Fixing Your Branch Line: Waterbury Branch

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 มิ.ย. 2022
  • Since I covered my home railroad for the first episode of this series, I might as well cover the LIRR's sister railroad just over the Long Island Sound: Metro North. After reviewing multiple branch lines, I ultimately decided to choose the Waterbury branch due to its unique history, rolling stock assignments, and having the most opportunities for improvement. This branch is also one of the few examples of where it's actively being improved in recent months due to newly acquired funding, so it will be interesting to see this branch grow over the next few years.
    Credit for all photos used go to their original photographers
    All music used in this video is from the TH-cam Audio Library.
    Copyright Disclaimer under Section 107 of the copyright act 1976: allowance is made for fair use for purposes such as criticism, comment, news reporting, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.
    Sources:
    waterburythoughts.blogspot.com...
    Rails of the East: / sid8317
    SPV2000 cab leading - By Jon-Lewis - spv2000 as cab cars and coaches, CC BY-SA 2.0, commons.wikimedia.org/w/index...
    CDOT GP40 - By Jon-Lewis - CDOT 6699 GP40-2H with SPV2000 coaches, June 2003, Waterbury, CT, CC BY-SA 2.0, commons.wikimedia.org/w/index...
    Metro North FP10 - By Joe Mabel, CC BY-SA 3.0, commons.wikimedia.org/w/index...
    Seymour siding - By Joe Mabel, CC BY-SA 3.0, commons.wikimedia.org/w/index...
    Beacon Falls station in September 2018 - By Pi.1415926535 - Own work, CC BY-SA 3.0, commons.wikimedia.org/w/index...
    Waterbury Platform - By Daniel Case - Own work, CC BY-SA 3.0, commons.wikimedia.org/w/index...
    Ansonia station - By Mitchazenia - Own work, CC BY-SA 3.0, commons.wikimedia.org/w/index...
    Music Used:
    Greaser - TrackTribe
    American Idle - RKVC
    Fractal of Light - Chris Haugen
    Bright Eyed Blues - Unicorn Heads
    Modern Attempt - TrackTribe
    Exhale - Jeremy Blake
    Down The Street Blues - Unicorn Heads

ความคิดเห็น • 70

  • @anthonykukla5384
    @anthonykukla5384 ปีที่แล้ว +18

    I almost died of laughter when he said "Look at this station in this quaint little town..."

  • @chrismercaldo7604
    @chrismercaldo7604 2 ปีที่แล้ว +21

    I live right along the Waterbury line and that’s what sparked my interest in trains as a kid. The biggest issue to me with the line is the lack of ridership. There’s just not enough reason to take the train if you live along that branch line right now. Certainly connections to New York and Hartford would help but I actually think a new station which serves the Sikorsky/Lockheed Martin aircraft plant would give the greatest impact. If they built a station across the river from the factory in Milford, they could utilize the existing footpath and pedestrian access the bridge near the factory offers to connect the factory and the station. It would allow people to easily commute to work by train and increase ridership, giving the line a greater purpose in the network. Connecting the population centers along the coastline to Sikorsky seems to be a huge opportunity for Metro-North. Maybe my proximity to the line makes it an obvious idea for me but I’m surprised this hasn’t been discussed anywhere yet to my knowledge

  • @cathiwim
    @cathiwim ปีที่แล้ว +3

    I grew up here! Went to Naugatuck High School and lived in Beacon Falls! It only takes 30 minutes todrive the entire route! For a reward for getting on the honor roll in 1968, my dad took me on the train from Naugatuck to NYC. He grew up in Brooklyn, and we spent an entire day in the city! Its the only time in my life I’ve actually been there!!

  • @daviiiid.r
    @daviiiid.r 2 หลายเดือนก่อน +1

    As someone who grew up on the PV line (in NJ but still) thank you for recognizing us, the saddest line on NJT (in my opinion)

  • @DC4260Productions
    @DC4260Productions 2 ปีที่แล้ว +15

    I've learnt an awful lot about the branch thanks to this video. Incidentally I think it's silly that the original Waterbury station building isn't used by trains anymore. It's a shame that neither Danbury nor Waterbury are included on the New York to New Haven route in Train Simulator, yet the New Canaan branch is included.
    Beacons Falls has to be the strangest station on this line. I've rarely seen platforms that tiny; looks like they'd only be able to fit one door on there (like at Berney Arms in England).

