้ว +4

      అవును..... కానీ అందరికీ కట్టికుంచుకొనే టైం ఉండదు కదా అండి....అల అని అందరూ క్వాలిటీ లేని మెటీరియల్ వాడారు.
      మనలో కొందరు మంచివారు వుంటారు అలాగే చెడ్డవారు ఉంటారు. కాంట్రాక్టు కు ఇచ్చేటప్పుడు చూసుకోవడమే.
      ధన్యవాదాలు సార్

  • @model875
    @model875 3 ปีที่แล้ว +8

    gd evening sir...Material contact lo total house complete ayye varaku boomi puja nundi gruha pravesham varaku yelanti precautions teesukovalo oka video pettandi sir...pkz

  • @tenglisuryanarayananarayan7334
    @tenglisuryanarayananarayan7334 หลายเดือนก่อน +1

    Super sir తంక్ య్ అన్న

  • @rkchemistry6041
    @rkchemistry6041 3 ปีที่แล้ว +3

    Please explain about Slab construction🚧🚧 in 110 square yards

  • @darshanalaramesh6068
    @darshanalaramesh6068 4 หลายเดือนก่อน +1

    Good sir

  • @punnipalliprakash6634
    @punnipalliprakash6634 ปีที่แล้ว +1

    Owenars currect metiriyal techukunte mestri vest yeami cheyaru Andi.....ela cheppi mestri la meeda Doubt pettakandi,,,mestri metiriyal tho thisukunna work correct ga chestunnaru Andi,,,, estimated yeami istaro Andulone Building complete chestaruru..... owenars High metiriyal vadu Ante yela, first estimated prakaram Building complete chestaru

  • @shankarachary8309
    @shankarachary8309 2 ปีที่แล้ว +1

    👌👌

  • @RamuPasupuleti-vu4yu
    @RamuPasupuleti-vu4yu 2 หลายเดือนก่อน +1

    Good

  • @Suryanarayana.K
    @Suryanarayana.K 9 หลายเดือนก่อน +1

    Good video 🍎🍎🍎🍎

  • @shyamsundarareddy8516
    @shyamsundarareddy8516 10 หลายเดือนก่อน +1

    Nice narration. In nandyal iam constructing commercial. Labour cont only. It sq ft labour300₹.material contract 1400₹ saying. Doubts may icallu.

  • @eswararaokunisetti4695
    @eswararaokunisetti4695 3 หลายเดือนก่อน +1

    Adhi best sir

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  3 หลายเดือนก่อน

      Depends on our free time...
      1). If we have free time, go with labour contract.
      2). If we have no time but required quality and technical execution required, we go with engineer based contract (execution)
      3). We don't have time to see the construction, go with material contract.
      Thank you sir

  • @user-zq3ud7bh2g
    @user-zq3ud7bh2g 8 หลายเดือนก่อน +1

    Nice description. For only slap plasting how much cost it take by material and labour

  • @constructions5642
    @constructions5642 3 ปีที่แล้ว +1

    Sir warck chesetappudu elevalki. Enta parsantaz.of
    Mani daggara undali.

  • @jakkulakumaraswamy7080
    @jakkulakumaraswamy7080 ปีที่แล้ว +1

    Good information sir,,
    26*36 2bhk kattukovadaniki entha karchu avutundi sir

  • @ravip-ss2fm
    @ravip-ss2fm 2 ปีที่แล้ว +1

    🙏🙏

  • @vijayagowrisaripalli9870
    @vijayagowrisaripalli9870 2 ปีที่แล้ว +12

    లేబర్ కాంట్రాక్ట్ సరైన ఎంపిక..మీ ఇళ్ళు కట్టుకునేటప్పుడు మీరు బయటకెళ్ళి ఉధ్ధరించేది ఏమీ ఉండదు..

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว +2

      😊😊😊
      Depends on their profession , always own execution is better. But present workers, materials supplier are gambling more in the market. So, want to take the risk also....

