For your note at 4 minute 35 seconds - tremie in concrete shall be 3m. Because sometime you need to move the tremie up and down to ensure proper flow. There can be a slush of 1m+ on top so if u keep tremie in concrete 0.5m, actually u might end up pouring fresh concrete in the slush layer. I do not have any intention to criticize your video. I am working in India and Singapore since 21 years and I just wanted to have a healthy engineering conversation.
hi, do you think piling is must for every land where soil is weak? please explain. which pile is more cost effective. what will the cost of each pile? i have a land with heavy ground water leaking .
For your note at 4 minute 35 seconds - tremie in concrete shall be 3m. Because sometime you need to move the tremie up and down to ensure proper flow. There can be a slush of 1m+ on top so if u keep tremie in concrete 0.5m, actually u might end up pouring fresh concrete in the slush layer.
I do not have any intention to criticize your video. I am working in India and Singapore since 21 years and I just wanted to have a healthy engineering conversation.
Very good piling operation. Safety taken. Sairam.
Which company doing pile work
Cover block c/c spacing kitni honi chahiye pile work .
Yh kounse code mentioned hai . ?
Jankari me h to btave 👍
Great work sir
You are so talented sir
can you tell me which structure are they building?
Very nice sir 👍
How to know level concrete position at blind borepile when filling concrete? I mean, what sign that?
Volume of pour / area of bore = height developed from bottom
hi, do you think piling is must for every land where soil is weak? please explain. which pile is more cost effective. what will the cost of each pile? i have a land with heavy ground water leaking .
is it necessary that pile foundation should reach up-to rock
planning to build a three story building
DMC METHOD OF PILING....
Please sir bridge se related aur video bhi upload kijeye sir ji
I started again 🙏
Good one Brother. Thank you.
Sir,It is educational before going to start work on site.
Give me company address please??
outsranding presentation
thank you
Nice one bro, Thank you.
Keep uploading videos sir
Machine operator ki salary kya hoti hai..
nice
good
Hi Sar. I am TMR provitar.
Hi sir I AM Ager pile contractor
Agar pile kajer khobor nai dada