    • @cathiwim
      @cathiwim ปีที่แล้ว +4

      Beacon Falls was created as a bedroom community and housing for US Rubber employees. My father worked at the Naugatuck plant, and we lived on South Circle in BF. I didn’t think the tracks were anything but freight, and passenger from Waterbury to Naugy and south. A lot of infrastructure was wipes out in the hurricanes and floods that followed.

  • @ScottPalmer-mp1we
    @ScottPalmer-mp1we ปีที่แล้ว +3

    If anything was short-sighted, it was the abandonment of the Meriden & Waterbury Railroad (though some of the topography was uncooperative). This could have been a nice east-west route roughly through part of the median of our rectangular state. There is a piece of that old route with old tracks still in place through Baldwin Park in Meriden.

  • @MosheFeder
    @MosheFeder 4 หลายเดือนก่อน +1

    As a new resident of Naugatuck who is a longtime railfan, I naturally take a great interest in the line's past, present, and future. So your excellent video couldn’t have been more satisfying to me if you'd known I was waiting for something like it.
    The relatively low ridership always has me worried about the branch's sustainability. I'd certainly like to see it double tracked and electrified, but I think the first priority is restoring service to Hartford. A line that could bring commuters to Hartford would both strengthen the branch's raison d'etre and benefit every town in the Naugatuck Valley, making them even more appealing as bedroom communities. After that, the next logical step would be electrification and direct service from Grand Central to Hartford via Waterbury. A one-seat ride to GCT without the transfer at Bridgeport would be a boon to everyone in the Valley as well as to New York-bound travelers from Hartford.

  • @StephenCarlBaldwin
    @StephenCarlBaldwin 2 ปีที่แล้ว +10

    Great presentation. I learned a lot. I'm a fan of the Pascack Valley Line -- they have recently been running a GP40P heritage unit n CNJ livery, making for a trip back in time!

  • @roycethefox
    @roycethefox 4 หลายเดือนก่อน +1

    I live north of the danbury branch- The Housatonic Railroad Company currently operates between the danbury station, all the way up to pittsfield, MA. I sometimes see them moving around cars, though I've actually been noticing them more frequently.

  • @Token_Nerd
    @Token_Nerd ปีที่แล้ว +3

    Just electrify all of Metro North already. Ned Lamont we're watching.

  • @Agustin01
    @Agustin01 ปีที่แล้ว +4

    I'm from Haverstraw and damn seeing the alignment just being built on is sad. They'll probably never restore service, My neighbor (he was born in the 1910s) as a child went to Haverstraw High School and said he had classmates that came from Suffern and Spring Valley by train. Crazy to think that I got to hear these story's first hand that now seem like fair distant tales. Great video and I look forward to see your alignment!

    • @henryostman5740
      @henryostman5740 ปีที่แล้ว +2

      In 1910 the only alternative to the train was the trolley. Then came the auto and the bus, the rest was history for the passenger rails.

  • @apr859
    @apr859 2 ปีที่แล้ว +4

    The station resturant at naugatuck is actually great

  • @jquas1965
    @jquas1965 ปีที่แล้ว +3

    I’d love to see Waterbury or Hartford to Providence.

  • @deepnation10009
    @deepnation10009 ปีที่แล้ว +2

    I rode this train all of the time in the early 80s when I lived in Ansonia.

  • @Fowlware
    @Fowlware 2 ปีที่แล้ว +6

    this video made a good watch party thanks for this
    i think danbury would be significantly better for the purpose of this video, as, from my personal experience, trains travel very rarely along that. i got stuck on wilton once. screw wilton's layout where you have to cross tracks to get onto the platform.
    danbury branch also uses low level platforms sometimes (merritt 7 is literally a bus station, like ansonia), is a (norwalk to danbury, norwalk has a separate platform just for danbury trains that ends right there), and has, like what, one train traveling on it at any time (usually)?
    anyway, great video. one of the best on the platform. never knew i loved train videos.

  • @johnpjohnson8112
    @johnpjohnson8112 9 หลายเดือนก่อน +2

    the station at 10:00 used to be the Naugatuck Train Station but its now a restaurant "The Station"

  • @kyle.sterritt
    @kyle.sterritt 2 ปีที่แล้ว +4

    If I had to choose one it would be from my home state of Massachusetts and were talking about MBTA’s Newburyport/Rockport Line. This branch always has bridge problems and derailments, Bridges being rebuilt cause the branch half the line to be shut down for periods of time

  • @dimitrilensflareabrams2893
    @dimitrilensflareabrams2893 ปีที่แล้ว +2

    One other thing that would help is the return of industries in the heart of downtowns along that line. Waterbury, Ansonia, Derby, Naugatuck and a lot of other places used to be huge manufacturing towns. Sucks that now they're just ghosts of their former selves.