  • @chandubasha7495
    @chandubasha7495 2 ปีที่แล้ว +1

    Hi sir memu (slab ) 32×42 ki entha material entha quantity kavali telupagalaru
    Steel
    Cement
    Sand
    Wood
    Electric
    Plumbing
    Paint
    Etcetera......

  • @autocarupdatesveer6364
    @autocarupdatesveer6364 2 ปีที่แล้ว +3

    Sir labour contract lo cement mixer machine and poles boxes and vibrater yevariki samandam

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      మనం మాట్లాడుకున్న దానిని బట్టి ఉంటుంది. మెటీరియల్ contract అయితే మాత్రం అన్ని పనులు బిల్డర్ చేస్తాడు

  • @indukanjarla2420
    @indukanjarla2420 ปีที่แล้ว +1

    Hi Sir nenu illu kattuko botunna
    Intiki srichakra cement Best na Lela maha cement best na telupagalaru

  • @shakarbunny9677
    @shakarbunny9677 2 ปีที่แล้ว +1

    Anna naname sheker 2022 lo Mestri rate antha indala
    Sun flowe r pack et rate 200 .undii

  • @nagarajuraju4066
    @nagarajuraju4066 ปีที่แล้ว +11

    Labour contract pettukoni, oka watchman pettukovadam better entha busy unna meterial contract ivvadam waste

  • @aavulasreenu1725
    @aavulasreenu1725 ปีที่แล้ว +1

    Thank you sir for best information about house construction

  • @narasimulup6402
    @narasimulup6402 2 ปีที่แล้ว +1

    Sir my plot size 25*40 correct ground level undi 40 feet length 12 feet depth undi construction avidanga cheyali good plan ivvandi sir please

  • @manjukirthana
    @manjukirthana ปีที่แล้ว +1

    Good evening sir
    18*50 east facing construction cost entha avthundi single floor.

  • @thetransferaccount4586
    @thetransferaccount4586 27 วันที่ผ่านมา +1

    manchi information icharu sir good good

  • @chinninarasimha241
    @chinninarasimha241 2 ปีที่แล้ว +4

    Sir, I am an AGM in SBI. Planning to renovate my house built on 216sy land. It is not as per vastu. It is built with pillar construction 30 years before. Can I renovate the house using existing structure. If so what would be the cost per sft if I give it on material constract by using good quality material. House is in Hyderabad.

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      Please send your house and contact details to sreenirman2020@gmail.com.
      Thank you

    • @RoomRestore
      @RoomRestore 2 ปีที่แล้ว

      We will take all services

  • @abhilashgoud9136
    @abhilashgoud9136 ปีที่แล้ว +1

    28×40 dimension.g+1 total 2000 sft...total entha amount avtundi sir

  • @shiningmoon9306
    @shiningmoon9306 2 ปีที่แล้ว +1

    Hello Sir,
    We want to construct a G+1 commercial complex in 24 ft(width) x 134 (Depth)ft land . Can you please give me best plan and also construction cost.

  • @jaferhussain4920
    @jaferhussain4920 2 ปีที่แล้ว +1

    3sent lo simpal ga endlu kattu kowalante anta kharchu wastundi

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      10 లక్షల వరకు అవుతుంది
      ధన్యవాదములు

  • @krishnareddye9285
    @krishnareddye9285 11 หลายเดือนก่อน +1

    How much variation of building cost between labour contractor and metirial contractor

  • @talluriramamurthy3686
    @talluriramamurthy3686 25 วันที่ผ่านมา +1

    Sir meterial contract lo yela caliculate chestaru? Ma house ki 1stfloor mottam 1700 afugulu vaste, velldu vakkati exta 700 feets vadtundi. Mestri velludu kooda meterial contract prakaram amont pay cheyya lantunnadu. House mottam 34 lakhs aite, velludu ki 14 laks avutundi. Idi yela sir?

