Semicircle or shaft how to vertical steel calculation for civil construction railway site
Basic procedure for calculation of vertical bar is same.
The minimum tiebar is always 10 mm. Here we have a big kolom of 500 mm than the tiebar must be 12 mm.8 mm tiebar is crab and to week and dangerous for the construction
you might be right.this video is about quantity calculation of steel,its not about designing.
You did not substract cover and bend length in main bar length calculation
Yes you are right.it is usually neglected because it is covered in overlapping
Bhai dia-420mm h to radius 220mm hogi n
Yes radius is 210mm
Correction everyone:at 08:23 value of radius is equals to 210mm not 110mm.Rest procedure remains the same.
Radius is 220mm
220nhi 210 hogi
Nice
Thanks dear,keep visiting
Semicircle or shaft how to vertical steel calculation for civil construction railway site
Basic procedure for calculation of vertical bar is same.
The minimum tiebar is always 10 mm. Here we have a big kolom of 500 mm than the tiebar must be 12 mm.
8 mm tiebar is crab and to week and dangerous for the construction
you might be right.
this video is about quantity calculation of steel,its not about designing.
You did not substract cover and bend length in main bar length calculation
Yes you are right.it is usually neglected because it is covered in overlapping
Bhai dia-420mm h to radius 220mm hogi n
Yes radius is 210mm
Correction everyone:
at 08:23 value of radius is equals to 210mm not 110mm.
Rest procedure remains the same.
Radius is 220mm
220nhi 210 hogi