Design-Build Secant Compression Ring - Soilmec SR65

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ต.ค. 2024
  • A Doublestar Drilling design-build secant compression ring shoring & excavation at the North Interceptor Sanitary Trunk Project in St. Albert, AB. Using our Liebherr LB36 and Soilmec SR65 to install 200 880mm diameter piles. All the piles were interlocked to provide decreased permeability of ground water into the shaft.

ความคิดเห็น • 3