  • @kevinwong6588
    @kevinwong6588 ปีที่แล้ว +2

    The Waterbury and Danbury branches have the lowest local fares on Metro-North: $2.50. On the New Haven main line and New Canaan branch, base local fare is $2.75 and local intermediate fare in NY State is $3 (outside Manhattan).

  • @WeatheredRails
    @WeatheredRails 2 ปีที่แล้ว +3

    I like the solutions, but there’s one thing involved that may scratch all of that. Money. To put in overhead wires plus a 2nd track. It would be problematic and almost useless, speaking that the ridership numbers do not support more trains and the need for a 2nd track. I can see bigger sidings, since you have P&W CT-2. Which works O&G, and Pan Am Railways PL-1. Which rarely runs to Derby to interchange with the Housatonic Railroad. The time I see a double track main fit is when both freight and Passenger are both incorporated. So that passenger trains can maneuver around freight that might be holding up a part of the line, this includes local freight and if through freight was established like CR NHSE/SENH which ran from New Haven to Selkirk. That’s when a double track main would be needed

  • @qjtvaddict
    @qjtvaddict ปีที่แล้ว +1

    Thank goodness they are increasing service to make it good

  • @HarrisonPeloso
    @HarrisonPeloso ปีที่แล้ว +3

    If haven’t done a review for the housatonic railroad and it’s former passenger service it would be neat learning a thing or two about that.

  • @Natalietrans
    @Natalietrans ปีที่แล้ว +2

    Connecticut rail is one of the rail networks of all time

  • @fusoyaff2
    @fusoyaff2 ปีที่แล้ว +2

    9:26 - high level platform was built in 1997

  • @Goofy1trainofficial
    @Goofy1trainofficial ปีที่แล้ว +2

    Video in a nutshell:
    *S E Y M O U R*

  • @thetrainhopper8992
    @thetrainhopper8992 2 ปีที่แล้ว +3

    I will say the bridge thing isn't as much of a determinate as you would think. The old Santa Fe line from Richmond to Stockton has some bridge abutments that would suggest double tracking, but it wasn't. They had the space to double track it, but at some point in the 60s they started selling off the land. A friend of my mom had across the street neighbors who bought the land to get a bigger back yard. But, the school I worked at had an over pass that has the space for a second track still.

    • @Pensyfan19
      @Pensyfan19  2 ปีที่แล้ว +2

      Good point. However, after looking at old maps and current right of ways for some of these branches, I've noticed that in multiple cases, the right of way can hold as many tracks as there is space available on the bridge, especially if two bridges are less than 5 miles apart from each other.

    • @thetrainhopper8992
      @thetrainhopper8992 2 ปีที่แล้ว +3

      @@Pensyfan19 I'm just saying that they may have had or still have the space to double track and have never done so. At least too far past where known historical double track ended. Not to mention, that depending on how much foresight the railroad had, there could be extant infrastructure where no double tracking existed. Which is true of where I was working.

  • @georgemurphy2579
    @georgemurphy2579 2 ปีที่แล้ว +2

    Thanks for this very-informative presentation!

  • @martindenbleyker7352
    @martindenbleyker7352 ปีที่แล้ว +2

    To truly fix the Atlantic City Line, they should revive the Blue Comet route from NYC to AC via Winslow Jct (mostly the original route) but your suggestion of extending PATCO is a good one, albeit only 15 miles to a connection at Winslow or thereabouts. That would solve the Camden-Philly thing. It was routing the train through Philly that brought down the Amtrak service and NJT stepped in, but only from Philly. That brings me to Allentown. Nothing I'd like more than the extension back out here but when you say "local service", I have to inform you that NJT is not permitted to run any line in more than one other state ergo, it has to be Amtrak to come from NYC. BTW, my road's (Bel-Del) affiliate, Chesapeake & Delaware is now running a recently restored part of the Blue Comet route south of Lakehurst. It is do-able.

    • @Pensyfan19
      @Pensyfan19  ปีที่แล้ว +1

      I think you commented on the wrong video but I absolutely agree that the route of the Blue Comet should be restored.

    • @kenw7287
      @kenw7287 ปีที่แล้ว +1

      Not sure if the Blue Comet rout through the Pine Barrens is even viable anymore? That trackage goes through the Lakehurst Naval Base if i’m not mistaken.

