What is Curing? How to Cure Concrete /Cement?

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ธ.ค. 2024

ความคิดเห็น • 9

  • @vijayaraghavanayyaru3349
    @vijayaraghavanayyaru3349 ปีที่แล้ว +1

    Can u please tell me minimum days fir plinth beam , basement column , basement brickwall curing days

    • @jrsconstructiontips
      @jrsconstructiontips  ปีที่แล้ว

      It is better to allow to cure for 7 days before starting next activity above those.

  • @vijayaraghavanayyaru3349
    @vijayaraghavanayyaru3349 ปีที่แล้ว +1

    In my site after footing column next day back filled soil that is ok ,

    • @jrsconstructiontips
      @jrsconstructiontips  ปีที่แล้ว

      There is nothing wrong in backfilling next day..but proper care should be taken so that columns are not disturbed by any means. Backfilling with JCB could be very risky. Operator accidently hitting the JCB bucket on column could lead to serious damage.
      Hw was the backfilling done? Manual or JCB?

  • @gopalanp6810
    @gopalanp6810 ปีที่แล้ว +1

    Terrace water leakege iruku under construction veedu sir concrete potu 1month completed leakage stop panna mudiyuma

    • @jrsconstructiontips
      @jrsconstructiontips  ปีที่แล้ว

      Yes panna mudiyum. "Injection grouting" method try pannalaam. Unga house endha area LA irukku?

    • @gopalanp6810
      @gopalanp6810 ปีที่แล้ว

      Near madhavaram chennai

    • @jrsconstructiontips
      @jrsconstructiontips  ปีที่แล้ว

      @@gopalanp6810 OK fine. I am also living in Chennai only. If possible please send me an email with your phone number to tipsjrs@gmail.com. Will try my best to provide reliable solution to your problem.

  • @KumarSEngineering
    @KumarSEngineering ปีที่แล้ว

    உங்கள் கைபேசி எண் கிடைக்குமா?