BTS 2023-11 Lecture: Hinkley Point C - Marine Works: Connecting Tunnels Under the Bristol Channel

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 ก.พ. 2025
  • Speakers:
    Christoph Huber - Agent Steel Structures : Tunnel Shaft Connection, Balfour Beatty
    James Long - Principal Engineer : Temporary Works Coordinator, Balfour Beatty
    Internal-Ring-Propping (IRP) is nothing out of the ordinary and used on many projects to support the main tunnel while excavating a cross-passage. However, Balfour Beatty’s IRP system for Hinkley Point C Offshore Connections, which sits just 20,000 mm under the Bristol Channel, is one of a kind.
    In their presentation, James Long and Christoph Huber will give an overview of the Tunnel-Shaft Connections and share their journey through the requirements for the design, manufacturing, and installation phase of this unique propping-system at Hinkley Point C.
    Disclaimer : All opinions and views expressed by the speakers, including those participating in the Q&A, are their own and do not necessarily represent the views of the British Tunnelling Society or the Institution of Civil Engineers.

ความคิดเห็น • 1

  • @MarkBates566
    @MarkBates566 ปีที่แล้ว

    15 minutes is terrible whoes going to stay behind that extra 5 minutes when high pressure water is cascading in