  • @maxsilverstone8600
    @maxsilverstone8600 ปีที่แล้ว +2

    This isn't actually a train video. This is just a Steamed Hams video where the location is the train instead of Principal Skinner's house.

  • @damienpilon9785
    @damienpilon9785 ปีที่แล้ว +4

    0:13 I'm not sure if I'd choose the Candiac line as the odd one out for Montréal. The Mascouche line is probably the weirdest, with it's history of semi electrification and especially now that it takes a super circuitous route to get downtown, and it will soon not go downtown at all

    • @qjtvaddict
      @qjtvaddict ปีที่แล้ว +1

      That line needs to be converted into a REM service.

  • @olivermarinez4961
    @olivermarinez4961 ปีที่แล้ว +2

    I take Grand Central train to Waterbury every weekend

  • @johntherailfan3754
    @johntherailfan3754 2 ปีที่แล้ว +3

    For the Haverstraw line, elevated track or underground track are always an option

    • @qjtvaddict
      @qjtvaddict ปีที่แล้ว +1

      What line is that?

  • @OgaugeTrainsplusslotCars
    @OgaugeTrainsplusslotCars 2 ปีที่แล้ว +1

    Awesome Sharing 👍♐

  • @nathanjiang100
    @nathanjiang100 2 ปีที่แล้ว +4

    I commute daily on the Gladstone branch, so it would be quite interesting to see you review it if you do in your NJT video

    • @joezegers
      @joezegers ปีที่แล้ว +1

      When you realize he actually did the Atlantic City Line and Raritan Valley Line

  • @georgemurphy2579
    @georgemurphy2579 2 ปีที่แล้ว +2

    Dual purpose locomotives is a reasonable suggestion. This would limit the changeover at NH

  • @geoffadams5537
    @geoffadams5537 ปีที่แล้ว +1

    Siding make that crossing loop
    A siding on is actually a track reserved for storing access wagons and other in rolling stock

  • @Lucius_Chiaraviglio
    @Lucius_Chiaraviglio ปีที่แล้ว +2

    When people who built houses over the right-of-way decide to go into NIMBY mode, we should tell them "you should have thought of that before you put your back yard on property that isn't yours". Or did some idiot or crook (or both) in state management actually sell it lawfully to the developers?

  • @broyofroyo1207
    @broyofroyo1207 2 ปีที่แล้ว +2

    Do more videos like this

  • @briandynamite7942
    @briandynamite7942 2 ปีที่แล้ว +2

    Can someone please tell me what app he is using, showing all the different rail lines in the state abandoned or not, and what company they belonged to. I would have ages of fun with that.

    • @Pensyfan19
      @Pensyfan19  2 ปีที่แล้ว

      Rail Guide. It's available on the Google Play Store.

    • @briandynamite7942
      @briandynamite7942 ปีที่แล้ว +1

      @@Pensyfan19 thank you, love your content.

  • @alexisdespland4939
    @alexisdespland4939 ปีที่แล้ว +1

    is this branch timed to meet the lo cross long island sound ferries

  • @railsand
    @railsand 7 หลายเดือนก่อน

    large w video thanks boss

  • @EpicThe112
    @EpicThe112 ปีที่แล้ว +2

    What metro North needs to do is look at some overseas stations in UK and Germany Dresden VVO RMV Frankfurt am Main to see if you can Actually integrate a restaurant which was actually the original station and new platform although the platform height should be 121cm 48 in To match the other platforms on the electrified portion and Waterbury. Ideal train is a Flirt Dual Mode like a UK class 755 flirt Electric mode until the Junction with Waterbury Branch then Diesel from there to Waterbury. The worst case scenario is that the electrical system has failed and must run diesel all the way to grand central terminal like a Brookville locomotive in rare situations. Between Waterbury and Hartford why not put Light rail tracks On the existing right of way for the busses then operated like like Seattle Transit tunnel when it had Buses and Trams running through there. On the Busway it would go something like this bus gets there then the tram then the bus

  • @jeremeylombard9017
    @jeremeylombard9017 ปีที่แล้ว +1

    I wanna take this train to work in Bridgeport but the time table doesn’t work for me :’(

  • @alexisdespland4939
    @alexisdespland4939 4 หลายเดือนก่อน +1

    if it dose get coverted in should get t extensions one south to at least the long island ferry pier and the to Bridgeport university via both a station linked to both the stadium and ampetheater. and north from waterbury staion t via waterbury green and then north along hill strret to the waterbury mall or east to both the cherry valley mall an, waterbury hospital and a slight bit north to the waterbury stadium whose paringlot would get pronably both the maitenece center and a new bus intherchagre

  • @davidsp5936
    @davidsp5936 ปีที่แล้ว +1

    "Upstate?"