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  8 วันที่ผ่านมา

      ఆది మనం మొదలు మాట్లాడుకున్న దాని మీద ఆదరపడుతుంది

  • @bathulagoverdan4509
    @bathulagoverdan4509 ปีที่แล้ว +1

    Hello sir owner pending unna amount evvakunda ibbandi pedthunnadu e problem ki konchem emaina solution evvandi sir please..

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  ปีที่แล้ว

      రోజూ ఇంటికి వెళ్ళి అడగటమే...
      ధన్యవాదములు

  • @pavaniveeranala
    @pavaniveeranala ปีที่แล้ว +1

    30*60 ground floor shops and 1st floor two 2 bhks cost enta avuthundhi sir

  • @rjnaturastar4026
    @rjnaturastar4026 11 หลายเดือนก่อน +1

    Sir 1 feet ki brick and plasting cheyyadaniki antha rate untundi present 2023 lo

  • @rameshbossety504
    @rameshbossety504 ปีที่แล้ว +1

    Sir 19*49 lenth 100 gajalu G+1 construction cost enthavutundi sir

  • @srinivasareddyjeeru5052
    @srinivasareddyjeeru5052 2 ปีที่แล้ว +1

    Sir, plan apprual ela apply cheyyali

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      మీకు దగ్గరిలో ఉన్న మున్సిపాలిటీ/ గ్రామపంచాయతీ లో అడగండి, లేదా మీకు లైసెన్స్ పొందిన సివిల్ ఇంజనీర్ కలిస్తే సరిపోతుంది.

  • @imranshaik5880
    @imranshaik5880 11 หลายเดือนก่อน +1

    Sir , what is amount of money need to pay for project manager/engineer for execution of a housing project

  • @seedaralaprameela4687
    @seedaralaprameela4687 2 ปีที่แล้ว +1

    Namaste sir,
    Iam retired doctor from Gandhi hospital.bad luck for me as i couldn't watch ur vedios when I started my building construction at kondapur with labour contract innocently.now iam in the middle of the Ocean (construction).Can u suggest me experienced,sincere engineer on salary basis to complete my construction plz

  • @kohlivinod3428
    @kohlivinod3428 2 ปีที่แล้ว +1

    Sir 400 sqft material contract aithe antha avuthundi

  • @reddyramakrishna257
    @reddyramakrishna257 3 หลายเดือนก่อน +1

    Material manchidi

  • @ramaraokkomara9528
    @ramaraokkomara9528 3 ปีที่แล้ว +1

    Sir, please explain about WPC is suitable for doors and windows are not.

  • @Mr996677
    @Mr996677 3 ปีที่แล้ว +1

    Sir what is the rate in market for metirial contract per sft ... proximately...

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  3 ปีที่แล้ว +5

      1400 నుండి స్టార్ట్ అవుతుంది 2000 పెట్టుకుంటే చాలా బాగుంటుంది, ఏదయినా మనం వాడే మెటీరియల్ మీద ఆధారపడి ఉంటుంది.

    • @Mr996677
      @Mr996677 3 ปีที่แล้ว +2

      @@SrinivasuluReddyManaEngineer thaks for reply sir...na lanti entho mandi kotta INTI kalaki...entho use ayye vedios meeru ilage chestu vundandi sir....mem Mee venakala vuntam.....👍👍 Mee explanation chala saralanga....simple ga baguntadi sir....🙏

    • @jettiveerakumar358
      @jettiveerakumar358 2 ปีที่แล้ว

      Sir refer me any material contractors in Guntur

  • @sareddy752
    @sareddy752 ปีที่แล้ว +1

    Sir NMR is good for construction of house

  • @sridharatkapurapu5235
    @sridharatkapurapu5235 2 ปีที่แล้ว +1

    1300sft metirieal contract esthe karchu avhhundhi laber contac esthe entha avthundhi

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      Material contract అయితే 20 lakhs వరకు అవుతుంది. The cost is purely depends on specification.( What materials we are using).
      Labour contract అయితే sft (slab area) కి 250 నుండి 300 వరకు ఏరియా ను బట్టి తీసుకుంటారు.

