Kemajuan terkini Lebuhraya Pan Borneo Sabah Pakej Kerja 28 Menaiktaraf Jalan dari Sandakan Mile 32 ke Moynod (21.7KM) #lebuhraya #sabah #sabahmajujaya #jkrsabah #kkr
from my observation , there were about 60 heavy vehicles and machineries working on scene of WP29 . Compared with WP28 there were only 20++ machineries seen on the scene and most of them were not working . if the wp29 can make the works running , why the PKM has failed to show some comparable progress ? dont tell me the weather problem because wp29 is just beside. another disaster would be WP30 . Both of them are pure local contractor . Kalau expertise tak cukup , why not forming JV to extend the expertise ?
minta maaf cakap, kalau local contr tidak boleh pakai kenapa paksa juga? . apa salah nya bawa masuk kontraktor luar semenanjung, sarawak. Sampai kiamat tidak siap highway tengok kontraktor yang tidak peform begini.
sbb cable . i saw the tender documents with list of quotations , but the company name were hidden. i believe some contractors were bidding with lower value but incomplete job scopes , then requested for VO later on , by delaying the projects. the penampang flyover projects was a joke. it has turned into a sick project due to needs of additional allocation to relocate the utilities. how come this was not anticipated during the tender process. something very wrong here.
Kalaulah begini pace progress daripada dulu x jg rugi kerajaan ambil kontraktor yang kompeten..
Bagi la yang boleh buat kerja, Sri jutaya asas nikmat yang habis paling awal.
Wow..terbaik.lah ..byk kemajuan sdh
from my observation , there were about 60 heavy vehicles and machineries working on scene of WP29 . Compared with WP28 there were only 20++ machineries seen on the scene and most of them were not working . if the wp29 can make the works running , why the PKM has failed to show some comparable progress ? dont tell me the weather problem because wp29 is just beside. another disaster would be WP30 . Both of them are pure local contractor . Kalau expertise tak cukup , why not forming JV to extend the expertise ?
Bro pakej 28 ni company mana? Pakej 29 pembinaan kekal mewah ka? Diorg mana pengalaman buat lebuh raya oooo. Kalau maintanance mungkin la
Terbaik
Kalau tgok ni teringat jalan pan Borneo di Sarawak dulu banyak jalan selekoh.. sekarang jalan sdh siap x ada lagi selekoh bahaya
tulah semoga pan borneo sabah fasa 1 siap sepenuhnya. fasa 1 siap pun dah cukup alhamdullilah
mana Pakej Kerja 01 dan 02 ?
minta maaf cakap, kalau local contr tidak boleh pakai kenapa paksa juga? . apa salah nya bawa masuk kontraktor luar semenanjung, sarawak. Sampai kiamat tidak siap highway tengok kontraktor yang tidak peform begini.
sbb cable . i saw the tender documents with list of quotations , but the company name were hidden. i believe some contractors were bidding with lower value but incomplete job scopes , then requested for VO later on , by delaying the projects.
the penampang flyover projects was a joke. it has turned into a sick project due to needs of additional allocation to relocate the utilities. how come this was not anticipated during the tender process. something very wrong here.
Kroni mahu makan juga boss ini kn malaysia apa mahu hairan
tulah bawak masuk naim holding dari sarawak masuk. kerja tip top
@@amirism91 naim belum tiptop kalau bab construction shin yang baru tip top…sebab gamuda join venture sama naim semasa buat pan borneo Sarawak
Ni lah masalah kalau guna local contractor. Syarikat kekal mewah belum ada pengalaman buat lebuhraya begini luas.
so slow? Alr end of feb 2024 still single carriageway with 2 lanes. Existing road damage everywhere. Aiyooo
plan memang nk buat 2 line je ke?