- Volumetric Analysis of WBM Material | Volumetric Analysis of WBM Coarse Aggregate and Screening Material | Volumetric Analysis of WBM GR-II
Measurements Of Thickness In Roads Construction As Per Morth Norms
Our previous Videos link For Highway Engineering is given below please checkout:
Rise & Fall Method Level Calculation in Excel | Surveying
• Rise & Fall Method Lev...
Counter Flow Asphalt Drum Mix Plant complete procedure | Asphalt Mix Production
• Counter Flow Asphalt D...
Calculation of Road Levels in MS Excel | Level Calculation in MS Excel
• Calculation of Road Le...
Height of Instrument in Levelling | Theory & Concept | Surveying
• Height of Instrument i...
Pavement Design Part-1 | Traffic Survey Calculation As per IRC SP:72-2015 Code
• Pavement Design Part-1...
Temperature of Bituminous Mixes | Use of Remixing Transfer Vehicle | Highway Engineering
• Temperature of Bitumin...
what is toe width | how to calculate road toe width | formation width of road
• what is toe width | ho...
Formation Level in subgrade Layer & Its Determination for Earthwork calculation
• Formation Level in sub...
Difference between WBM and WMM | Water Bound Macadam | Wet Mix Macadam
• Difference between WBM...
There are some videos related to Highway Engineering-------Links are given below
What is Toe Width, Formation Width, Carriageway and Shoulders in road | How to read Road Drawings
• What is Toe Width, For...
Gradients in Road | Type of Gradient | Purpose of Gradient
• Gradients in Road | Ty...
What is Prime coat, Tack coat and Seal coat in Pavement
• What is Prime coat, Ta...
Bitumen Types , uses & Properties | Bitumen emulsion | Cutback Bitumen
• Bitumen Types , uses &...
How to calculate Camber for Road surface | How to check Camber for road
• How to calculate Cambe...
Water required for compaction | Calculation of Soil quantity from borrow area
• Water required for com...
Type of Pavements | Pavement Layers | Load Transfer Mechanism | Differences in Pavements
• Type of Pavements | Pa...
Tender Process |Online Bid Submission for Tender | E Procurement Tender Process
• Tender Process |Online...
Drawings used in Highway Engineering | Drawings Attached in Estimate of Roads | Road Estimation
• Drawings used in Highw...
What is T Junction & Chak Road | Role in Estimation | Quantity Calculation | Highway Engineering
• What is T Junction & ...
What is Open Graded Premix Carpet | OGPC | Bituminous Surfacing | Highway Engineering | Quantity
• What is Open Graded Pr...
What is Kerb & Channel Drain | Traffik & Monoblock Drain | Estimation of K.C. Drain
• What is Kerb & Channel...
How to calculate earthwork for roads| Calculate earthwork in filling and cutting | Highway Engineering
• Earthwork in road cons...
Also follow our Social media network for more information
/ civilpitamaha
/ 34332. .
/ civilpitamah
/ admin .
t.me/Civilpitamah
www.civilpitam...
Our Website is
www.civilpitam...
#civilengineering #Highwayengineering #Civilengineer #Civilpitamah #Roadconstruction
Very informative video sir
Zabardst sir ji 👍👍👍👍👍👍👍
Thank you sir ji
Great sir
Sir. Good evening.. Please guide if we have boxes of size 25*25*40cms after obtaining material from pit 50*50*7.5cms screening is separated now how many boxes are required 2 or 3 for volumetric analysis. as pr your video
forrfor
Thanks very soon we will clear through our video
Wow..
Very nice
Good Morning Sir,
What is the pit depth ?
Is it 100 mm ?
Nice sir
Grading 1 and grading 3 are selected for surface on which base ...how will we come to know grading 1 should be used here??
Thank you sir
Welcome
Density wbm?
Wbm grade 2 mai screening kaun si sieve use hoti hai.
For WMB Grade-2 (53 mm to 22.4 mm) ,Type B 11.2 mm screening is used,
Approximate Quantities of materials of Screenings Required for 75 mm Compacted thickness of WBM for 10m2 Area will be 0.18 to 0.21 m3