    • @chinninarasimha241
      @chinninarasimha241 2 ปีที่แล้ว

      20 lakhs lo wood work(wardrobes & Madular kitchen) kuda vastunda?

  • @raghunathreddy3330
    @raghunathreddy3330 5 หลายเดือนก่อน +1

    Sir nenu private employee ne naku antha experience ledu nenu material contract edam anukuntuna amantaru sir please guide me

  • @raghunathreddy3330
    @raghunathreddy3330 5 หลายเดือนก่อน +1

    Total ha altra teck vadocha sir

  • @anjidhanavath53051
    @anjidhanavath53051 ปีที่แล้ว +1

    Sir will you send me g+1 plan of 29×64 size plot

  • @G.TSreedharKumar
    @G.TSreedharKumar 5 หลายเดือนก่อน +1

    What percentage of amount difference between two contracts

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  5 หลายเดือนก่อน

      Depends on your involvement.
      If you are spending more time in materials purchase, you can save more.
      And avoiding wastage, you can may some more. Purely depends on you.
      Thank you sir

  • @laharirachapalli743
    @laharirachapalli743 ปีที่แล้ว +1

    Tirupati lo construction cheyali 48 ankanas cost how much sir. G+1

  • @ramarani4659
    @ramarani4659 4 หลายเดือนก่อน +1

    Sir give s plangor 36- 36 plot size we want t we o bedroom house

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  4 หลายเดือนก่อน

      Please send your plot & your details to sreenirman2020@gmail.com
      Thank you sir

  • @shekar0093
    @shekar0093 2 ปีที่แล้ว +1

    Sir what is N. M. R. Contract

  • @suhanaelectricals
    @suhanaelectricals 2 ปีที่แล้ว +1

    సార్ తాపీమేస్త్రి లేబర్ sft contract తిసుకునపుడు టైల్స్ ఎవరు వేయాలి
    ఎలివేషన్ వర్క్ కూడా అదే contract లొ
    వస్తుందా

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      అది మీరు రాసుకున్న అగ్రిమెంట్ మీద ఆధారపడి ఉంటుంది. మీరు రాసుకున్న కాగితంలో ఉంటే చేయాలి

    • @suhanaelectricals
      @suhanaelectricals 2 ปีที่แล้ว

      Thankyou sir

  • @arjunraogali7353
    @arjunraogali7353 ปีที่แล้ว +1

    Sir 1. 5 sentu lo 5 laks lo house ela kattukovalo cheppara please sir

  • @tenglisuryanarayananarayan7334
    @tenglisuryanarayananarayan7334 หลายเดือนก่อน +1

    ఎంత వుంది రెడ్డి గారు మెటీరియల్ కాంట్రాక్టు తీసోకుంట్యే,

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  หลายเดือนก่อน

      1600 నుండి ఎంతవరకైనా పెట్టుకోవచ్చు
      దన్యవాదములు

  • @user-bs3dr8jj3m
    @user-bs3dr8jj3m 5 หลายเดือนก่อน +1

    Material contractor, any salary is expected after completion of construction?
    Or he gets profits from materials only....?

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  4 หลายเดือนก่อน

      In any contract, either labour or material there is no scope of salary, if mentioned in agreement. Contract itself add their margin.
      Thank you

  • @shankarachary8309
    @shankarachary8309 2 ปีที่แล้ว +1

    Sir good evining 800sft entha avthundhi cheppandi

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว +1

      పది నుండి పన్నెండు లక్షలు అవుతుంది

    • @rajuragalla1507
      @rajuragalla1507 2 ปีที่แล้ว

      @@SrinivasuluReddyManaEngineer Sir good morning 1089Sft ( 121 sq yards) లో ఇల్లు కట్టాలి అంటే 2022 లో ఎంత వరకు ఖర్చు అవుతుంది ..తెలంగాణ రాష్ట్రము, రాజన్న సిరిసిల్ల జిల్లా....

