Schneider APC E3MUPS80KH Installation done at Kadam Hospital, Biwani, Haryana By VS Creators, New Delhi-110043, Victor Masih-8826740003, victor@vscreators.com, www.vscreators.com
@@Apcschneider07thanks but i ask about the battery configuration for each ups in this case for example .i have 2 string connected common each one 100 AH.
Buenas noches, en la parte de las conexiones de la barra de baterías en el UPS (+, N, -) , ese neutro es derivado de mi batería numero 21??, contemplando que mi banco de es de 40 baterías. Se agradece la respuesta y saludos.
please could you provid me with document for common battery setting ( 2UPSs connected parallel). thanks
Yes dear two ups one battery bank (common battery bank use) but encloser box two ups saprate will use. Thanks Victor Masih 🙏
@@Apcschneider07thanks but i ask about the battery configuration for each ups in this case for example .i have 2 string connected common each one 100 AH.
Buenas noches, en la parte de las conexiones de la barra de baterías en el UPS (+, N, -) , ese neutro es derivado de mi batería numero 21??, contemplando que mi banco de es de 40 baterías. Se agradece la respuesta y saludos.
Hello. what password to configure the battery?
How many batteries will 40kva use and the Ah per battery and the voltage
Share phone number
How much backup
Schneider easyups 40kv/kw used the 32 to 40 nos of battery
Ok pls how many Ah battery and the voltage of each battery tnka fr the reply respect 🙏
Supported the easy ups 40kva (42AH12V TO 150AH12V)
15 MIN 42AH12V 36 NOS , 30MIN BACKUP 65AH12V * 40 NOS
Odisha se
Installation sapota milega
Sir apka phone number
Yes sir but how much kva
Sir kuchh problemme sapotkarnekelia
Plz share picture and video for the ups problem. Then resolve (company of ups and capacity of ups)
Possible my channel subscribe and like with share