Post Weld Heat Treatment (PWHT) on ASME VIII Div.1 Pressure Vessel - API 510, API SIFE & ASME Exams
ฝัง
- เผยแพร่เมื่อ 21 เม.ย. 2020
- Bob Rasooli explains about Post Weld Heat Treatment (PWHT) requirements on ASME VIII Div.1 Pressure Vessel which is a typical exam question on ASME, API 510 pressure vessel inspector and API SIFE (source inspector fixed equipment) Exams and includes heating rate, cooling rate, holding time, overlap and heating uniformity etc.
Link to API 510 Pressure Vessel Inspector Online Training Course: www.inspection-for-industry.c...
Link to API SIFE - Source Inspector Fixed Equipment Online Training Course: www.inspection-for-industry.c...
Link to ASME Online Training Course: www.inspection-for-industry.c... - วิทยาศาสตร์และเทคโนโลยี
مرسی مهندس لذت بردیم
Well explained and easy to understand. Thanks
to calculate cooling/ heating rate you say based on nominal thickness while UCS-56 say maximum thickness of shell or head
Thank you Bob!
Great information!
What is the minimum thickness for mandatory PWHT
Thank you sir
Good job👍
Nice sir ji