  • @shekar0093
    @shekar0093 2 ปีที่แล้ว +1

    Sir me videos ravatham ledu I'm waiting for next videos

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  2 ปีที่แล้ว

      కొంచెం పని వత్తిడిలో వుండి చేయలేకపోతున్న , చేస్తాను.thanks alot

  • @ramaraokkomara9528
    @ramaraokkomara9528 3 ปีที่แล้ว +8

    మీ వీడియోలు చూసిన తరువాత కొన్ని విషయాలు తెలిశాయి. Material కాంట్రాక్ట్ కి తీసుకున్న వారు, వాటన్నిటినీ fulfill చేయరని అనుకొంటున్నాను. నిర్మాణానికి సంబంధించిన ముఖ్యమైన సందర్భాల్లో నే వారు site ని సందర్శిస్తుంటారు. మెటీరియల్స్ rate కాస్త ఎక్కువ పెరిగితే , గిట్టుబాటు కాదని అగ్రిమెంట్ కంటే ఎక్కువ తీసుకొంటున్నారు. మీ వలన మెటీరియల్ కాంట్రాక్ట్ లేకుండానే ఇల్లు కట్టగలను అనే ధైర్యం వచ్చింది.

    • @SrinivasuluReddyManaEngineer
      @SrinivasuluReddyManaEngineer  3 ปีที่แล้ว +8

      మీరు చెప్పిన విషయాలు యదార్ధము, కానీ ఇబ్బందులు రెండూవైపులా వున్నాయి. మంచిగా పని పూర్తిచేసిన తరువాత డబ్బులు ఇవ్వకుండా తిప్పుతున్న యజమానులు చాలా వున్నారు. ఏదయినా ఇద్దరు కరెక్ట్ ఉంటే అంతా మంచిగా జరుగుతుంది. మంచిగా లేకపోతే labour contract కి ఇచ్చి బాధ పడేవాళ్ళు చాలానే ఉన్నారు, ఒప్పుకున్న మేస్త్రి చేయడు ఎవరిని రానివ్వడు, ఏమైనా అంటే యూనియన్ అంటారు. మెటీరియల్ కాంట్రాక్టర్ కన్నా మేస్త్రి (labour contractor) వలన ఆగిపోయినా బిల్డింగులే చాల వున్నాయి.
      మీకు పూర్తి కాళీ సమయం ఉంటే మంచి మేస్త్రీలను రోజువారీ కూలికి పెట్టుకొని చేఇంచుకోండి. వారానికి ఒక్కసారి డబ్బులు ఇచ్చి సంతకం తీసుకోండి.. మీ ఇష్టప్రకారం పనులు చేసుకోవచ్చు. అగ్రిమెంట్ లేదు కాబట్టి no union no demands and no stops

    • @ramaraokkomara9528
      @ramaraokkomara9528 3 ปีที่แล้ว

      @@SrinivasuluReddyManaEngineer thank you sir

    • @sankararjun7303
      @sankararjun7303 3 ปีที่แล้ว +2

      20*30 east face house ki Material and labour contract ki ఎంత అవుతుంది. బడ్జెట్ లో....చెప్పండి బాబాయ్... from kadapa

    • @lakshminarayanabhimavaram1224
      @lakshminarayanabhimavaram1224 ปีที่แล้ว

      @@SrinivasuluReddyManaEngineer ur number

    • @MALLESH1000
      @MALLESH1000 ปีที่แล้ว

      ​@@SrinivasuluReddyManaEngineer Excellent 👍

  • @hanumeshbabusangu4343
    @hanumeshbabusangu4343 2 ปีที่แล้ว +2

    are you providing any services