  • @brendanu1680
    @brendanu1680 ปีที่แล้ว +1

    Will You Do Every Commuter Rail Agency Eventually?

    • @Pensyfan19
      @Pensyfan19  ปีที่แล้ว +1

      Only those with 4 or more branch lines. The episode for SEPTA will likely be released next month.

  • @CTrail1711
    @CTrail1711 2 ปีที่แล้ว +2

    Where did you get the ridership info?

    • @Pensyfan19
      @Pensyfan19  2 ปีที่แล้ว +2

      That chart was based on 2018 figures in the Trans Regional Express proposal, so it may not be entirely accurate to today's standards, but still shows a general trend when compared to other branch lines.

    • @CTrail1711
      @CTrail1711 2 ปีที่แล้ว +2

      @@Pensyfan19 Thanks

  • @EasternSeaboardProductions
    @EasternSeaboardProductions 2 ปีที่แล้ว +1

    Fix the Atlantic Branch!

  • @alexisdespland4939
    @alexisdespland4939 ปีที่แล้ว +1

    the line should loop the trains so what gose up the valle to Waterbury comes back to Bridgeport vie Danbury and stamford and if the ferries come back time them ti meet the ceoss sound ferries,

    • @MosheFeder
      @MosheFeder 4 หลายเดือนก่อน

      Alas, the amount of new ROW that would require makes it an utter fantasy.

    • @alexisdespland4939
      @alexisdespland4939 4 หลายเดือนก่อน

      @@MosheFeder what new roght of way ther is already a frieght line betwen danbiry and waterbury might need awkardly placed or expensive to buils new swishes.

  • @tobygoodguy4032
    @tobygoodguy4032 ปีที่แล้ว +1

    Way, (wei?) too much $ to do anything more than to administer oxygen to these lines.
    (All the taxpayers are moving out.)
    I like they way your voice sounds at 0.75 playback speed.🤠

  • @Maunico0809
    @Maunico0809 2 ปีที่แล้ว +1

    ACL Moment

  • @henryostman5740
    @henryostman5740 ปีที่แล้ว +1

    The line probably doesn't have enough traffic or even potential to justify two tracks. Furthermore most traffic is in the demand direction, folks commuting into NYC during rush hour and return later that day. I would be much cheaper to run a bus in the reverse direction and I bet everybody would have a seat. It would be better if this could be a through service to GC. There aren't too many alternatives for the rolling stock, the old Budd cars are 70 years old and Budd is out of business and nobody makes a railcar to FRA standards nor is anybody going to make one since the potential market is so small. Since there is no freight traffic on this line, they could use the diesel tram cars that NJ uses on its Camden/Trenton line. Not enough trains to justify electrification. I am a transit and train advocate but you have to be real, commuter lines are big time money losers even when the have good ridership, simply the fares are too low and the expenses too high. Locomotive engineers make more than most airline pilots and have a steadier job with a better benefit history (airlines go bankrupt and cancel their retirement, the railroad plan is federal and you don't want to hear of their not paying, everything would close immediately). governments have a lot of differing responsibilities and have to allocate available funds generally going to whoever screams the loudest. Nobody really cries for 'rich' suburban commuters.

    • @MosheFeder
      @MosheFeder 4 หลายเดือนก่อน

      @henryyostman5740 - I don't think there's much commuting to and from NYC taking place on the Waterbury Branch. The trip is just way too long. Not many people want to spend five hours on the train every weekday. That's right, it takes 2½ hours or more to get from someplace like Naugatuck to GCT. And then you still aren’t at your office! I think you'd have to somehow get that down to 90 minutes max before many people would do it. If that's even theoretically possible, it couldn’t be done at an affordable cost.
      A much better prospect to increase ridership would be service to Hartford. It's a much shorter trip and I think people who currently make that commute by car would welcome the alternative. It wouldn’t be long before the whole Naugatuck Valley became more appealing as a Hartford suburb. Higher service frequency might also increase its appeal for people who want to commute to Bridgeport.
      In the long run, one-seat service from GCT via Waterbury to Hartford and back might actually allow the branch to finally pay its way.

  • @kevinb9327
    @kevinb9327 ปีที่แล้ว +2

    This is a great idea for a video channel. Your narration isn't so great. Good modulation, but you speak too fast. 👍.