Excellent video. Am seeing this machine everyday now near my home as they build an elevated light rail transit system. Wondered what the machine did. Now I know.
В мультяшке смотрится красиво,чисто,аккуратно)))А в Реале-это очень грязная работа,мокрая и холодная.Эта технология применяется на севере,а у нас в Сибири просто буры шнековый на базе камаза и грунт глина,просверлили,вставились армопояс и залили бетоном,вот и весь сказ.
Ну для сарая в сибири и шнек сойдет. А вот все мосты , тоннели сроятся с приминением технологии с обсадными трубами. В москве практически отказались от забивных свай.
Why do they need to install the casing till the end of the hole? They can just install the casing for the first 20 ft or so, then drill the remaining hole without casing. The soil at depth more than 20 ft will be highly compressed because of the weight of the soil on top of it. Thus, it will not collapse to inside the hole even if there is no casing. Anyone can explain for me plz?
Thanks Nikki Briones for your comment. But they did not do any dewatering from the casing. Also, they left the casing segments piece by piece while the concrete is still in its fresh state. So, I'm not really sure if it's related to contamination. What do you think?
Depending to the strata of soil as per soil investigation reports. Sometimes the soil below 20 ft. is sandy, sure they will provide casing in order not to collapse.
Bauer are working on a new road project in my home town, seems the rock is much harder, than what was expected, so they are months behind on the work involved, very interesting to watch, but progress is slow .
Lets say 20 years the 3 foot wide concrete pillars rebar is rusted away and along comes a nice earth quake that shatters the 60 to 90 foot pillars. Would you not have been wiser to use wider footers to account for load conditions of the soil in the first place. I guess my question is what is the life expectancy of the pillars under normal load and was earthquakes ever factored in.
Ramón Rousse, Yes, the Engineer will most likely know from the Site Geo-technical Drilling Report of the presence of significant amounts of ground water, and adjustments can be made to either the concrete mix type and/or the pouring technique to account for the groundwater.
Its done to support the building from the hard strata below the ground. Some soil will not have sufficient capacity to hold buildings so piling is done. Also its not just cement, they actually put a steel cage inside.
Is it just me or is there a lot of time where if two rigs had room to operate side be side the operation could be done more swiftly. Granted I know little about the actual methods etc
Hi, I'm looking to get advice from the drilling rig experts here. How many hours can be BG25 run on before needing new engine rebuild? What is the maintenance cycle? Per how many hours should maintenance be performed? Thank you
Super animation can't be more clear than this thanks for uploading 🙏
Красивая видюшка жаль в жизни все это по другому происходит!
Khoan này tiêu chuẩn... Chứ chơi mũi khoan kia kỹ sư đền mũi khoan với bị đuổi việc...đéo hiểu tại sao gãy mũi khoan 😂😂😂
Excellent video. Am seeing this machine everyday now near my home as they build an elevated light rail transit system. Wondered what the machine did. Now I know.
In Pointe Claire, Qc ?
Good job👍. would like to suggest to use a casing clamp during the casing pipe extracted to avoid the downside pipe drop.
je pense que il est très difficile de retirer le tubage apres durcissement du beton
В мультяшке смотрится красиво,чисто,аккуратно)))А в Реале-это очень грязная работа,мокрая и холодная.Эта технология применяется на севере,а у нас в Сибири просто буры шнековый на базе камаза и грунт глина,просверлили,вставились армопояс и залили бетоном,вот и весь сказ.
Ну для сарая в сибири и шнек сойдет. А вот все мосты , тоннели сроятся с приминением технологии с обсадными трубами. В москве практически отказались от забивных свай.
Точно, шмотки отбиваю молотком от бетона после работы.этот способ бурения применяется в основном для высоток.
KEREN BG
Bauer bg 39 very nice machine I am opareting bg 39
Excellent machine. What is the minimum & maximum diameter and depth for this machine?
1500 максимум, минимум 600
Hi, we are from China, manufacturing foudation drilling tools/accessories. any needs?
Давай начни!, где вода начинается с 3-ех м. и щебенка идет ПОПРОБУЙ!
да не, эта штука как раз там и нужна, здесь обсадная труба самое важное, остальное и садовым буром на руси делают...
very nice
Why do they need to install the casing till the end of the hole? They can just install the casing for the first 20 ft or so, then drill the remaining hole without casing. The soil at depth more than 20 ft will be highly compressed because of the weight of the soil on top of it. Thus, it will not collapse to inside the hole even if there is no casing. Anyone can explain for me plz?
Monir Alhadid to also avoid contaminating any groundwater i think.
Thanks Nikki Briones for your comment. But they did not do any dewatering from the casing. Also, they left the casing segments piece by piece while the concrete is still in its fresh state. So, I'm not really sure if it's related to contamination. What do you think?
