Hazardous waste Authorisation and Renewal Process | Enterclimate

แชร์
ฝัง
  • เผยแพร่เมื่อ 24 ส.ค. 2023
  • #Hazardous #Waste (#Management, Handling, and Transboundary Movement) Rules were notified in 2016, which is the presently applicable rules under which the hazardous waste authorisation and its renewal is done.
    These rules strongly emphasise the accountability of everyone involved in activities such as collecting, storing, packaging, transporting, processing, recycling, recovery, pre and co-processing, transfer, or disposal of hazardous waste.
    Now one should note that hazardous waste produced by industries and activities such as
    mining
    E-waste recycling
    Rubber waste recycling
    has been distinctly addressed under the Hazardous Waste Rules 2016. Furthermore, the waste from hospitals and HCF can be categorised as solid waste biomedical waste and hazardous waste depending on the chemical composition of the waste. In addition to this, the Rules also govern the unit that handles, disposes or need permission for the transboundary movement of hazardous waste. After the amendment in 2022. Schedule IX was added to the rules introducing Extended Producer Responsibility (EPR) to tire waste. tire producers and tyre waste recycling businesses are governed by these rulesand now EPR obligations for tyre manufacturers, importers, brand owners and retreaders along with their waste management targets have been added to the rules.
    Let's take this discussion further to understand Who requires this Hazardous waste management AuthorizationSo the list can include
    • Industrial units generating, collecting, receiving, storing, transporting, treating, disposing or handling hazardous and other wastes
    • Laboratories and service stations for vehicles storing or using hazardous substances and having a regular hazardous wastes generation like spent chemicals and solvents, chemical or oil contaminated filters or cloth, chemical or oil-bearing residues, etc.
    • Units/godowns/warehouses of hazardous substances (i.e. pesticides, medicines, etc.) having a regular generation of contaminated, discarded or off-specification materials.
    • Units engaged in the Hazardous Waste recycling units and other wastes
    • Units providing service of reception/ collection/ storage/ transport/ treatment/ disposal of Units tyre waste, bio-medical wastes or hazardous wastes.
    Now for businesses falling under the list that was just mentioned, the business owner must know about the
    Hazardous waste Authorisation and the renewal process.
    The process for Hazardous Waste Authorization renewal involves the following steps:
    1. Apply to the SPCB in Form I.
    2. The application must accompany the "consent to establish" and "consent to operate" documents.
    3. Ensure that all the required documents are attached to the application. An authorised individual should sign these documents.
    4. Submission of completed application at the OCMMS portal of SPCB/PCC form and supporting documents to the appropriate state pollution control board.
    5. Once the Board reviews the submitted form and documents, the authorisation will be granted if they meet the required criteria.
    Documents required for Hazardous waste Authorisation renewal
    For the Hazardous Waste Authorisation renewal, the necessary documents include:
    • A covering requisition letter showing the status of the industry & activities.
    • Details of any changes in the quantity of trade effluent/ sewage generated and disposal mode indicated against in the consent order (If applicable).
    • Details of production capacity and actual products manufactured (if applicable) month-wise during the last 2 financial years.
    • Details ofthe emission quantity and number and height of chimney/stacks indicated against in the original consent order (If applicable).
    • Latest Analysis report of the treated trade effluent/ sewage samples (If Applicable)
    • Details of the name or in management Board of Directors (If applicable).
    • Latest Pollution Analysis report of the AAQ, Stack Monitoring, and Noise Level (As applicable).
    • Compliance report on the latest consent or renewal of CTO order conditions stipulated under the Water & Air Acts issued.
    • Compliance report on the conditions of the latest HW Authorization /BMW issued (If applicable).
    • Latest Audited Balance Sheet/Auditor’s certificate showing Current Assets, Fixed Assets and Current Liabilities. and details of the last bill (If applicable).
    • Details of Paymentand mode of payment of Consent fee under the Water and Air Act.
    • Complete details of systems for Zero Liquid Discharge and details of land in case of on-land disposal and the photographs (If applicable).
    Know more : enterclimate.com/hazardous-wa...
    Phone:- 92893 79710
    Email:- info@enterclimate.com
    Want to know more about #Enterclimate​?
    Website: enterclimate.com/
    Facebook: / enterclimate
    Twitter: / enterclimate
    Instagram: / enterclimate
    LinkedIn: / enterclimate

ความคิดเห็น • 4

  • @Mohammad_Bhai.
    @Mohammad_Bhai. 5 หลายเดือนก่อน

    Hii sir nice video ❤❤

  • @amulya20
    @amulya20 9 หลายเดือนก่อน

    Nice

    • @enterclimate1698
      @enterclimate1698  9 หลายเดือนก่อน

      Thank you for the appreciation. Stay tuned and Subscribed to the Channel.

  • @Mohammad_Bhai.
    @Mohammad_Bhai. 5 หลายเดือนก่อน

    Sir wt is APR document in hazardous waste n wt is the requiredment for making APR document please tell sir...