loading truck Bingham Canyon Copper Mine

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 พ.ย. 2024

ความคิดเห็น • 35

  • @fbrykatuuk1271
    @fbrykatuuk1271 4 ปีที่แล้ว +8

    I think it's too far to reverse loading, maybe the loading area can be improved so it can save maneuvering time.

  • @adamdennis7016
    @adamdennis7016 3 ปีที่แล้ว +3

    Must be training, if bucket presented like that you can go through cable arch to reverse under bucket. Had plenty of room fit two 797 in there.

  • @randallhorrocks3451
    @randallhorrocks3451 ปีที่แล้ว

    I will say this, that driver could’ve definitely made a turn inside the candle sticks, but not all drivers. Are that good for some reason regardless of their training. that 97 shovel was a good shovel. It got buried in the main Fay slide and we had to dig it out piece by piece.

  • @outbackAus260
    @outbackAus260 2 ปีที่แล้ว +1

    Poor mine planning there. Bence should be wide enough for double-side loading so the shovel can reach peak cycle times without having to hang wait for a long reverse run on a single truck.

  • @carterbarsoom374
    @carterbarsoom374 6 ปีที่แล้ว +2

    Very smooth operator...that must be at least a 30 yard bucket..

    • @turningpoint6643
      @turningpoint6643 4 ปีที่แล้ว +1

      50-60 yards. About 120 tons per pass.

    • @alco4248
      @alco4248 3 ปีที่แล้ว +2

      @@turningpoint6643 It's only a C model, not an XPC, so about 90 tons per pass.

  • @josealfonsofiguertroyo2816
    @josealfonsofiguertroyo2816 ปีที่แล้ว

    Que.belleza de forma de rec9ger el.cobre.

  • @emilianocortescortes8271
    @emilianocortescortes8271 ปีที่แล้ว

    Como puede haber produccción en esa mina con esa pasta!!

  • @garymclean4692
    @garymclean4692 5 ปีที่แล้ว +7

    Is the guy with the camera pissed !!??

  • @johnfahey7215
    @johnfahey7215 5 ปีที่แล้ว +4

    Camera motion made me sea sick

  • @SupermanJH68
    @SupermanJH68 4 ปีที่แล้ว +6

    Entirely too slow operation for my taste.
    Camera person very confused.

  • @briangarcia1970
    @briangarcia1970 ปีที่แล้ว

    Thats too far. 😂
    Thats not how we do at coal mining.

  • @NocyMusic
    @NocyMusic 2 ปีที่แล้ว

    Caterpillar rules the earth 🌍

  • @andrewrees8749
    @andrewrees8749 4 ปีที่แล้ว +1

    Should be 2 sided loading, plus cable stands are in the way of the operation, way too long backing up to the shovel.

    • @turningpoint6643
      @turningpoint6643 4 ปีที่แล้ว

      I'd say there chasing ore the way it's set up and they don't have much choice. That mines been in operation more than long enough they wouldn't make mistakes like that without some good reasons.

  • @saitromkhare
    @saitromkhare 2 ปีที่แล้ว

    ႁု

  • @jasonlucas9754
    @jasonlucas9754 3 ปีที่แล้ว +1

    Look at back up time, wow!!! Also look at big swing. Poor video to post!!

  • @eliaslopez3452
    @eliaslopez3452 4 ปีที่แล้ว +2

    that shovel operator is not good lasts a long time loading that truck must be loaded with two passes that shovel for that is designed

    • @gm08351
      @gm08351 4 ปีที่แล้ว +1

      ah yes, very good English

    • @everettduncan7543
      @everettduncan7543 4 ปีที่แล้ว

      @@gm08351 but he has a point. Operation is too slow

    • @tutekohe1361
      @tutekohe1361 4 ปีที่แล้ว +1

      Caterpillar has worked out the most efficient loading is between 2 and 4 passes, so at 3 passes this loading cycle is ideal.

    • @turningpoint6643
      @turningpoint6643 4 ปีที่แล้ว +4

      And your a shovel operator for which mine? If you were one you'd already know that they don't make shovels large enough to load that size of truck in two passes. His swing radius is that large because of the waste rock on the outside of the blasted material. Because of the layout I'd say there chasing ore and don't have much choice until that bench advances a bit more. With a narrow dig face like that and no room for loading both sides the operator has to constantly remove material so the shovels counterweight doesn't hit while rotating that far to load the truck.

    • @alco4248
      @alco4248 3 ปีที่แล้ว +1

      @@turningpoint6643 They do actually make shovels big enough to 2 pass load a 793. P&H makes the 4100XPC at 120 tons per pass, and the 4800XPC at 135 tons per pass. Cat makes the 7495 at 120 tons per pass. Since this is only a 240 ton truck, it would be very possible to load it in two passes. Oh, and I am a shovel operator, in Northern Canada.

  • @bhikhamlalsahu1586
    @bhikhamlalsahu1586 5 ปีที่แล้ว +1

    Digging earth and environment change by human

  • @frankanddanasnyder3272
    @frankanddanasnyder3272 5 ปีที่แล้ว +2

    Could be much more efficient..too much backing up for the trucks

  • @santoshtechnology
    @santoshtechnology 2 ปีที่แล้ว

    प्लीज हमारा यूट्यूब वीडियो देखें भाई अच्छी तरह से जानकारी मिलेगी माइंस कै बारे में
    मेरा यूट्यूब चैनल है Santosh technology

  • @MuhammadAli-qo3bv
    @MuhammadAli-qo3bv 5 ปีที่แล้ว

    I'm Operator Rope shovel wk10B of china
    and want to operate this

  • @neillmalherbe4969
    @neillmalherbe4969 3 ปีที่แล้ว

    Un productive

  • @alessandrosorbello1980
    @alessandrosorbello1980 4 ปีที่แล้ว

    Nu