Depending to the strata of soil as per soil investigation reports. Sometimes the soil below 20 ft. is sandy, sure they will provide casing in order not to collapse.
Excellent graphic demonstrations. This is different than what I saw they used compressor hammer.
Bauer are working on a new road project in my home town, seems the rock is much harder, than what was expected, so they are months behind on the work involved, very interesting to watch, but progress is slow .
I work in this field. There are places in Algeria. We dug fifty meters
Не үшін бетон құйды дым түсінбедім
Столько обсадок без стола?
Lets say 20 years the 3 foot wide concrete pillars rebar is rusted away and along comes a nice earth quake that shatters the 60 to 90 foot pillars. Would you not have been wiser to use wider footers to account for load conditions of the soil in the first place. I guess my question is what is the life expectancy of the pillars under normal load and was earthquakes ever factored in.
Sent here from a DB video on Stuttgart 21 where this method is currently used. Thanks, nice animation!
la maldicion de la isla
Parabéns ms precisar aperfeiçoar uma bomba sungando enquanto cava jogando direto no caminhão de casanba ok
a
รถเจาะบาดาลก็ได้
I have a long experience in this job. Lovely and hard job
Where you from, i want to talk about rig machine
que potencia hace falta?, y sin mencionar dureza del terreno.
👍💞😞
Bast
Nice
Nice
Im bauer Indonesia
видео о том, как большой дом прибить большими гвоздями к поверхности
เจาะลงกลางถนน
Робив.на.такі.бг36.
Awesome video. Simplifies the caisson system.
А где гидростол
Informative
What if the steel pipe and concrete stuck together?
HOW IT IS POSSIBLE WHEN CONCRETE IS STILL IN LIQUID STATE?
Nice video
Sou brasileiro apaixonado por tecnologia menos trabalho ms produção parabéns moro n acre
26/5000
What video is the software made of?
без рыжих канализационных труб не заработает
Excellent job super
الياباني japan Japanese hlw sir howr you
какой "супер"???
ковшебур не закрыл.
дретейлер к пустой обсадной не прикрепил.
дилеанты этот мультфильм делали.
الياباني japan
الياباني 日本語 japan b
ok
Good job
👍👍👍
Vorige week nog het slot gat opgelast van de los klep
Sehr informationsreiches Video. Super.
☝️🤙👍
Now i'm thinking how long will they do this for the construction of Tower M in Malaysia using Bauer BG 72
👍👍👍👍
Enjoyed watching this. I love heavy machinery.
Eric T
ardi
Eric T ค้ยทนัคร่สิ้ท
วาวๆๆๆๆๆๆ
Is the same procedure used when there is water in the subsoil?
Ramón Rousse, Yes, the Engineer will most likely know from the Site Geo-technical Drilling Report of the presence of significant amounts of ground water, and adjustments can be made to either the concrete mix type and/or the pouring technique to account for the groundwater.
How i can buy of this machine
bom video bom trabalho parabens pelo video
how much cost is this machine?
Good working
fantastika realno. Xochu takuiu Molodci Nemci
Before I work this !
Music???
Долго
Можно ускорить ☝️с верху
How close together can these boreholes be placed.
make a video to safe a child from that bore well.please.in lot of place the small child is dieing
Be Sirius
Excelent video!
Ну чем не искуство
super
VERY GOOD VIDEO
Exellent video
How i buy of it
How much per month?
DEPENDS ON YOUR CONTRACT :D
Good work
BAUER 💪
On if
👍
good
Висит на тросу что его крутит кардана не видно
так ротор его и крутит 😊
روعه
ไทย บาวเออ
夯实✨📜
verygood...
Video is great
No need for vibro hammer?
Excellent job superb
护筒放到底?
What i saw was a whole digged and filled it back with cement
Its done to support the building from the hard strata below the ground. Some soil will not have sufficient capacity to hold buildings so piling is done. Also its not just cement, they actually put a steel cage inside.
5555
Bauer is two match good I'm opretty in bauer
Mustafa inbox your number plzzz
Is it just me or is there a lot of time where if two rigs had room to operate side be side the operation could be done more swiftly. Granted I know little about the actual methods etc
nice video...Thanks. We can also do this job...aha..
Awesome video!!!
.
Hi,
I'm looking to get advice from the drilling rig experts here.
How many hours can be BG25 run on before needing new engine rebuild?
What is the maintenance cycle?
Per how many hours should maintenance be performed?
Thank you
If you need to own a BG25 you don't ask for maintenance needs on TH-cam. Call the dealer instead.
@@epistte Maybe it is a student assignment etc...
@@joshuas3456 According to the Bauer website the BG 26 has a Cat engine. All the specs are listed there.
I love your careers
☝️
🤔🤔🤔
Lesson Learn and knowledge the construction technical
decent quality, my daughter loved it
Этот агрегат, в день зарабатывает 200т р!!!.
За одну сваю.